CERTIFICATE OF TERMITE TREATMENT
CONSTRUCTION SOIL TREATMENT
PERMIT #:. JOB ADDRESS: -C6_Y7 �^-
BUILDER/CONTRACTOR:
PEST CONTROL CONTRACTOR:
PEST CONTROL LICENSE #:
We, the undersigned, hereby certify that we have pretreated the above described construction for
subterranean termites in accordance with the standards of the National Pest Control Association.
Square feet if area treated: Chemicals used:
Pe°rcentage of solution: ��jo Total gallons used:
Date'of*Treatment: � � Time of Treatment: VAOt—V-\\
Footing Slab
1'. Treatment 1st Treatment
Re-Treat Re-Treat
Driveway Pools
15t Treatment 1st Treatment
e-T_reat Re-Treat
Other Perim r Final Inspection
1st Treatm _
������Re-Treat
Sig ure of Exterminator Date
Note; There must be a completed form for each r red treatment or re-treatment and this form must be on the job
site to be picked up by the inspector at time o ch inspection or the scheduled inspection will fail and a re-inspection
fee charged,
FBC104.2.6 Certificate of Protective Treatment for prevention of termites. A weather resistantjobsite posting board
shall be provided to receive du licate Treatment Certificates as each required protective treatment is completed,
p P 9
providing a copy for the person the permit is issued to and another copy for the building permit files, The Treatment
Certificate shall provide the product used, identity of the applicator, time and date of the treatment, site location, area
treated, chemical used, percent concentration and number of gallons used, to establish a verifiable record of
protective treatment. If the soil chemical,barrier method for termite prevention is used, final exterior treatment shall
be completed prior to final building approval.
St Lucie County requires for the final inspection for CO, a Permanent Sticker to be placed on
the electrical panel box cover, listing all the treatments and dates of applications.
Revised 7/24/2014
Planning &Development Services
Building & Code Regulation Division
2300 Virginia Ave
Fort Pierce,FL 34982
772-462-2172 Fax 772-462-6443
CERTIFICATE OF TERMITE TREATMENT
CONSTRUCTION SOIL TREATMENT
PERMIT #: ��l��p--C��tir� 1 30B ADDRESS: �51C�-� �,,n�, Cc�
BUILDER/CONTRACTOR:
PEST CONTROL CONTRACTOR:
PEST CONTROL LICENSE #: ,,9-�VRSg
We, the undersigned, hereby certify that we have pretreated the above described construction for
subterranean termites in accordance with the standards of the National Pest Control Association.
Square feet if area treated: Chemicals used:
Percentage of solution: u Flo Total gallons used:
Date of Treatment: -� /m 'Time of Treatment:
Footing Slab
15t'Treatment 11t Treatment
Re-Treat Re-Treat
Driveway Pools
15t Treatment 11t Treatment
e-Treat Re-Treat
.Other - Perim r Final Inspection
1'Treatm
Re-Treat � ��� - Z /z
Sig ure of Exterminator Date
Note; There must be a completed form for each r red treatment or re-treatment and this form must be on the job
site to be picked up by the Inspector at time o ch inspection or the scheduled inspection will fall and a re-inspection
fee charged,
FBC104.2.6 Certificate of Protective Treatment for prevention of termites, A weather resistantjobsite posting board
shall be provided to receive duplicate Treatment Certificates as each required protective treatment is completed,
Pro viding a copy for the person the permit is issued to and another copy for the building permit files. The Treatment
Certificate shall provide the product used, identity of the applicator, time and date of the treatment, site location, area
treated, chemical used, percent concentration and number of gallons used, to establish a verifiable record of
protective treatment. If the soil chemical barrier method for termite prevention is used, final exterior treatment shall
be completed prior to final building approval.
St Lucie County requires for the final inspection for CO, a Permanent Sticker to be placed on
the electrical panel box cover, listing all the treatments and dates of applications.