Loading...
HomeMy WebLinkAboutCompaction Test (2) Man Headquarters C! lk ArENGINEERING PO Box 78-1377 11345 U.S. Highway 1 Orlando Sebastian, FL. 32958 1/ AND TESTINGSebastian,Phone: 772 589-0712 723 Progress Way SOIL COMPACTION REPORT C.A.#5693 Sanford, FL. 32771 ASTM D 1557 and ASTM D 6938 KSMengineering.net DATE TESTED: May 19,2020 KSM JOB#: 202083-4d/SH/jo PERMIT#: 2003-0505 NUC# 630 CONTRACTOR: Dave Golden Homes Nuc Model: MC-10R-P JOB LOCATION: 4920 Conley Place Nuc Serial#: 30630 Ft. Pierce, Florida ITEM TESTED: Compacted Foundation Fill-Final Lift TEST LOCATION PEN DRY MAX. DRY PERCENT OF SAMPLE DEPTH READ DENSITY PROCTOR VALUE(P.C.F) COMPACTION 1. N.W. 24"-36" 45+ 107.3 108.9 98.5% 2. N.E. 108.1 99.3% 3. Center 107.6 98.9% 4. S.E. 108.3 99.4% 5. S.W. 107.5 98.7% Soil Description: 110.0 Brown Sand with W E I I I I I Some Clay In Place Moisture: G 109.0 11.6% H I I I I T Proctor Optimum Moisture: 108.0 j- — j— — I — —( — —••-!-••—• 12.0% P I I I Proctor Max. Dry Density:P.C.F. C 108.9 107.0 �— — I— — I•—..—I —..�..—. —... F I I I I I @ Test Locations the Density& I I I Penetrometer readings indicate the Degree of Compaction Meets R I I I I I Minimum Requirement Y I I I I I for Unstaked Foundation 105.0 Respectfully Submitted: 9 10 11 12 13 14 15 1f111fIf Moisture-%of Dry Weight E. .�' ��� ••••••• °�( Disclaimer: Contractor is responsible to maintain �0 ;•C1CiENS •. r •: �y the tested area in the condition that KSM No. 683,66 completed the indicated passed compaction test. _ --- --- KSM is not responsible if the tested area has been roved inspected condition. sTArE _ altered from the approved p OF a • P eside ••''''' PE#68366 5/20/2020 Email to: St Lucie Building Department; dave@davegoldenhomes.com Proudly Serving Florida since 1990