Loading...
HomeMy WebLinkAboutDuct Sealing Cert Plannin &Development Services Building&Code Regulation Division 2300 Virginia Ave,Rm 201 Fort Pierce,FL 34982 772-462-2165 Fax 772-062-6443 FBC ENERGY CONSERVATION CODE Duct Sealing Certification Prescriptive and Performance Method Date: _W/1 4/...20U Permit#: Lot#• Contractor. W*jeJucaEy Address: 2rI0!riSQrA4 C1a-va131Vd. FL 3`i45f Construction: o Post construction Test o Rough-in Test Test Conditions: Date: &4/I4/*282A Floor Area(ft2): �D_p Time: S:5tl Primary Location of Supply Ductwork #�.. Indoor Temperature(F): '75 Primary location of Return Ductwork 1�1.L•(1. Outdoor Temperature(F): '78 r tal Leakaae Test(Outsidelud Leakage: o Default o Prop.Leak Free Proposed tanst Pressure: 25 (Pa) seline Duct Pressure(optional) (Pa) ct Press (Pa) Flow Ring Fan Press Flow(cfm) Results: o Pass o Fail Installed Pa Total Leakage(dm): t'�Q9r D.f19t:� Total Leakage per 100 sgft_ 3.4%- CFM25 x 100 divided 6y the CFA=Duct Leakage CFMf100 sgft• Testinra Company Company Name: •Zz Address: 2223 i hereby certify that the above Duct Sealing Leakage results demonstrate compliance with P Edition FBC Energy Conservation requirements in accordance with Section R403.2.2. Signature' Printed Name: TR Qee License0ertificate#: E3SFSC.r