HomeMy WebLinkAboutDuct Sealing Cert Plannin &Development Services
Building&Code Regulation Division
2300 Virginia Ave,Rm 201
Fort Pierce,FL 34982
772-462-2165 Fax 772-062-6443
FBC ENERGY CONSERVATION CODE
Duct Sealing Certification
Prescriptive and Performance Method
Date: _W/1 4/...20U Permit#: Lot#•
Contractor. W*jeJucaEy Address: 2rI0!riSQrA4 C1a-va131Vd. FL 3`i45f
Construction: o Post construction Test o Rough-in Test
Test Conditions:
Date: &4/I4/*282A Floor Area(ft2): �D_p
Time: S:5tl Primary Location of Supply Ductwork #�..
Indoor Temperature(F): '75 Primary location of Return Ductwork 1�1.L•(1.
Outdoor Temperature(F): '78
r
tal Leakaae Test(Outsidelud Leakage: o Default o Prop.Leak Free Proposed tanst Pressure: 25 (Pa)
seline Duct Pressure(optional) (Pa)
ct Press (Pa) Flow Ring Fan Press Flow(cfm) Results: o Pass o Fail
Installed Pa
Total Leakage(dm): t'�Q9r D.f19t:�
Total Leakage per 100 sgft_ 3.4%-
CFM25 x 100 divided 6y the CFA=Duct Leakage CFMf100 sgft•
Testinra Company
Company Name: •Zz Address: 2223
i hereby certify that the above Duct Sealing Leakage results demonstrate compliance with P Edition FBC Energy Conservation requirements in accordance with
Section R403.2.2.
Signature'
Printed Name: TR Qee License0ertificate#: E3SFSC.r