Loading...
HomeMy WebLinkAboutTermite Treatment • Planning &Development Services ` - -Building&Code Regulation Division ® 2300 Virginia Ave Ti • Fort Pierce,FL 34982 772-462-2172 Fax 772-462 6"3 CERTIFICATE OF TERMITE TREATMENT CONSTRUCTION SOIL TREATMENT PERMIT #:�9t D5-3 q JOB ADDRESS- T-71 Sum!S,elL cr BUILDER/CONTRACTOR: P5-Ly Frvg-ems i-CS PEST CONTROL CONTRACTOR: PEST CONTROL LICENSE #: :IMQI(-1 qh We,the undersigned, hereby certify that we have pretreated the above described construction for subterranean termites in accordance with the standards of the National Pest Control Association. Square feet if area treated: Chemicals used: Vow Percentage of solution: 5 Total gallons used: 75 43,4 L. Date of Treatment: / Time of Treatment: Footing Slab 1't Treatment ist Treatment Re-Treat Re-Treat Driveway Pools L 1st Treatment 1�l Treatment Re-Treat IRe-Treat Other Perimeter for Final Inspection 1s*Treatment Re-Treat / Signature of Exterminator Date Note.• There must-be a completed form for each required ftw1ment or re-treatment and this form mustbe on the job site to be picked up by the inspector at lime of each inspection or the scheduled inspection will fail and a re-inspection fee charged. FBC104.2.6 Certificate of Protective Treatment for prevention of termites A weather resistant jobsite posting board shall be provided to receive duplicate Treatment Certificates as each required protedive trea6nent is completed, providing a copy for the person the permit is issued to and another copy for the building permit fries. The Treatment Certificate shall provide the product used,identity of the applicator, time and date of the t7eamen4 site location, area treated, chemical used,percent concentration and number ofgallons used,to establish a verifiable record of protective treatment. If the soll chemical bamer method for ter mite prevention is used, fina/exterior treatment shall be completed prior to final building approval. St Lucie County requires for the final inspection for CO,a Permanent Sticker to be placed on the electrical panel box cover, listing all the treatments and dates of applications. Revised 7/24/2014