HomeMy WebLinkAbout30 day power release li 04-13-'20 13:09 FROM- 7728787658 T-782 P0002/0004 F7912
I ,
I •
Ploni:n , t eWIO)p nerpfi rrr+ �s
2 11''ulu-g}IltFa Aire. NVistein
m
a So' �'Pl ll'C�'' FL i gga n m w Q
!" . 3
G N N C
7�'Z-46Z;�-i65 FaX 772 461-6443 o
R dest for 30-Day'�'+��Iporaty-Po rerftl�ease
\ (�� 1-01
Date; Pemit'NOmben
Project Address: �� \Cc, � t
THE UNDERSIGNED Nl=RESY REQUEST RELEASE OF ELECTRICAL POWER TO THE ABOVE DESCMED
PROPERTY, FOR A PERIOD NOT TO EXCEED T14IRTY,,(30) DAYS,FOR THE PURPOSE OF TESTING SYSTEMS
AND EQUIPmEw IN PREPARATION FORA PINAL.INSPEOION. IN CONSIDERATION OF APPROVAL OF THE
REQU WE-H Y ACIQ*0WLW..Gk AND AGE AS FOLLOWS:
. This bmiprary power release is.rlpAuesbad for sae above su ed pure only,and t e e v ili'be no
occupancy of any type,oth' than that pamiitted by cohst a on during this time period.
2. As M(Mess by our s gnatuves,we hereby agree to abide by ell terms and conditions of this agreement,
including Building Division Policy,which is incorporAml herein by reference.
3. .All conditions:and requiremenfis Fisted in the attached document entitled"Requirements for 30 Day
Power'for TeOng"hi ve been fulfilled•end the premise is reedy for compliance inspection.
4. All requests for on,extension beyond 30 days-must be:made in wftlg tD the Building Official stating
the reason far the request. Pojiver may be removed from the site and/or a Stop Work Order issued if
the Final Inspection has riot been approved Within 30'days. A fee of$100.00 will be regUred to lift
the Stop Wnrk Order.
WE HEREBY RELEASE-AND AGREE.TO HOLD HARMLE55,S .LUPE COUNTY,AND THEIR EMPLOYEES FROM
ALL LIABTL.ITIES AND.CLAIMS OF ANY TYPE OF NATURE WHICH MAY ARISE NOW OR IN 7HE FUTURE.OUT
OF Th T$TRAWACTION,INCLUDING ANY DAMAGE''1Iik.HIC4'-. iAY 8E INtORRED DUE TO THE
IDISCONN&MON OF MECMCAL PoWEK IN THE EVE'OF VIOLATION OF THIS AGREEM 9T,
OWNER•SIG'N DA-r r
CONTIMCM 901RE DATE'
ELECTRICAL CONMCTOR SIGNATURE DATE'
o •
I