Loading...
HomeMy WebLinkAboutEnergy Code1HEATING & COOLING LOAD SUMMARY SHEET u u Project Name: 1✓lAwu-r,,4r-rumj.) GuiLPw 3 Project Owner: AT-(,APT-tc. 777-655 (:::;pkA.PAdJy Project Address: Sizing Method Used: ASHRAE Handbook of Fundamentals, 1997, Chapter26 Compliance Criteria: Florida Building Code, 2001 Edition Section 407.1.ABCD.1 Sizing, Exception #1 Heating/Cooling Zone Aµu /c11—i AKLI./ cd-2• Conditioned Floor Area (sq.ft.) 3 rj g ('64 Outdoor Dry Bulb (°FDB) 91,0 0 Outdoor Wet Bulb ( °FWB) 7 $, O 7'8.0 Indoor Dry Bulb ( °FDB) 757. b Indoor Relative Humidity SO CFO S070 Difference Water Vapor (Grains/lb.) S qe Cooling Sensible Load (BTUH) I-L) lOp '7, 84c3 Cooling Latent Load (BTUH) �j7 6 q O Cooling Total Load (BTUH) with required outdoor air 17/ 740 911 1 O Heating Total Load (BTUH) with required outdoor air HVAC systems and equipment sizes thus comply with Florida Building Code, 2001 Edition, Section 407.1.ABCD.1.1: D\k q. BM — :I- ENERGY`EFFICIENCY CODE�FOR-BUILDIlVGCONSTRUCTION T 4 'Flonda Departineiitiif Comuium Affairs ty f EnergyGauge FlaCom v121FORM 400A 2001 jµRTholeBuildmg P,erformauce Method'for Couuner'cial Buildings — . � m- Jurisdiction: FORT PIERCE, ST LUCIE COUNTY, FL (661100) Short Desc: ATLTRMFG03 Project: MANUFACTURING BUILDING Owner: ATLANTIC TRUSS COMPANY Address: Ft. Pierce x City: Ft. Pierce State: Florida PermitNo: Pending Zip: 34954 Storeys: 2 Type: Office (Business) GrossArea: 1013 Class: New Finished building Net Area: 1013 .11 Compliance Summary 11 Component Design Criteria Result Gross Energy Use 97.41 100.00 PASSES Other Envelope Requirements - A PASSES LIGHTING CONTROLS EXTERNAL LIGHTING HVAC SYSTEM PLANT WATER HEATING SYSTEMS PIPING SYSTEMS Met all required compliance from Check List? 10/7/03 PASSES PASSES PASSES PASSES PASSES PASSES Yes/No/NA EnergyGauge MaCom FLCCSB v1.21 \ 1 COMPLIANCE CERTIFICATION: I hereby certify that the plans and specifications Review of the plans and specifications covered by this covered by this calculation are in compliance calculation indicates compliance with the Florida Energy with the Florida Energy Efficiency C de Efficiency Code. Before construction is completed, this building will be inspected for compliance in accordance with Section 553.908, Florida Statutes. -PREPARED BY: Y DATE: BUILDING OFFICIAL: DATE: I hereby certify (') that the system design is in compliance with the Florida Energy Efficiency Codi SYSTEM DESIGNER ARCHITECT: MECHANICAL: ELECTRICAL: LIGHTING: REGISTRATION/STATE (7 Signature is required where Florida Law requires design to be performed by registered design professionals. Typed names and registration numbers may be used where all relevant information is contained on signed/sealed plans. 10/7/03 EnergyGauge FtaCom FLCCSB v1.21 2 0 Project: ATLTRMFG03 Title: MANUFACTURING BUILDING Type: Office (Business) Location: FORT PIERCE, ST LUCIE COUNTY, FL (661100) Whole Building IDesign JReference Total 97.41 100.00 msc '�10-1 4 -,� I 11 1 4.04')Own"& IRACE.00 4.15 5. .01. SPACE HEAT 4.84, 6.74 �'�-- J VENT FANS 9- 2.59- -1 .4 & Penalties (if any): Modified Points: = 97.41 10/7/03 EnergyGaugeFlaCom FLCC!SB vl.21 k., r Project: ATLTRMFG03 Title: MANUFACTURING BUILDING Type: Office (Business) Location: FORT PIERCE, ST LUCIE COUNTY, FL (661100) (WEA File: DAYTONAB Other Envelope Requirements Item Zone Description Design Limit Meet Req. Zo 1 Zo 1 Exterior Roof - Max Uo Limit 0.03 0.09 Yes Z02 Z02 Exterior Roof - Max Uo Limit 0.03 0.09 Yes Meets Other Enveloue Reauirements External Category :t: ATLTRMFG03 MANUFACTURING BUILDING Office (Business) ion: FORT PIERCE, ST LUCIE COUNTY, FL (661100) File: DAYTONAB Lighting Controls G Allowance Area or ELPA CLP (W/Unit) Length (W) (W) Area No. of Design Min Compli- Acronym Ash- rae ID Description (sq.ft) Tasks CP CP ance Zol 6 Food Service - Fast Food/Cafeteria 358 1 2 2 PASSES1 Z02-Ofc 32 Offices (Partitions<3.5 ft below 424 1 2 2 PAS$ES ceiling) Open plan offices 900 ft or larger with partitions higher Z02-Sto 44 Storage & Warehouse -Inactive 231 1 2 2 EAS$E§ Storage 10/7/03 EnergyGauge FlaCom FLCCSB vl.21 4 Project: ATLTRMFG03 Title: MANUFACTURING BUILDING Type: Office (Business) Location: FORT PIERCE, ST LUCIE COUNTY, FL (661100) (WEA File: DAYTONAB System Report Compliance Zol. AIfU/CU-1 Unitary Systems Capa- Design Eff Design IPLV Comp - Component Category city Eff Criteria IPLV Criteria ]lance Cooling System Air Cooled < 65000 Btu/h 18800 12.40 10.00 12.40 PASSES Cooling Capacity Heating System Electric Furnace 16380 1.00 1.00 PASSES Air Handling Air Handler (Supply) - 10 0.80 0.80 PASSES System -Supply Constant Volume Z02 AHU/CU-2' Unitary Systems Capa- Design Eft Design IPLV Comp - Component Category city Elf Criteria IPLV Criteria fiance Cooling System Air Cooled < 65000 Btu/6 18800 12.40 10.00 12.40 PASSES Cooling Capacity Heating System Electric Furnace 16380 1.00 1.00 PASSES Air Handling Air Handler (Supply) - 10 0.80 0.80 PASSES System -Supply Constant Volume PASSES .`, .• ,_ Plant Compliance Installed Design Min Design Min Comp Description No Size Elf Eff IPLV IPLV Cateeory liance None 10/7/03 EnergyGauge FlaCom FLCCSB v1.21 Project: ATLTRMFG03 Title: MANUFACTURING BUILDING Type: Office (Business) Location: FORT PIERCE, ST LUCIE COUNTY, FL (661100) (WEA File: DAYTONAB Water Heater Compliance Design Min Design Max Comp Desc Type Cateeor.v Eff Eff Loss Loss liance Water Heater 1 Storage Water Heater - <=120 [gal] & <= 12 1.00 0.88 0.12 Electric [kW] n- PASSES ' TRMFG03 FACTURING BUILDING (Business) RT PIERCE, Piping System Compliance FDomestic Pipe Dia Is Operat Ins Cond Ins Req Ins Comp [inches] Runout Temp [F] Btu-in/h Thick [in] Thick [in] liancc r.SF.F d Service Hat Water Systems 0.75 False 120.00 0.28 1.35 1.33 PASSES PASSES,':. <' i0n103 EnergyGaugeFlaCom FLCCSB v1.21 M: ATLTRMFG03 MANUFACTURING BUILDING Office (Business) ion: FORT PIERCE, Other Required Compliance IlCategory Section Requirement (write N/A in box if not applicable) Check II filtration 406.1 Infiltration Criteria have been met istem 407.1 HVAC Load sizing has been performed entilation 409.1 Ventilation criteria have been met DS 410.1 Duct sizing and Design have been performed & B 410.1 Testing and Balancing will be performed lectrical 413.1 Metering criteria have been met . lotors 414.1 Motor efficiency criteria have been met Ighting 415.1 Lighting criteria have been met & M 102.1 operation/maintenance manual will be provided to owner not/Ceil 404.1 R-19 for Roof Deck with supply plenums beneath it 10/7/03 EnergyGauge FlaCom FLCCSB vl.21 7 ProiectName: ATLTRMFG03 Address: x Ft. Pierce State: Florida Proiect Data ZIM 34954 Owner: ATLANTIC TRUSS COMPANY Building Type: Office (Business) No.of Storevs: 2 Azimuth: 0.00 Building Classification: New Finished building GrossArea: 1013 Zone Report Acronym Description Type Load Profile 1 Zol Break Room CONDITIONED Uses Building Load Profile ❑ 2 Z02 Office -Metz. CONDITIONED Uses Building Load Profile ❑ Space Report Space Description Acronym Depth Width Height Multi Area Volume ft ft ft plier SF CF Spaces in Zone: Zol I Break Room Zol 17.3 20.7 11.0 1.00 358 3943 ❑ Food Service - Fast Food/Cafeteria Spaces in Zone: Z02 1 Offices Z02-011c 20.5 20.7 8.0 1.00 424 3390 ❑ Offices (Partitions<3.5 ft below ceiling) Open plan offices 900 ft or larger with partitions higher 2 Storage Z02-Sto 11.2 20.7 8.0 1.00 231 1847 ❑ Storage & Warehouse - Inactive Storage 10/7/03 EnergyGauge FlaCom FLCCSB v1.21 1 Lighting Report No Type Power Control Type No.of W Ctrl pts Lights in Zone: Zol Lights in Space Zol 1 9 480 ManualOn/Off 2 Lights in Zone: Z02 Lights in Space Z02-Ofc 1 4 660 ManualOn/Off 2 Lights in Space Z02-Sto 1 4 240 ManualOn/Off 2 Wall Report Wall Description Width H(Effec) Multi Area Azimut ft ft plier sf h Walls in Zone: Zol 1 CBS+RO. Shaded 20.67 11.00 1.00 227.37 0 cont. 2 CBS+RO,Shaded 17.34 11.00 1.00 190.74 0 cont.. 4 CBS+RO 20.67 11.00 1.00 227.37 180 coat... 5 CBS+RO 17.34 11.00 1.00 190.74 270 cont.. Walls in Zone: Z02 1 6" Stud+R19 20.67 8.50 1.00 175.70 0 cont.. 2 6" Stud+r19, Shaded 31.67 8.50 1.00 269.20 0 coot.. 3 CBS+R3, Shaded 20.67 8.50 1.00 175.70 0 cont. 4 CBS+R3 31.67 8.50 1.00 269.20 270 conk.. Wall Report Cont......... Wall Description Type Cond. Dens. Sp Heat R Btu/hr. Sf. F Ib/cf Btu/lb. F h.sf.F/Btu Walls in Zone: Zol 1 CBS+RO. Sha Construct 1063 0.43 140.0 0.20 2.3 ❑ 2 CBS+RO,Shad Construct 1063 0.43 140.0 0.20 2.3 ❑ 4 CBS+RO Construct 1063 0.43 140.0 0.20 2.3 ❑ 5 CBS+RO Construct 1063 0.43 140.0 0.20 2.3 ❑ Walls in Zone: Z02 1 6" Stud+R19 0.5 Ply/35/8" Mtl std@24"oc/R19/0.5" Gyp 0.04 8.6 0.20 22.5 ❑ 2 6" Stud+rl9, S 0.5 Ply/35/8" Mtl std@24"oc/RI9/0.5" Gyp 0.04 8.6 0.20 22.5 ❑ 3 CBS+R3, Sha Stucco/8"CMU/R3insul/GypBd 0.20 60.5 0.20 4.9 ❑ 4 CBS+R3 Stucco/8"CMU/R3insul/GypBd 0.20 60.5 0.20 4.9 ❑ 10/7/03 EnergyGauge FlaCom FLCCSB v1.21 Window Report Zone Wall Window Description Type UCen (Btu/hr Sf F) cons... Window Report Cont.... Zone Wall Wind Shaded SC Vis.Tr W H (Effec Multi Area Total Area (Y/N) (ft) (ft) plier (Sf) (SO CHI Door Report Door Description Shaded Width H (Effee) Multi Area ? It ft plier A Doors in Zone: Zol Doors in Wall: Zol-Ea 1.00 6070 Door False 6.00 7.00 1.00 42.00 Doors in Zone: Z02 Doors in Wall: Zo2-Ea 1.00 3070 Doors False 3.00 7.00 1.00 21.00 Door Report Coat.... Wall Type Cond. Dens. Sp Heat R Btu/hr. St. f lb/cf Btu/Ib. F h.sf.F/Btu Doors in Zone: Zol Doors in Wall: Zol-Ea 1.22 0.00 0.00 0.82 E 1.00 Fiberglass/Mineral wool core Doors in Zone: Z02 Doors in Wall: Zo2-Ea 1.00 Fiberglass/Mineral wool core 1.22 0.00 0.00 0.82 [ 10/7/03 EnergyGauge FlaCom FLCCSB v1.21 Roof Report Roof Description Width H(Effec) Multi ft ft plier Area Tilt sf deg Roofs in Zone: Zol 1 Mtl/3"MBI/R19/Acous Roofs in Zone: Z02 1 MtVM I/Rl9/Acous 17.34 20.67 1.00 20.67 31.67 1.00 359.42 0.00 Cont 654.62 0.00 cont Roof Report Cont........ Roof Description Type 11.00 Cond. Dens. Sp Heat R Btu/hr. Sf. f Ib/cf Btu/Ib. F h.sEFBtu Roofs in Zone: ' Zol Mtl/3"MBURI MtlRoof/3"MBI/Attic/R19/Acous 0.04 Roofs in Zone: Z02 1.00 MtUMBI/R19/ MtiRoof/3"MBI/Attic/R19/Acous 0.04 10.75 0.17 28.03 ❑ 10.75 0.17 28.03 ❑ Skylight Report Zone Roof Sky Description Type UCen Shading Btu/hr Sf Coeff cont.. Skylight Report Cont..... Zone Roof Skyli Vis.Tra ght W H (Effec Multiplier (ftl (ftl Area Total Area CHK (SO (St) FloorReport Floor Description Width H (Effec) Multi Area ft ft plier sf Floors in Zone: Zol 1.00 Slab on Grade Floors in Zone: Z02 1.00 Elevated Conc. Slab 17.34 20.67 20.67 1.00 358.42 31.67 1.00 654.62 10/7/03 EnergyGauge FlaCom FLCCSB vl.21 Plant Report Equipment Category Incl. Size InsLN Eff. IPLV CHK El Water Heater Report W-Heater Description Cap Cap.Uni I/P Rt. III? Rt.Uni Efri EffUni Loss LossUni CHK I Storage Water Heater - Electric 40.00 1 4.54 1 1.00 1 0.12 1 ❑ Ext-Lighting Report Description Categories. Area Wattag (Sf) (M CHK El 10/7/03 EnergyGauge FlaCom FLCCSB v1.21