Loading...
HomeMy WebLinkAboutCompaction Test Headquarters 1 � Mailing ENGINEERING 11345 U.S. Highway 1 PO Box 78-1377 Sebastian, FL. 32958 % TESTING Sebastian, FL. 32978 Orlando Phone: 772-589-0712 723 Progress Way SOIL COMPACTION REPORT C.A.#5693 Sanford, FL. 32771 ASTM D 1SS7,and ASTM D 6938 KSMengineering.net DATE TESTED: May 6, 2020 KSM JOB#: 201970-2d/CH/ct PERMIT#: 2003-0389 NUC# 417 CONTRACTOR: D& M Concrete Nuc Model: 3500 JOB LOCATION: 10799 Orange Avenue Nuc Serial#: 3417 Ft. Pierce, Florida ITEM TESTED: Shed-Retest TEST LOCATION PEN DRY MAX. DRY PERCENT DEPTH OF SAMPLE READ DENSITY PROCTOR VALUE(P.C.F) COMPACTION 1. N.E. 0"- 12" 40 108.9 110.4 98.6% 2. Center 49 109.7 99.4% 3. S.W. 45 109.3 99.0% Soil Description: W 111.0 I I I I I I Brown Sand with E I I Shell &Clay I I I I I In Place Moisture: G 110.0 t— _.1_.._.I. _l._ J.._..1.._... 10.6% H I T I Proctor Optimum Moisture: I I I I 12.0% P I I I I I 109.0 J—.._.�_. '._..—� — .�.. �..._... Proctor Max. Dry Density:P.C.F. C I 110.4 I I F I I I I @ Test Locations the Density& Penetrometer readings indicate the 108.0 1— Degree of Compaction Meets D Minimum Requirement R I I I I I I Y I I I I I for Staked Foundation 107.0 — ;— — —� — —; — -;• — , Respectfully Submitted: 9 10 11 12 13 14 15 Moisture-%of Dry Weight Disclaimer: Contractor is responsible to maintain ��.�����, ;• C��C''•, the tested area in the condition that KSM �•� �::'�,10ENS�.o�,� completed the indicated passed compaction test. KSM is not responsible if the tested area has been h1o. 68366 altered from the approved inspected condition. u V'.04-*- 1 P � • JAI_ 5/7/2020 Proudly Serving Florida since 1990