HomeMy WebLinkAboutEnergy CodeFORM R405-2017
FLORIDA ENERGY EFFICIENCY CODE FOR BUILDING CONSTRUCTION
Florida Department of Business and Professional Regulation - Residential Performance Method
Project Name:
HAAG ADDITION
Street:
6789 S. INDIAN RIVER DRIVE
City, State, Zip:
FT. PIERCE, FL,
Owner:
--Design Location:
FL, Fort Pierce
1. New construction or existing
2. Single family or multiple family
3. Number of units, if multiple family
4. Number of Bedrooms
5. Is this a worst case?
6. Conditioned floor area above grade (ft2)
Conditioned floor area below grade (ft2)
7. Windows(112.6 sqft.) Description
a. U-Factor:. Sgl, U=1.05
SHGC: SHGC=0.30
b. U-Factor: Sgl, U=1.05
SHGC: SHGC=0.35
c. U-Factor: N/A
SHGC:
d. U-Factor: N/A
SHGC:
Area Weighted Average Overhang Depth:
Area Weighted Average SHGC:
8. Floor Types (1089.0 sqft.)
a. Slab -On -Grade Edge Insulation
b. N/A
c. N/A
Glass/Floor Area: 0.103
Builder Name:
Permit Office:
Permit Number:
Jurisdiction:
County: St. Lucie (Florida Climate Zone 2 )
New (From Plans)
9. Wall Types(1876.0 sqft.)
Insulation
Area
Single-family
a. Concrete Block - Ext Insul, Exterior
R=4.1
1456.00 ft2
b. Frame - Wood, Adjacent
R=11.0
420.00 ft2
1
c. N/A
R=
ft2
0
d. N/A
R=
ft2
No
10. Ceiling Types (1089.0 sqft.)
Insulation
Area
a. Under Attic (Vented)
R=30.0
1089.00 ft2
1089
b. N/A
R=
ft2
0
c. N/A
R=
ft2
11. Ducts
R ft2
Area
a. Sup: Attic, Ret: Attic, AH: STORAGE
6 125
64.58 ft2
48.00 ft2
12. Cooling systems
kBtu/hr
Efficiency
a. Central Unit
24.0 SEER:16.00
ft2
13. Heating systems
kBtu/hr
Efficiency
ft2
a. Electric Strip Heat
17.0
COP:1.00
2.000 ft.
0.321 14. Hot water systems
Insulation Area a. Propane Tankless
R=0.0 1089.00 ft2 b. Conservation features
R= ft2 None
R= ft2 15. Credits
Total Proposed Modified Loads: 42.09
Total Baseline Loads: 44.75
I hereby certify that the plans and specifications covered by
this calculation are in compliance with the Florida Energy
Code.
PREPA D BY:
DATE: -
I hereby certify that this building, as designed, is in compliance
with the Florida Energy Code.
OWNER/AGENT:
DATE:
Review of the plans and
specifications covered by this
calculation indicates compliance
with the Florida Energy Code.
Before construction is completed
this building will be inspected for
compliance with Section 553.908
Florida Statutes.
BUILDING OFFICIAL:
DATE:
Cap: 1 gallons
EF: 0.600
PASS
Pstat
- Compliance requires certification by the air handler unit manufacturer that the air handler enclosure qualifies as
certified factory -sealed in accordance with R403.3.2.1.
= Compliance requires an Air Barrier and Insulation Inspection Checklist in accordance with R402.4.1.1 and this project requires an
envelope leakage test report with envelope leakage no greater than 5.00 ACH50 (R402.4.1.2).
9/23/2019 11:41 AM EnergyGaugeO USA 6.0.02 (Rev. 1) - FlaRes2017 FBC 6th Edition (2017) Compliant Software Page 1 of 4
FORM R405-2017 INPUT SUMMARY CHECKLIST REPORT
PROJECT
Title: HAAG ADDITION
Bedrooms: 0
Address Type: Street Address
Building Type: User
Conditioned Area: 1089
Lot #
Owner Name:
Total Stories: 1
Block/Subdivision:
# of Units: 1
Worst Case: No
PlatBook:
Builder Name:
Rotate Angle: 0
Street: 6789 S. INDIAN RIVER
Permit Office:
Cross Ventilation: No
County: St. Lucie
Jurisdiction:
Whole House Fan: No
City, State, Zip: FT. PIERCE,
Family Type: Single-family
FL,
New/Existing: New (From Plans)
Comment:
CLIMATE
/
Design Temp
Int Design Temp Heating Design Daily Temp
�/ Design Location
TMY Site 97.5 % 2.5 %
Winter
Summer Degree Days Moisture
Range
FL, Fort Pierce FL VERO_BEACH_MUNI 39 90
70
75 299 62
Low
BLOCKS
Number Name
Area Volume
1 Entire House
1089 15246
SPACES
Number Name
Area Volume Kitchen Occupants
Bedrooms InfilID Finished Cooled
Heated
1 GAME ROOM/WET
540 7560 No 0
1 Yes Yes
Yes
2 BATH
60 840 No 0
1 Yes Yes
Yes
3 STORAGE
240 3360 No 0
1 Yes Yes
Yes
4 EXERCISE ROOM
249 3486 No 2
1 Yes Yes
Yes
FLOORS
# Floor Type
Space Perimeter Perimeter R-Value
Area
Joist R-Value Tile Wood
Carpet
1 Slab -On -Grade Edge Insulatio
GAME ROOM/W 64 ft 0
540 ft2
---- 0 1
0
2 Slab -On -Grade Edge Insulatio
BATH 6 ft 0
60 ft2
---- 0 1
0
3 Slab -On -Grade Edge Insulatio STORAGE 16 ft 0
240 ft2
---- 0 1
0
4SIab-On-Grade Edge Insulatio EXERCISE ROO 18 ft 0
249 ft2
---- 0 1
0
ROOF
/
Roof Gable Roof
Rad
Solar SA Emitt Emitt Deck Pitch
V # Type
Materials Area Area Color
Barr
Absor. Tested Tested Insul.
(deg)
1 Hip
Metal 1180 ft2 0 ft2 Medium
N
0.6 No 0.9 No
0 22.6
ATTIC
V
# Type
Ventilation Vent Ratio (1 in)
Area
RBS IRCC
1 Full attic
Vented 150 1089 ft2
N N
9/23/2019 11:41 AM EnergyGauge® USA 6.0.02 (Rev. 1) - FlaRes2017 FBC 6th Edition (2017) Compliant Software Page 2 of 4
• FORM R405-2017 INPUT SUMMARY CHECKLIST REPORT
CEILING
#
Ceiling Type Space R-Value
Ins Type
Area
Framing Frac Truss Type
1
Under Attic (Vented) GAME ROOM/W 30
Blown
540 ft2
0.1
Wood
2
Under Attic (Vented) BATH 30
Blown
60 ft2
0.1
Wood
3
Under Attic (Vented) STORAGE 30
Blown
240 ft2
0.1
Wood
4
Under Attic (Vented) EXERCISE ROO 30
Blown
249 ft2
0.1
Wood
WALLS
Adjacent Space Cavity Width
P
Height
Sheathing Framing
_Ahqoro
Solar
Below
1
N
Exterior Concrete Block - Ext Ins(AAME ROO 4.1 14
0 14 0
196.0 ft2
0
0
0.6
0
2
S
Exterior Concrete Block - Ext Ins(RAME ROO 4.1 20
0 14 0
280.0 ft2
0
0
0.6
0
3
W
Exterior Concrete Block - Ext InsGAME ROO 4.1 30
0 14 0
420.0 ft2
0
0
0.6
0
4
N
Exterior Concrete Block - Ext Insul BATH 4.1 6
0 14 0
84.0 ft2
0
0
0.6
0
_ 5
S
Exterior Concrete Block - Ext InstSTORAGE 4.1 16
0 14 0
224.0 ft2
0
0
0.6
0
6
N
Exterior Concrete Block - Ext InEXERCISE R 4.1 16
0 14 0
224.0 ft2
0
0
0.6
0
7
E
Exterior Concrete Block - Ext InfiXERCISE R 4.1 1
0 14 0
14.0 ft2
0
0
0.6
0
8
W
Exterior Concrete Block - Ext In!UXERCISE R 4.1 1
0 14 0
14.0 ft2
0
0
0.6
0
9
N
Garage Frame - Wood GAME ROO 11 30
14
420.0 ft2
0
0.23
0.6
0
WINDOWS
Orientation shown is the entered, Proposed orientation.
/
Wall
Overhang
V
#
Ornt ID Frame Panes NFRC U-Factor SHGC
Imp Area
Depth
Separation
Int Shade Screening
1
W 3 Metal Low-E Single Yes 1.05 0.35
N 48.0 ft2
2 ft 0 in
2 ft 0 in
None
None
2
W 3 Metal Low-E Single Yes 1.05 0.3
N 14.6 ft2
2 ft 0 in
2 ft 0 in
None
None
3
W 3 Metal Low-E Single Yes 1.05 0.3
N 15.0 ft2
2 ft 0 in
2 ft 0 in
None
None
4
N 4 Metal Low-E Single Yes 1.05 0.3
N 8.0 ft2
2 ft 0 in
2 ft 0 in
None
None
5
S 5 Metal Low-E Single Yes 1.05 0.3
N 12.0 ft2
2 ft 0 in
2 ft 0 in
None
None
6
N 6 Metal Low-E Single Yes 1.05 0.3
N 15.0 ft2
2 ft 0 in
2 ft 0 in
None
None
GARAGE
#
Floor Area Ceiling Area Exposed Wall Perimeter Avg. Wall Height
Exposed Wall Insulation
1
1140 ft2 1140 ft2 30 ft
14 ft
11
INFILTRATION
#
Scope
Method SLA CFM 50 ELA
EgLA
ACH
ACH 50
1 Wholehouse Proposed ACH(50) .000445 1270.5 69.75
131.17
.1928
5
9/23/2019 11:41 AM EnergyGauge® USA 6.0.02 (Rev. 1) - FlaRes2017 FBC 6th Edition (2017) Compliant Software Page 3 of 4
• FORM R405-2017 INPUT SUMMARY CHECKLIST REPORT
HEATING SYSTEM
# System Type
Subtype
Efficiency
Capacity
Block
Ducts
1 Electric Strip Heat/
None
COPA
17 kBtu/hr
1
sys#1
COOLING SYSTEM
# System Type
Subtype
Efficiency
Capacity
Air Flow SHR Block
Ducts
1 Central Unit/
Split
SEER: 16
24 kBtu/hr
cfm 0.7 1
sys#1
HOT WATER SYSTEM
# System Type SubType
Location
EF Cap
Use
SetPnt
Conservation
1 Propane Tankless
Exterior
0.6 1 gal 60.9 gal
120 deg
None
SOLAR HOT WATER SYSTEM
FSEC
Collector Storage
Cert # Company Name
System Model # Collector
Model
# Area Volume
FEF
None None
ft2
DUCTS
/ — Supply —
-- Return ----
Air
CFM 25
CFM25
HVAC #
V # Location R-Value Area
Location
Area Leakage Type
Handler
TOT
OUT QN RLF
Heat Cool
1 Attic 6 125 ft2
Attic
65 ft2 Default Leakage
STORAGE
(Default)
(Default)
1 1
TEMPERATURES
Programable Thermostat: Y
Ceiling Fans:
Venting Jan Feb Mar
Apr
Jun
Jul
May
Nov
Dec
LXJ Jun LXJ Jul
LXJ Aug
LXJ Sep
Oct L�l Nov
Dec
Thermostat Schedule: HERS 2006 Reference
Hours
Schedule Type 1
2 3
4 5 6
7
8
9 10 11
12
Cooling (WD) AM 78
78 78
78 78 78
78
78
80 80 80
80
PM 80
80 78
78 78 78
78
78
78 78 78
78
Cooling (WEH) AM 78
78 78
78 78 78
78
78
78 78 78
78
PM 78
78 78
78 78 78
78
78
78 78 78
78
Heating (WD) AM 66
66 66
66 66 68
68
68
68 68 68
68
PM 68
68 68
68 68 68
68
68
68 68 66
66
Heating (WEH) AM 66
66 66
66 66 68
68
68
68 68 68
68
PM 68
68 68
68 68 68
68
68
68 68 66
66
MASS
Mass Type
Area
Thickness Furniture Fraction
Space
Default(8 Ibs/sq.ft.
0 ft2
Oft
0.3
GAME ROOM/WET
Default(8 Ibs/sq.ft.
ft2
ft
0.3
BATH
Default(8 Ibs/sq.ft.
ft2
ft
0.3
STORAGE
Default(8 Ibs/s .ft.
ft2
ft
0.3
EXERCISE ROOM
9/23/2019 11:41 AM EnergyGauge® USA 6.0.02 (Rev. 1) - FlaRes2017 FBC 6th Edition (2017) Compliant Software Page 4 of 4
2017 - AIR BARRIER AND INSULATION INSPECTION COMPONENT CRITERIA
TABLE 402.4.1.1
AIR BARRIER AND INSULATION INSPECTION COMPONENT CRITERIA
Project Name: HAAG ADDITION Builder Name:
Street: 6789 S. INDIAN RIVER DRIVE Permit Office:
City, State, Zip: FT. PIERCE, FL, Permit Number:
x
Owner: Jurisdiction:
w
Design Location: FL, Fort Pierce
U
COMPONENT
AIR BARRIER CRITERIA
INSULATION INSTALLATION CRITERIA
General
A continuous air barrier shall be installed in the building envelope.
Air -permeable insulation shall
requirements
The exterior thermal envelope contains a continuous air barrier.
not be used as a sealing material.
Breaks or joints in the air barrier shall be sealed.
Ceiling/attic
The air barrier in any dropped ceiling/soffit shall be aligned with
The insulation in any dropped ceiling/soffit
the insulation and any gaps in the air barrier shall be sealed.
shall be aligned with the air barrier.
Access openings, drop down stairs or knee wall doors to
unconditioned attic spaces shall be sealed.
Walls
The junction of the foundation and sill plate shall be sealed.
Cavities within corners and headers of frame walls
The junction of the top plate and the top of exterior walls shall be
shall be insulated by completely filling the cavity
sealed.
with a material having a thermal resistance of R-3
Knee walls shall be sealed.
per inch minimum.
Exterior thermal envelope insulation for framed
walls shall be installed in substantial contact and
continuous alignment with the air barrier.
Windows, skylights
The space between window/doorjambs and framing, and
and doors
skylights and framing shall be sealed.
Rim joists
Rim joists shall include the air barrier.
Rim joists shall be insulated.
Floors
The air barrier shall be installed at any exposed edge of
Floor framing cavity insulation shall be installed to
(including
insulation.
maintain permanent contact with the underside of
above -garage
subfloor decking, or floor framing cavity insulation
and cantilevered
shall be permitted to be in contact with the top side
floors)
of sheathing, or continuous insulation installed on
the underside of floor framing and extends from the
bottom to the top of all perimeter floor framing
members.
Crawl space walls
Exposed earth in unvented crawl spaces shall be covered with
Where provided instead of floor insulation, insulation
a Class I vapor retarder with overlapping joints taped.
shall be permanently attached to the crawlspace
Shafts, penetrations
Duct shafts, utility penetrations, and flue shafts opening to
exterior or unconditioned space shall be sealed.
Batts in narrow cavities shall be cut to fit, or narrow
Narrow cavities
cavities shall be filled by insulation that on
installation readily conforms to the available cavity
spaces.
Garage separation
Air sealing shall be provided between the garage and conditioned spac
Bs.
Recessed lighting
Recessed light fixtures installed in the building thermal envelope
Recessed light fixtures installed in the building
shall be sealed to the drywall.
thermal envelope shall be air tight and IC rated.
Plumbing and wiring
Batt insulation shall be cut neatly to fit around wiring
and plumbing in exterior walls, or insulation that on
installation readily conforms to available space shall
extend behind p s 12ing and wiring-
Shower/tub
The air barrier installed at exterior walls adjacent to showers and
Exterior walls adjacent to showers and tubs shall
on exterior wall
tubs shall separate them from the showers and tubs.
be insulated.
Electrical/phone box or
The air barrier shall be installed behind electrical or communication
exterior walls
boxes or air -sealed boxes shall be installed.
HVAC register boots
HVAC register boots that penetrate building thermal envelope shall
be sealed to the sub -floor or drywall.
Concealed
When required to be sealed, concealed fire sprinklers shall only be
sprinklers
sealed in a manner that is recommended by the manufacturer.
Caulking or other adhesive sealants shall not be used to fill voids
a In adds lnn i— eriinn
nF Inn ...w lln ,.1...11 L...:� ____-�____ ._ �.� .�_ • • .. _ .__
—• •••---..._.., .....1............ — .vy r. v...� a„o„ UG 111 O\.\.VIUGIIt:C Mill 111C FJIUVIblUF15 Of Ilil.-41JU.
9/23/2019 11:41 AM EnergyGauge® USA 6.0.02 (Rev. 1) - FlaRes2017 FBC 6th Edition (2017) Compliant Software Page 1 of 1
2017 EPL DISPLAY CARD
ENERGY PERFORMANCE LEVEL (EPL) DISPLAY CARD
ESTIMATED ENERGY PERFORMANCE INDEX* = 94
• The lower the Energy
Performance Index,
the more efficient the home.
1. New home or, addition
1. New (From Plans)
12. Ducts, location & insulation level
a) Supply ducts R
6.0
2. Single-family or multiple -family
2. Single-family
b) Return ducts R
6.0
c) AHU location STORAGE
3. No. of units (if multiple -family)
3. 1
4. Number of bedrooms
4. 0
13. Cooling system: Capacity
24.0
a) Split system SEER
16.0
5. Is this a worst case? (yes/no)
5. No
b) Single package SEER
c) Ground/water source SEER/COP
6. Conditioned floor area (sq. ft.)
6. 1089
d) Room unit/PTAC EER
e) Other
7. Windows, type and area
a) U-factor:(weighted average)
7a. 1.050
b) Solar Heat Gain Coefficient (SHGC)
7b. 0.321
14. Heating system: Capacity
17.0
c) Area
7c. 112.6
a) Split system heat pump HSPF
b) Single package heat pump HSPF
8. Skylights
c) Electric resistance COP
1.0
a) U-factor:(weighted average)
8a. NA
d) Gas furnace, natural gas AFUE
b) Solar Heat Gain Coefficient (SHGC)
8b. NA
e) Gas furnace, LPG AFUE
f) Other
9. Floor type, insulation level:
a) Slab -on -grade (R-value)
9a. 0.0
b) Wood, raised (R-value)
9b.
15. Water heating system
c) Concrete, raised (R-value)
9c.
a) Electric resistance EF
b) Gas fired, natural gas EF
10. Wall type and insulation:
c) Gas fired, LPG EF
0.60
A. Exterior:
d) Solar system with tank EF
1. Wood frame (Insulation R-value)
10A1.
e) Dedicated heat pump with tank EF
2. Masonry (Insulation R-value)
10A2. 4.1
f) Heat recovery unit HeatRec%
B. Adjacent:
g) Other
1. Wood frame (Insulation R-value)
10131. 11.0
2. Masonry (Insulation R-value)
1062.
16. HVAC credits claimed (Performance Method)
11. Ceiling type and insulation level
a) Ceiling fans
a) Under attic
1 la. 30.0
b) Cross ventilation
No
b) Single assembly
11 b.
c) Whole house fan
No
c) Knee walls/skylight walls
11 c.
d) Multizone cooling credit
d) Radiant barrier installed
11d. No
e) Multizone heating credit
f) Programmable thermostat
Yes
*Label required by Section R303.1.3 of the Florida Building Code, Energy Conservation, if not DEFAULT.
I certify that this home has complied with the Florida Building Code, Energy Conservation, through the above energy
saving features which will be installed (or exceeded) in this home before final inspection. Otherwise, a new EPL
display card will be completed based on installed code compliant features.
Builder Signatu
Date:
Address of New Home: 6789 S. INDIAN RIVER DRIVE City/FL Zip: FT. PIERCE. FL
9/23/2019 11:41:05 AM EnergyGauge® USA 6.0.03 (Rev. 1) - FlaRes2017 FBC 6th Edition (2017) Compliant Software Page 1 of 1