Loading...
HomeMy WebLinkAboutCompaction Test Heaaquarters e Mailing 11845 U.S. Highway 1 E L IKO PO Box 78-1377 Orlando Sebastian, FL. 32958 TESTINGSebastian,Phone: 772 589-0712 723 Progress Way SOIL COMPACTION REPORT C.A.#5693 Sanford, FL. 32771 ASTM D 1557 and ASTM D 6938 KSMengineering.net DATE TESTED: April 20, 2020 KSM JOB#: 201818-1d/5H/jo PERMIT#: 2001-0637 NUC# 528 CONTRACTOR: Wynne Development Nuc Model: MC-10R-P JOB LOCATION: 38 Spanish Way Nuc Serial#: MD049528 Spanish Lakes 1 Port St Lucie, Florida ITEM TESTED: Compacted Foundation Fill TEST LOCATION DEPTH PEN DRY MAX. DRY PERCENT OF SAMPLE READ DENSITY PROCTOR VALUE(P.C.F) COMPACTION 1. S.W. 0"-12" 39 108.4 112.8 96.1% 2. N.W. 40 108.8 if96.5% 3. Center it 41 109.9 97.4% 4. N.E. 40 109.3 96.9% 5. S.E. 40 109.1 96.7% Soil Description: 114.0 Brown Sand with Shell W E I I I I I I In Place Moisture: G 113.0 10.6% H I I I I T Proctor Optimum Moisture: 112.0 — 1— — I —� — —.•1...— 11.0% P I I I I Proctor Max. Dry Density: P.C.F. C I I I I I 112.8 111.0 F I I I I I @ Test Locations the Density& I I I I Penetrometer readings indicate the D 110.0 .i — ...... — — Degree of Compaction Meets R I I I I I .Minimum Requirement Y I I I I I for Staked Foundation 109•0 ••—•;— — ; — —: — — T — , Respectfully Submitted: 8 9 10 11 12 13 14 Moisture-%of Dry Weight Disclaimer: Contractor is responsible to maintain the tested area in the condition that KSM 6�®ol° �L14 completed the indicated passed compaction test. KSM is not responsible if the tested area has been ��- 3 �•`'`OEfJS°�••�`:� P altered from the approved inspected condition. ° iVo. 6$366 doe 4- 4/21/2020 • J e Erri�l�i`�f�l��flllu i ding Department Proudly Serving Florida since 1990