HomeMy WebLinkAboutEnergy Code1HEATING & COOLING LOAD SUMMARY SHEET
u u
Project Name: 1✓lAwu-r,,4r-rumj.) GuiLPw 3
Project Owner: AT-(,APT-tc. 777-655 (:::;pkA.PAdJy
Project Address:
Sizing Method Used: ASHRAE Handbook of Fundamentals, 1997, Chapter26
Compliance Criteria: Florida Building Code, 2001 Edition
Section 407.1.ABCD.1 Sizing, Exception #1
Heating/Cooling Zone
Aµu /c11—i
AKLI./ cd-2•
Conditioned Floor Area (sq.ft.)
3 rj g
('64
Outdoor Dry Bulb (°FDB)
91,0
0
Outdoor Wet Bulb ( °FWB)
7 $, O
7'8.0
Indoor Dry Bulb ( °FDB)
757. b
Indoor Relative Humidity
SO CFO
S070
Difference Water Vapor (Grains/lb.)
S qe
Cooling Sensible Load (BTUH)
I-L) lOp
'7, 84c3
Cooling Latent Load (BTUH)
�j7 6 q O
Cooling Total Load (BTUH)
with required outdoor air
17/ 740
911 1 O
Heating Total Load (BTUH)
with required outdoor air
HVAC systems and equipment sizes thus comply with Florida Building
Code, 2001 Edition, Section 407.1.ABCD.1.1: D\k q. BM — :I-
ENERGY`EFFICIENCY CODE�FOR-BUILDIlVGCONSTRUCTION T
4 'Flonda Departineiitiif Comuium Affairs ty
f EnergyGauge FlaCom v121FORM 400A 2001
jµRTholeBuildmg P,erformauce Method'for Couuner'cial Buildings
— . � m-
Jurisdiction: FORT PIERCE, ST LUCIE COUNTY, FL (661100)
Short Desc: ATLTRMFG03 Project: MANUFACTURING BUILDING
Owner: ATLANTIC TRUSS COMPANY
Address: Ft. Pierce
x
City: Ft. Pierce
State: Florida PermitNo: Pending
Zip: 34954 Storeys: 2
Type: Office (Business) GrossArea: 1013
Class: New Finished building Net Area: 1013
.11 Compliance Summary 11
Component Design Criteria Result
Gross Energy Use 97.41 100.00 PASSES
Other Envelope Requirements - A PASSES
LIGHTING CONTROLS
EXTERNAL LIGHTING
HVAC SYSTEM
PLANT
WATER HEATING SYSTEMS
PIPING SYSTEMS
Met all required compliance from Check List?
10/7/03
PASSES
PASSES
PASSES
PASSES
PASSES
PASSES
Yes/No/NA
EnergyGauge MaCom FLCCSB v1.21 \ 1
COMPLIANCE CERTIFICATION:
I hereby certify that the plans and specifications Review of the plans and specifications covered by this
covered by this calculation are in compliance calculation indicates compliance with the Florida Energy
with the Florida Energy Efficiency C de Efficiency Code. Before construction is completed, this building
will be inspected for compliance in accordance with Section
553.908, Florida Statutes.
-PREPARED BY:
Y
DATE:
BUILDING OFFICIAL:
DATE:
I hereby certify (') that the system design is in compliance with the Florida Energy Efficiency Codi
SYSTEM DESIGNER
ARCHITECT:
MECHANICAL:
ELECTRICAL:
LIGHTING:
REGISTRATION/STATE
(7 Signature is required where Florida Law requires design to be performed by registered design professionals.
Typed names and registration numbers may be used where all relevant information is contained on signed/sealed plans.
10/7/03 EnergyGauge FtaCom FLCCSB v1.21 2
0
Project: ATLTRMFG03
Title: MANUFACTURING BUILDING
Type: Office (Business)
Location: FORT PIERCE, ST LUCIE COUNTY, FL (661100)
Whole Building
IDesign JReference
Total 97.41 100.00
msc
'�10-1 4
-,� I 11 1 4.04')Own"&
IRACE.00
4.15
5.
.01.
SPACE HEAT
4.84,
6.74
�'�--
J
VENT FANS
9-
2.59- -1
.4
& Penalties (if any): Modified Points: = 97.41
10/7/03
EnergyGaugeFlaCom FLCC!SB vl.21
k.,
r
Project: ATLTRMFG03
Title: MANUFACTURING BUILDING
Type: Office (Business)
Location: FORT PIERCE, ST LUCIE COUNTY, FL (661100)
(WEA File: DAYTONAB
Other Envelope Requirements
Item Zone Description Design Limit Meet Req.
Zo 1 Zo 1 Exterior Roof - Max Uo Limit 0.03 0.09 Yes
Z02 Z02 Exterior Roof - Max Uo Limit 0.03 0.09 Yes
Meets Other Enveloue Reauirements
External
Category
:t: ATLTRMFG03
MANUFACTURING BUILDING
Office (Business)
ion: FORT PIERCE, ST LUCIE COUNTY, FL (661100)
File: DAYTONAB
Lighting Controls G
Allowance Area or ELPA CLP
(W/Unit) Length (W) (W)
Area
No. of
Design
Min
Compli-
Acronym
Ash-
rae ID
Description
(sq.ft)
Tasks
CP
CP
ance
Zol
6
Food Service - Fast Food/Cafeteria
358
1
2
2
PASSES1
Z02-Ofc
32
Offices (Partitions<3.5 ft below
424
1
2
2
PAS$ES
ceiling) Open plan offices 900 ft or
larger with partitions higher
Z02-Sto
44
Storage & Warehouse -Inactive
231
1
2
2
EAS$E§
Storage
10/7/03
EnergyGauge FlaCom FLCCSB vl.21
4
Project: ATLTRMFG03
Title: MANUFACTURING BUILDING
Type: Office (Business)
Location: FORT PIERCE, ST LUCIE COUNTY, FL (661100)
(WEA File: DAYTONAB
System
Report Compliance
Zol. AIfU/CU-1
Unitary Systems
Capa- Design Eff Design
IPLV
Comp -
Component Category
city Eff Criteria IPLV
Criteria
]lance
Cooling System Air Cooled < 65000 Btu/h
18800 12.40 10.00 12.40
PASSES
Cooling Capacity
Heating System Electric Furnace
16380 1.00 1.00
PASSES
Air Handling Air Handler (Supply) -
10 0.80 0.80
PASSES
System -Supply Constant Volume
Z02 AHU/CU-2'
Unitary Systems
Capa- Design Eft Design
IPLV
Comp -
Component Category
city Elf Criteria IPLV
Criteria
fiance
Cooling System Air Cooled < 65000 Btu/6
18800 12.40 10.00 12.40
PASSES
Cooling Capacity
Heating System Electric Furnace
16380 1.00 1.00
PASSES
Air Handling Air Handler (Supply) -
10 0.80 0.80
PASSES
System -Supply Constant Volume
PASSES
.`,
.•
,_
Plant Compliance
Installed Design
Min Design Min
Comp
Description No Size Elf
Eff IPLV IPLV Cateeory
liance
None
10/7/03 EnergyGauge FlaCom FLCCSB v1.21
Project: ATLTRMFG03
Title: MANUFACTURING BUILDING
Type: Office (Business)
Location: FORT PIERCE, ST LUCIE COUNTY, FL (661100)
(WEA File: DAYTONAB
Water Heater Compliance
Design
Min Design Max Comp
Desc Type Cateeor.v Eff
Eff Loss Loss liance
Water Heater 1 Storage Water Heater - <=120 [gal] & <= 12 1.00
0.88 0.12
Electric [kW]
n- PASSES '
TRMFG03
FACTURING BUILDING
(Business)
RT PIERCE,
Piping System Compliance
FDomestic
Pipe Dia Is Operat Ins Cond Ins
Req Ins Comp
[inches] Runout Temp [F] Btu-in/h Thick [in]
Thick [in] liancc
r.SF.F
d Service Hat Water Systems
0.75 False 120.00 0.28 1.35
1.33 PASSES
PASSES,':. <'
i0n103 EnergyGaugeFlaCom FLCCSB v1.21
M: ATLTRMFG03
MANUFACTURING BUILDING
Office (Business)
ion: FORT PIERCE,
Other Required Compliance
IlCategory Section Requirement (write N/A in box if not applicable) Check II
filtration
406.1
Infiltration Criteria have been met
istem
407.1
HVAC Load sizing has been performed
entilation
409.1
Ventilation criteria have been met
DS
410.1
Duct sizing and Design have been performed
& B
410.1
Testing and Balancing will be performed
lectrical
413.1
Metering criteria have been met .
lotors
414.1
Motor efficiency criteria have been met
Ighting
415.1
Lighting criteria have been met
& M
102.1
operation/maintenance manual will be provided to owner
not/Ceil
404.1
R-19 for Roof Deck with supply plenums beneath it
10/7/03 EnergyGauge FlaCom FLCCSB vl.21 7
ProiectName: ATLTRMFG03
Address: x
Ft. Pierce
State: Florida
Proiect Data
ZIM 34954
Owner: ATLANTIC TRUSS COMPANY
Building Type: Office (Business)
No.of Storevs: 2
Azimuth: 0.00
Building Classification: New Finished building
GrossArea: 1013
Zone Report
Acronym
Description Type
Load Profile
1 Zol
Break Room CONDITIONED
Uses Building Load Profile
❑
2 Z02
Office -Metz. CONDITIONED
Uses Building Load Profile
❑
Space Report
Space Description
Acronym Depth Width
Height Multi Area
Volume
ft ft
ft plier SF
CF
Spaces in Zone:
Zol
I Break Room
Zol 17.3 20.7
11.0 1.00 358
3943 ❑
Food Service - Fast Food/Cafeteria
Spaces in Zone:
Z02
1 Offices
Z02-011c 20.5 20.7
8.0 1.00 424
3390 ❑
Offices (Partitions<3.5 ft below ceiling) Open plan offices 900 ft or larger with
partitions higher
2 Storage
Z02-Sto 11.2 20.7
8.0 1.00 231
1847 ❑
Storage & Warehouse - Inactive Storage
10/7/03 EnergyGauge FlaCom FLCCSB v1.21 1
Lighting Report
No Type
Power Control Type
No.of
W
Ctrl pts
Lights in Zone: Zol
Lights in Space Zol
1 9
480 ManualOn/Off
2
Lights in Zone: Z02
Lights in Space Z02-Ofc
1 4
660 ManualOn/Off
2
Lights in Space Z02-Sto
1 4
240 ManualOn/Off
2
Wall Report
Wall Description
Width H(Effec)
Multi
Area Azimut
ft ft
plier
sf h
Walls in Zone: Zol
1 CBS+RO. Shaded
20.67 11.00
1.00
227.37
0
cont.
2 CBS+RO,Shaded
17.34 11.00
1.00
190.74
0
cont..
4 CBS+RO
20.67 11.00
1.00
227.37
180
coat...
5 CBS+RO
17.34 11.00
1.00
190.74
270
cont..
Walls in Zone: Z02
1 6" Stud+R19
20.67 8.50
1.00
175.70
0
cont..
2 6" Stud+r19, Shaded 31.67 8.50
1.00
269.20
0
coot..
3 CBS+R3, Shaded
20.67 8.50
1.00
175.70
0
cont.
4 CBS+R3
31.67 8.50
1.00
269.20
270
conk..
Wall Report Cont.........
Wall Description
Type Cond.
Dens.
Sp Heat
R
Btu/hr. Sf. F Ib/cf
Btu/lb. F h.sf.F/Btu
Walls in Zone: Zol
1 CBS+RO. Sha
Construct 1063
0.43 140.0
0.20
2.3
❑
2 CBS+RO,Shad
Construct 1063
0.43 140.0
0.20
2.3
❑
4 CBS+RO
Construct 1063
0.43 140.0
0.20
2.3
❑
5 CBS+RO
Construct 1063
0.43 140.0
0.20
2.3
❑
Walls in Zone: Z02
1 6" Stud+R19
0.5 Ply/35/8" Mtl std@24"oc/R19/0.5" Gyp
0.04 8.6
0.20
22.5
❑
2 6" Stud+rl9, S
0.5 Ply/35/8" Mtl std@24"oc/RI9/0.5" Gyp
0.04 8.6
0.20
22.5
❑
3 CBS+R3, Sha
Stucco/8"CMU/R3insul/GypBd
0.20 60.5
0.20
4.9
❑
4 CBS+R3
Stucco/8"CMU/R3insul/GypBd
0.20 60.5
0.20
4.9
❑
10/7/03 EnergyGauge FlaCom FLCCSB v1.21
Window Report
Zone Wall Window Description
Type
UCen
(Btu/hr Sf F)
cons...
Window Report Cont....
Zone Wall Wind Shaded SC
Vis.Tr W H (Effec Multi
Area
Total Area
(Y/N)
(ft) (ft) plier
(Sf)
(SO
CHI
Door Report
Door Description
Shaded
Width H (Effee) Multi
Area
?
It
ft plier
A
Doors in Zone: Zol
Doors in Wall: Zol-Ea
1.00 6070 Door
False
6.00
7.00 1.00
42.00
Doors in Zone: Z02
Doors in Wall: Zo2-Ea
1.00 3070 Doors
False
3.00
7.00 1.00
21.00
Door Report Coat....
Wall Type
Cond.
Dens.
Sp Heat
R
Btu/hr. St. f lb/cf
Btu/Ib. F h.sf.F/Btu
Doors in Zone: Zol
Doors in Wall: Zol-Ea
1.22 0.00
0.00
0.82 E
1.00 Fiberglass/Mineral wool core
Doors in Zone: Z02
Doors in Wall: Zo2-Ea
1.00 Fiberglass/Mineral wool core
1.22 0.00
0.00
0.82 [
10/7/03 EnergyGauge FlaCom FLCCSB v1.21
Roof Report
Roof Description
Width H(Effec) Multi
ft ft plier
Area Tilt
sf deg
Roofs in Zone: Zol
1 Mtl/3"MBI/R19/Acous
Roofs in Zone: Z02
1 MtVM I/Rl9/Acous
17.34 20.67 1.00
20.67 31.67 1.00
359.42 0.00 Cont
654.62 0.00 cont
Roof Report Cont........
Roof Description Type
11.00
Cond. Dens. Sp Heat R
Btu/hr. Sf. f Ib/cf Btu/Ib. F h.sEFBtu
Roofs in Zone: ' Zol
Mtl/3"MBURI MtlRoof/3"MBI/Attic/R19/Acous 0.04
Roofs in Zone: Z02
1.00 MtUMBI/R19/ MtiRoof/3"MBI/Attic/R19/Acous 0.04
10.75 0.17 28.03 ❑
10.75 0.17 28.03 ❑
Skylight Report
Zone Roof Sky Description
Type
UCen Shading
Btu/hr Sf Coeff
cont..
Skylight Report Cont.....
Zone Roof Skyli Vis.Tra
ght
W H (Effec Multiplier
(ftl (ftl
Area Total Area CHK
(SO (St)
FloorReport
Floor Description
Width H (Effec) Multi Area
ft ft plier sf
Floors in Zone: Zol
1.00 Slab on Grade
Floors in Zone: Z02
1.00 Elevated Conc. Slab
17.34
20.67
20.67 1.00 358.42
31.67 1.00 654.62
10/7/03 EnergyGauge FlaCom FLCCSB vl.21
Plant Report
Equipment
Category Incl. Size
InsLN Eff. IPLV
CHK
El
Water Heater Report
W-Heater Description
Cap Cap.Uni I/P Rt. III? Rt.Uni Efri
EffUni Loss LossUni
CHK
I Storage Water Heater - Electric
40.00 1 4.54 1 1.00
1 0.12 1
❑
Ext-Lighting Report
Description
Categories.
Area Wattag
(Sf) (M
CHK
El
10/7/03 EnergyGauge FlaCom FLCCSB v1.21