Loading...
HomeMy WebLinkAboutCompaction Test o?002 - 0'3 7/ Soil Nuclear Gauge Client: Project: Report Date: 5/4/2020 Cole Construction 17-6100.00 i'�RNATON" Test Method:ASTM D 6938 497 S Brocksmith Road Cole Construction Master Agreement Port St.Lucie Fort Pierce, FL 34954 Various Locations FSPE CA#4930 FL 607 NW Commodity Cove Port St.Lucie,FL 34986 Phone:772-924-3575 1 Fax:772-924-3580 _ Test Results Optimum Maximum In Place In Place Probe Min/Max Retest Test Soil Moisture Dry Density Moisture Dry Density Depth Percent Comp. Test# Of Date Proctor ID Method Classification N (pcf) N (pcf) (in) Compaction N Remark 16 4/28/20 P-1 N/A 12.8 103.5 11.4 102.5 12 99 95/105 Pass • Test Information Gauge Test# Test Location Elevation Reference Make/Model/SN/Calibrated Field Technician 1 16 Below Slab Grade:3101 Matthews Rd,Ft Pierce,Back patio,Center 1 0-1 Troxler/3430/24566/ Hayes,Sean Remarks I Comments Pass:Tests results comply With specifications Tests are"Direct Transmission"(Method A)unless probe depth is noted as "Backscatter".Gauge calibration data on file with the testing agency. !.d 1 i.ate'. (1j1 75 �� � MAC{ zbN1 v it'd 1'� � St" 4.f;t�'�`� �'-�►�1��yr, �'L JINN \ V\GENS,c' No 63 8 65/0412020 i� Kent,16.E. PtA siona ibi er.9 Stfdri�tl�RID !ONA�E\\�� Test Reports shall not be reproduced,except in full,without the written approval of GFA International Inc. Page 1 of 1 Digitally signed printed copies of this document are not considered signed and sealed and the signature must be verified on any electronic copies.