HomeMy WebLinkAboutTermite Treatment ! !
Planning &Development Services
Building&Code Regulation Division
C0U NT Y 2300 Virginia Ave
• Fart Pierce,FL 34982
- 772-462-2172 Fax 772-462-"43
CERTIFICATE OF TERMITE TREATMENT
CONSTRUCTION SOIL TREATMENT
PERMIT #: 0 O�- "0 �I q JOB ADDRESS: -5� �t 9 'C CoAJ-6 *��e C
BUILDER/CONTRACTOR: —1 kQ ��— pladcl, I
PEST CONTROL CONTRACTOR: EVICT-A-BUG TERMIT&PEST CONTROL AC.
PEST CONTROL LICENSE #: JB175775
We,the undersigned, hereby certify that we have pretreated the above described construction for
subterranean termites in accordance with the standards of the National Pest Control Association.
Square-feet if area treated: Chemicals used: DOMINION 2L
Percentage of solution: .05% Total gallons used:
Date of Treatment: 0 Time of Treatment:
mooting ___Slab -
i14 Treatment —1st Treatment
ate-Treat Re-Treat
driveway Pools
_ _1-Treatment ist Treatment
_Re-Treat / Re-Treat
—Other Peri eter for Final Inspection
ie Treatment (0 - �Q
_Re-Treat
Sig re of Extermin r Date
Note; There must be a completed form for each required tr iment or re-trey ent and this form must be on the job
site to be p/cked up by the Inspector at Me of each inspectlon or the scheduled Inspection will fail and a re-inspection
fee charged,
FBC104.2.6 Certificate of Protective Treatment for prevention of termites A weather reslstantjobsite posting board
shall be provided to recelve duplicate Treatment Certlf/cates as each required protective treatment is completed,
prov/ding a copy for the person the perm/tIs Issued to and another copy for the bullding permit flies The Treatment
C®rtlf/cste shall pro vide the product used,Identity of the applkator, time and date of the treatment, site location,area
treated,cham/ca/used,percent concentratlon and number ofgallons used, to establish a verlflable record of
protective treatment, If the soil chem/ca/barrier method for termite prevention Is used, final exterlor treatment shall
be completed prior to f/na/bulld/ng approval,
St Lucie County requires for the final inspection for CO,a Permanent Sticker to be placed on
the electrical panel box cover, listing all the treatments and dates of applications.
it
wed 7/24/2014