HomeMy WebLinkAboutAddendum to Project Documentss_ Oct 17 02 12:01a Florida Architects, Inc. ADDENDUM TO PROJECT DOCUMENTS ALPI CENTER REMODELING Fort fierce, norida 'fhe Agricultural and Labor Program, Inc. f'I.A Project No. 4050 October 16, 2002 ADDENDUM NO.ONF: (1) 407-370=5550 p.2 The Contract Documents including Project Manual and Construction Drawings lorthcabove projectarc amended in the tbllowingparticulam, All provisions ofthe original drawings andlorspecificationsshall remain in force, except asspecihcallymoditicdorchanged herein orbyotherAddenda issued bythe Architect. This Addendum is hereby made part ofthc Contract Documents, and Contractors are required to coordinateall of these Addendum items throughout all other inter-rela"clementsofthc Contract Documents. whether Spec ificallyshown by Addendum ornot. Addendum itcrmsupercederegWremcntsofpreviouslyissued documents and inter-relatedcicmentsofthe project, unless noted otherwise, 12eceipf of this Addendum shall be acknowle ftd on the Bid fort Plcase insert -this Addendum into, the Contract Documents. PROJECT MANUAL. - Item No, 1: Specification Section 0020, Special Conditions: RfiVISE Article 26.1) as follows: CTRTIFICA'i'E UI; STRUCTIM12 LOCATIONS• The General Contractor sl:ail have a s[atc registered surveyor certify, in writing, with seal affixed, that the location ofa11 new structurc(s) is in compliance with the Contract Doeununts. " t N . 2: Specification Section 08710, Door Hardware: ADi) this section in its entiretyas attached_ MAW1NG5: Tier Nu. 1: Cover Sheet.lndcx of Drawings_ ADD"11903 Plumbing Plan/Schedules/RiserDiagam/Notes"to index. item No. 2: Drawing Sheet A50p Room kipish Schedule/Toilct Plans and FLevHtions: ADD Room Finish Notes, Reicrtoattached Florida Architect.-, R %s"xl 1" Supplemental Dx-awingsheet AD- 1, dated 10/18/02. Item No. 3: ADD attached 24"x t6"drawing sheet "A903 Plumbing Plan/Schodules/Riser D;agram/N911, ,"Jdaf'od,, 10/ I 8/02, END Or ADDENDUM 7� . Pugs I " Oct 17 02 12:�-)la' i Florida Rrchitects, Inc. 407-370-5550 p.3 ROMFINISH NOTES: I. INTERIOR PAINT: SHERWIN WILLIAMS 'QUAD -CRAFT" 5EI"N-GLO55 EGGSHELL ODORLESS ACRYLIC LATEX. COLORS A5 SELECTED BY OWNER, PRIMERS: CONCRETE AND MA50NRY PRIMERS SHALL BE LOXON BLOCK SURFACER -PLAT LATEX. GYPSUM WALL PRIMER: PREPRITE 200 WHITE LATEX. FERROUS METAL PRIMER: KEM KROMIX UNVERSAL METAL ALKYD -TYPE PRIMER. EXTERIOR PAINT: SHERWIN WILLIAMS EXTERIOR ALL WEATHER ACRYLIC PAINT. COLOR TO MATGH EXISTING. NOTE: PROVIDE WATER -BASED EPDXY PAINT AT TOILET ROOM WALLS. NOTE: CLEAN ALL EXISTING WALLS WITH TR150DIUM PHOSPHATE AS REQUIRED BEFORE PRInNG AND PAINTING. 2. BA515 OF DE51GN FOR CERAMIC TILE SHALL BE A$ FOLLOWS: DALTLE MOSAIC GLAZED TILE WITH C3) GOLOR PATTERN TO 4'-0' A.F.F WITH EPDXY GROUT (GOLOR TO MATCH) AND UNGLAZED TILE WITH EPDXY GETOUT AT FLOOR. (COLOR TO MATGH). 3. BANS OF DESIGN FOR CARPET 5l'tALL BE A5 FOLLOWS: G+A FLOORGOVERINGS 'SAILAWAY' 79.24 OZ. WITH RUBBER BACKING. PROVIDE ADHESIVE AS RECOMMENDED BY MANUFACTURER. CCOLOR AND STYLE A5 SELECTED BY OWNER). 4"BA515 OF DESIGN FOR VINYL COMP05MON TILE SMALL BE AS FOLLOWS: ARMSTRONG STANDARD EXCELON. CCOLOR AS SELECTED BY OWNER). PROVIDE ADHESIVE AS RECOMMENDED BY MANUFACTURER. 5. VINYL BASE: ROPPE TVBFIG7 1/6' BASE. CCOLOR AS SELECTED BY OWNER). G. LAY -IN CEILING TILE: ARMSTRONG 'HUMIGUARD' TEGULAR CEILING TILES C51ZE AS SHOWN ON PLANS) WITH ALUMINUM 5U5PEN51ON GRID. "0=11 lWACMK =PAL AW neat PF40U a roc. fl!'1b m m— 40M sw wum fL,A u ROOM FM NWO 6h WA PAID W-I&M I AD-1 w..w#Amm IWAM No acgE OW 80!Ml PAW Gii= SURE W ORL Dq R"M SM 4V/W0-MW FAX 40'7/M-aOM t • REQUEST FOR INFORMATION F L O R IL D RESPONSE LicensOMAA002730 1217 WawateAvenue Ft. Pierce, Florida 34950 Date: 1. 0/ 16/02 7T2.466.0053 (v) 772.466.3002 (17 Project: ALPI Center Project RFI #: Subcontractor: Bill Bryant & Assoc. Subcontractor RFI #: 1 Description: On Sheet Number A201, Key Note 46 under Demolition Key Notes "Completely remove concrete slab as indicated. Cap floor drain below grade." Please clarify location. Response: Selective concrete demolition will be done as needed for plumbing installation throughout project, quantities and location to be determined by Contractor to insure code compliance. Signed: —K 1�, Flori a Archects, In 101517/2002 08:17 561-770-1460 BRYANT & ASSQC:IATF: .L PAGE 01 Bill Bryant & Associates, Inc. REQUEST FOR INFORMATION 1550 Old Dixie Highway Vero Beech, FL 32960.3655 772- 567-0045 - 800-752-7143 - Fax# 772- 770-1460 f�. To: Mr. Ken Singletary, AIA 1217 Delaware Avenue Fort Pierce, Florida 34950 \r M Project Name: ALPI Center (772)468-3002 FAX R.F.I. Number: 1 Date: 10/16/02 Attn: Mr. Ken Singletary Sub: ALP) Center Specification Section: From: Robert H. Paugh Reference Drawings: Reference Details: [ ] Information is not shown on the contract documents [ ] Confirmation of a conversation j X ] Conflicting information needs to be clarified [ ] Schedule Problems Contract requirements need clarification [ j Coordination Problems [ ) Contract documents conflict with local building codes [ UL Designs Descriotion: On Sneet NumDerA201, Key Note # 6 under Demolition Key Notes "Completely remove concrete slab as indicated, Cap floor drain below grade." Please clarify location. Thank you, Robert [ ] Work is proceeding as per your instruction [ ] Work has stopped, pending Wbrrn9tton [ ] Work has stopped, dire tb relays by other trades [ ) A change order must be issued prior to commencement of added work [ ] Information is required by Reply; Answered By. Date: STATE CERTIFIED GENERAL CONTRACTORS # CGCO17811 • REQUEST FOR INFORMATION AT RESPONSE F L 0 R I D A LicenseBAA002730 1217 Delaware Avenue Ft. Pierce, Florida 34950 Date: 10/17/02 772.468.0053 (v) 772.468.3002 (f) Project: ALPI Center Project RFI #: 2 Subcontractor: Bill Bryant & Assoc. Subcontractor RFI #: 2 Description: (1) Please provide plumbing fixture schedule. (2) Are all new walls to receive 3" sound attenuation blankets? (3) On Furniture Layout on page A202, Rm. 101 is to receive a 6" projection screen. Is this to be surface mounted or recessed? Response: (1) American Standard for lavatories, water closets and urinals and Elkay or Moen for faucets basis for design. (2) 3" sound batts to be used in common walls between classrooms. (3) Projection screen to be provided by Owner. It will be surface mounted. Signed: Florida Arclatects, I . 10N7/2@02 17:14 561-770-1460 x I �i Dill Bryant & Associates, Inc. 1560 Old Dixie Highway Vero Beach, FL 32WO-3655 772- 667-MS - SM752-7143 - Fox# 772- 770-146D To: Mr. Ken Singletary, AIA 1217 f3Ntewsrs Avenue Fort Pierce, Florida 34950 (772)468-3002 FAX HRVANT & ASSOGIATI� 4- PAGE 01 REQUEST FOR INFORMATION Project Name: A,LPI Center R.F.I. Number. 2 Date: October 17, 2002 Atfrt: Mr. Ken Singletary Sub: ALPI Center Specification Section: From: Robert H. Paugh Reference Drawings: Reference Details: [ j Infarmmtbn Is not shown on the Contract documertta t I Confirmation of a conversation [ X) CORMcft information needs, to be clarified [ Schedule Problem [ j Contract requirements need clarification I ] Coordination Problems [ ) Contract documenla conflict with local building codes I I UL Designs Desallotion: • Please pnvide plumbing fbdurs schedule. • Are all new wells to receive W sound attenuation blankets? • On Furniture Layout on page A202, Rm.101 is to receive a 8' projection screen. is this to be surtdce mounted or recessed? Thank you, Robert (j Work IS proceeding as per your instruction I ) Work has stopped, pending information Work has stopped, due to delays by other bade• E ] A ChOnge order must be issued prior to commencement of added work [ 1 Information is required by„Bffl. Reply.. Answered By: Date. STATE CERTW1160 GENERAL CONTRACTORS d CGCO17011 • REQUEST FOR INFORMATION FLOAV R. l D A RESPONSE Llcensa#AA002730 1217 Delaware Avenue PI. Name, orida Date: 10/17/02 772.458.0053 (v) 772,468.3002 (0 Project: ALPI Center Project RFI #: 3 Subcontractor: Bill Bryant & Assoc. Subcontractor RFI #: 3 Description: (1) Would it be possible to receive as-builts for the mechanicals? (2) Is the water heating system to be reused or should it be figured to be replaced? (3) Do we know where the sewer lateral is located on the property? Response- (1) Plumbing riser available. Mechanical and Electrical not available. (2) Reuse existing. (3) West side of building shown on as -built drawings. Y Signed: Flori a Archffecis, Inc. 6,117/2002 17:4. 34 ` 561-770-1460 BPYANT & ASSOCIATFS t. PAGE 01 , BPI Bryant & Associates, Inc. 1550 old Dixie Hlgttwey Vero Beach, FL V980-3655 772- 557.0045 - 800-752-7143 - Fax# 772- 770-1460 To: Mr. Ken Singletary, AIA 1217 Doloware Avenue Fort Pierce, Florida 34950 (772)468-3002 FAX Alin: Mr. Ken Singletary Sub: ALP! Center From: Robert H. Paugh j Information is not shown on the contract documents [ X ] Conflicting information needs to be clarified [ l Contract requirements need cleffrAtion [ j Contract documents cenfltgt with local building oodes REQUEST FOR INFORMATION Project Name: ALPI Center R.F.I. Number: 3 Date: October 17, 2002 Specibcation Section: Reference Drawings; Reference Details: [ j confirmation of a conversation [ J Schedule Problems [ j Coordination Problems [ j UL Designs Degrriction: Would it be possible to roceive as-builts for the mechenir ats? Is the water heating system to be reused or should it be figured to be replaced? • Do we know where the sewer lateral Is located on the property? Thank you, Robert [ 1 Work is proceeding as per your instruction I i work has stopped, pending ink mation Work has stopped, due to delays by other trades A change order must be issued prior to commencement of added work. [ j Information is required by ASAP Reply: Answered By: I Date: STATE CERTIFIED GENERAL CONTRACTORS # C00017611 ALPI Center Remodel HARDWARE SCHEDULE 10-21-02 ITEM NO: I SGL DRS too, loos, 100C EACH TO HAVE: 3.0 EA HAG BUTTS BBI 199 4.5 X 4.5 NRP 630 1.0 EA VON EXIT DEVICE 98L X 994L SNB 626 1.0 EA SCH CYLINDER AS REQUIRED 1.0 EA LCN' CLOSER 4041 .EDA TB 689: S CUSH @ 1 OOB + 1 OOC 1.0 EA PEM THRESHOLD 2005AT LAR SSMS-ES 25 719 1.0 SET PEM WEATHERSTRIP 2891 AS LAR 719 .1.0 EA ROC KICKPLATE 8" X 2" LDW .050 ME 630 1.0 EA ROC FLOOR STOP 482 626 @ 100 NOTE: Mount Closer Ann Shoe & Exit Strike to 2891AS. Spacial Template. 1.0 EA. PEM RA.TK DRIP 346C LAR 719 @ I OOB + I OOC P.R DRS 117 EACH TO HAVE 6.0 EA HAG 2.0 EA IVE 1.0 EA SCH 2.0 EA GIM 1.0 EA PEM 1.0 SET PEM 1.0 EA PEM SOL DR - 1 OOA EACH TO HAV>r ITEM N0: 2 BUTTS SURF. BOLT LOCKS.ET 01-3 HOLDER THRESHOLD WEATHERSTRIP RAIN DRIP 3.0 EA HAG BUTTS 1.0 'EA SCH PRIVACY 1.0 EA LCN CLOSER 1.0 EA PEM THRESHOLLO 1.0 EA ROC WALL STOP 3.0 EA IVE SILENCERS 1.0 EA ROC KICKPLATE 11914.5 X 4.5 NRP 630 SB360 US2 DSOPD RHO 626 900.H 630 2005AT LAR SSMS-ES 25 719 S88D LAR 346C LAR 719 ITEM. NO: 3 BB 1279 4.S X 4.5 652 D40S RNO 626 4041 REG TB 689 200SAT LAR SSMS•FS 25 719 409 630 64 8" X 2" LDW .050 WE 630 ALPI Center Remodel HA.RDWARF SCHEDULE 10-21-02 SGL DR. 101 EACH TO HAVE: 3.0 EA HAG BUTTS 1.0 EA SCH LOCKSET 1.0 EA LCN CLOSER LO EA ROC WALL STOP 3.0 EA IVE SILENCERS 1,0 EA ROC KICKPLATE SOL DRS 102, 103, 104, 105 EACH TO HAVE: 3,0 EA HAG BUTTS 1.0 EA SCH LOCKSET 1.0 EA .LCN CLOSER 1.0 EA ROC WALL STOP 3.0 EA IVE SILENCERS 1.0 EA ROC KTCKPLATE SGL DR 103 A EACH TO HAVE: ITEM NO: 4 BB 1279 4.5 X 4.5 652 D70PD RHO 626 4041 REG TB 689 409 630 64 8" X 2" .LAW .050 B3E 630 ITEM NO: 5 BB12794.5 X 4.5 652 D50PO RI -TO 626 4041 REG TB 689 409 630 64 8" X'2" LDW .050 B3E 630 ITEM NO. 6 3.0 EA HAG BUTTS 1279 4.5 X 4.5 652 1.0 EA SCH LOCKSET D53PD RHO 626 1.0 EA ROC WALL STOP 409 630 3.0 EA IVE SILENCERS 64 SGL DRS 106,107, 108.109,1.10,115, 116 EACH TO HAVE: 3.0 EA HAG BUTTS BB 1279 4.5 X 4.5 652 1.0 EA SCH LOCKSET D70PD RHO 626 1.0 EA LCN CLOSER 4041 EDA TB 689 (REG @ 110 & 115) 1.0 EA ROC WALL STOP 409 630 3.0 EA IVE SILENCERS 64 1.0 EA ROC KICKPLATE 8" X 2" LDW .050 B3E 630 K 46 - ALPI Center Remodel HARDWARE SCHEDULE r 10-21-02 ITEM NO: 8 DUTCH DRS 106A, 107A, 108A, 110A, 111, 112, 113, 114 EACH TO HAVE: 4.0 BB 1279 4.5 X 4.5 652 D10S RHO 626 630-4 626 409 630 64 - EA HAG BUTTS 1.0 EA SCH LATCHSET 1.0 EA ROC DUTCH BOLT 1.0 EA ROC WALL STOP 3.0 EA NE SILENCERS 3 t I N MUM ++ �tAN I 52 dK 3iY1dQiYM c6 to � `c In in r 0) r ro r rU Izp a) � r- ro Al1011aae i CIO N N 3 _ - P) -1. N W t11111fH 7- T_ Z. z T_ Y_ T_ z 7_ z z 7 7 y T 7 7. 7 i� 7. 7 r 7 7 7 7_ D z T_ z ME7_ U t• t z a- tl ._ u >_ u �_ c3 f- �.) t� tJ, J J _ v J �- r ui H V, ') CL CL kn %n to %n ,n U) JI .n .n n .n Ln v) .n .n ..0 In 0 d oq M � Cn£ T m Cm' m 2 T i r) `+ rl ¢ rl 2 cm C C,i - .L o 0 S Guam rn�Iww�.�Ra-Znamnmrinic.,,mmInac�CI, �*.��+( •� �4 to ;0 m tr t0 .Ct ;0 R3 a rt to A iR K1 tf5 eh ICt .Ct A> rt rt\ In to m , v La L9 W l9 19 O is t9 c9 .D t.9 c0 ip CO c) is lv. 10 i0 0 t9 19 I 1 K X K X K K K ti x -C x -C v v v %r K K !! x X x to L7 C)Ct)f�) 1 ( . QUO t)C) I rJ t r3 t C300 C)C)t)i�CS • r l :7 i 7 �') i') i' 3 i7 in i i Z r) r) > r) r) •, r> i In -c q i 1 n 917 n e) ti SO =t Ia C� U N !7 P) 4 trt C,v l9 r R1 K 7.1 q' (:: 2 C N r•7 7u,1➢ OU V OO�OUCir�UctiC,C3U CJ � O ww ADDENDUM TO PROJECT DOCUMENTS ALPI CENTER REMODELING Fort Pierce, Florida Architects, Inc. The Agricultural and Labor Program, Inc. FLA Project No. 4050 October 28, 2002 ADDENDUM NO. TWO_(2) [*A FLORID OREMM LlcenseNAA002730 The Contract Documents including Project Manual and Construction Drawings- for the above project are amended in the following particulars. All provisions of the original drawings and/or specifications shall remain in force, except as specifically modified or changed herein or by other Addenda issued by the Architect. This Addendum is hereby made part of the Contract Documents, and Contractors are required to coordinate all of these Addendum items throughout all other inter -related elements of the Contract Documents, whether specifically shown by Addendum or not. Addendum items supercede requirements of previously issued documents and inter -related elements of the project, unless noted otherwise. Receipt of this Addendum shall be acknowledged on the Bid Form. Please insert this Addendum into the Contract Documents. REQUESTS FOR INFORMATION: Item No. 1: Add project RFI #4 submitted by Paul Jacquin & Sons, Inc. RFI #1. Item No. 2: Add project RFI #5 submitted by Bill Bryant & Assoc., Inc. RFI #4. Item No. 3: Add project RFI #6 submitted by Paul Jacquin & Sons, Inc. RFI #2. Item No. 4: Add project RFI #7 submitted by Bill Bryant & Assoc, Inc. RFI #5. END OF ADDENDUM Page 1 of 1 v\ .off° -�p'S1 [*A REQUEST FOR INFORMATION F L 0 R I D A RESPONSE Llcense#AA002730 1217 Delaware Avenue Ft. Pierce, Florida 34950 Date: 10/23/02 772.408.0053 (v) 772.488.3002 (Q Project: ALPI Center Project RFI #: 4 Subcontractor: Paul Jac uin & Sons Inc. Subcontractor RFI #: I DESCRIPTION: (1) What is the symbol "T" as shown on Dwg. A902? (2) Is furniture, appliances by GC? What manufacturer? (3) Is projection screen installed by GC? (4) Is markerboard by GC? Existing reused? No details/manufacturer given. (5) Are shelves by GC? No details/manufacturer given. (6) Are windows impact resistant? Are shutters required? (7) What manufacturer is standard for wood doors? (8) Hardware requirements are called to be in Spec Section 08710. Not issued. (9) Alternate #1 appears to be signage. Are details available? (10) HVAC drawing appears to show three (3) AHU's. Only two (2) are scheduled. Does the classroom #115 have a third unit? (11) A/C #2 condenser model not given. (12) Is detail 3/A500 typical for all classroom sink units? Units are not labeled. (13) Do existing toilets get new fixtures? Accessories? Mirrors? (14) Addendum One calls for aluminum grid. Is this correct? Is galvanized sufficient? (15) Addendum One calls for ceramic tile to 4 ft aff. Drawing shows 4" base in toilets and 7' walls in showers. Schedule shows ceramic tile base to 4' aff. Are the toilet rooms a 4' wainscoat? The showers 7' walls? (16) Detail 7/S201 shows 20 ga. studs with 18 ga. blocking. Is this correct? Will this meet wind load? (17) Will existing trusses take the imposed loading of the new trusses? Including uplift? (18) Can permit and impact fees be treated as an allowance? (19) Is Builders Risk Insurance by Owner? RESPONSE: (1) T = TV receptacle. (2) Furniture/appliances by Owner. (3) By Owner. (4) By Owner (5) By Owner (6) Yes. No. (7) Exterior shall comply with ANSI/SDI-100 grade 111, extra heavy duty, Model 4, minimum 16 ga., hot dipped galvanized steel faces. Frames to be Republic Builders Products or equal. Interior approved manufacturers: (a) Algoma Hardwoods, Inc., (b) Graham Manufacturing Corp., (c) V.T. Industries, Inc., (d) Weyerhauser Company. (8) Included in Addendum #1. (9) Forthcoming. (10) Yes — Reuse existing. (11) Reuse existing. (12) Detail 3, typical all sink base locations. Provide for refrigerator as indicated in Detail 2/A202. (13) Yes. (14) Aluminum grid. (15) Yes. (16) Yes. (17) Yes. (18) Established at Pre -bid = $4,500.00. (19) Builders Risk Ins. to be by GC. Refer to Article 11.3.1, Section 00800 of Project Manual. Signed: Florid Architec , In ZJIN & S cQ o 9 6[Nf�� G`ai<tittAiUN ;�'r,' � �-°. :: ,:_:. �.::. COMMERCIAL 9 l� q �'NSt��f()1Vi��irilA��1�5;;. `�j� f �` - > >'?,: ' : •i ;i;;'' ',`;-s:::;?;.:€ i ::,.:. / INDUSTRIAL EitS='` C RESIDENTIAL ESTABLISHED 1940 ALPI CENTER QUESTIONS 10/22/02 What is symbol "T" as shown on dwg A902? Is furniture, appliances by GC ? What manufacturer? Is projection screen installed by GC? Is Marker Board by GC? Existing reused? No details / manufacturer given. Are TV shelves by GC? No details / manufacturer given. Are windows Impact resistant? Are shutters required? What manufacturer is standard for wood doors? Hardware requirements are called to be in spec section 08710. Not Issued. Alternate # 1 appears to be Signage? Are details available? HVAC Drawing appears to show three AHU, Only two are scheduled. Does the classroom 115 have a Third unit? A/C #2, condenser model not given? Is detail 3/A500 typical for all classroom sink unit? Units are not labeled. Do existing toilets get new fixtures? Accessories? Mirrors? Addendum One calls for Aluminum Grid. Is this correct? Is galvanized sufficient? Addendum One calls for ceramic tile to 4 ft AFF. Dwg shows 4 in. base in toilets & 7 ft walls in showers. Schedule shows CT base to 4 ft AFF. Are the toilet rooms a 4 ft wainscot? The Showers 7 ft walls? 7/S201 shows 20 ga. studs with 18 ga. blocking is this correct? Will this meet wind load? Will existing trusses take the imposed loading of the new trusses? Including uplift? Permit and impact fees, Can these be an allowance? Builders Risk Insurance, is this by owner? 1 — � f [0 AV F L 0 R I D A LIcon se#AA002730 1217 Delaware Avenue Ft. Pierce, Florida 34950 772.468.0063 (vJ 772.468.3002 If) REQUEST FOR INFORMATION RESPONSE Date: 10/24/02 Project: ALPI Center Project RFI #: 5 Subcontractor: Bill Bryant & Assoc. Subcontractor RFI #: 4 DESCRIPTION: (1) Should doors be provided with welded or knock down frames? (2) Door 106A on revised door schedule is indicated as hardware group 2. On door hardware specification, door 100A is shown as using hardware Item No. 3. Please indicate which group is correct. RESPONSE: (1) Doors should be provided with welded frames. (2) Door hardware Item No. 3 is correct. Signed: Florida Archite s, Inc. 0/23/2002 16:3`5 , 561-770-1460 BRYANT & ASSOCIATES. PAGE .01 Bill Bryant & Associates, Inc, REQUEST FOR INFORMATION 1650 Old Dixie Highway Vero Beach, FL 32960.3855 772- 567.0046 - WO-762 7143 - Fax* 772- 770.1460 To: Mr, Ken Singletary, AIA 1217 Delaware Avenue Fort Pierce, Florida 34960 (772)468-=2 FAX Attn: Mr. Ken Singletary Sub: ALM Center From: Robert H. PaWh I I Information Is not shown on the contract documents j X I Conflicting information needs to be ctiarifled j 1 Contract naquirements need clarikation ( j Contract documents conflict with I" building codes Project Name: ALPI Center R.F.I. Number 4 Date: October 23, 2002 Specification Section: Reference Drawings: Reference Details: 13 Confirmiation of a conversation [ I Schedule Problems I I Coordination Problems I 1 UL Pesigns • Should doors be provided with welded or b rmk down trsmas? • Door 100A on revised door schedule is indic8bed as hardware group 2. On door hardware s XKftatbon, door 100A is shown as using hardware Urn No. 3_ Please indicate which group Is correct? Thank you, Robert [ j Work is proceeding as per your instruction [ 1 Work has stopped, pending Whrmation [ I Work hart stoled, due to delays by outer trades [ 1 A dWv order must be issued poor to commencernent of added work [ l Information is requked by_&56p Reply; Answered By: Date: STATE CERTIFIED GENERAL CONTRACTORS V CGCO17811 Oc% 24 02 04: Q;2p,., L PRUL JACQUIN 8, SONS, INC 5614662ODS . p.2 IN & so ` . GENERAti CONitiACTORS �t A ` COMMERCIAL CO_NSTRUCrIQN MANAGERS INDUSTRIAL �� .DF,BTGN-BUILDERS RESTnEIVT]AL ESTABLISHED 1940 AL.PI CENTER REQUEST FOR INFORMATION 10/25/02 1. At the pre -bid it was indicated that the main electrical disconnect is to be replaced. Plans call for it to remain. Which is this correct? .2. Should a soap dispenser and towel dispenser be furnished for each sink? They are only shown in the toilets. 3. Are there preferred model numbers or manufacturer for the toilet accessories? 4. Section 08800 Para 3.5.2 refers to a one and two year warranty. Plumbing drawing calls for one-year warranty. Please confirm warranty term? 5. Demolition plan does not call for removal of roof over existing walkway. Doesn't this have to be removed for truss installation_ ? 6. Drawings do not show roof ridge vent. Existing roof ridge is vented. Will new roof ridge require continuous vent at new ridgeline? 7. I cam fend "Child Craft" for the cubbies in Sweets or The Blue Book is there another name they deal under? $, Drawing A100, Life Safety, what are the solid black squares? Fire extinguishers? P.O. Box 4343.7349 Commercial Circle - Ft. Pierce, FL 34948-4343 - Phone (561) 465-2475 - Fax (561) 466-2806 • REQUEST FOR INFORMATION F L O R I AT RESPONSE license8AA002730 1217 Delaware Avenue Ft. Pierce, Florlda 34050 Date: 10/28/02 772.468.0053 (v) 772.458.3002 (f) Project: ALPI Center Project RFI #: 7 Subcontractor: Bill Bryant & Assoc. Subcontractor RFI #: 5 DESCRIPTION: (1) We know that we have to provide fire extinguishers and cabinets. Please specify quantity and locations. (2) Wall covering is specified for certain rooms. Is this on an allowance? (3) What is the pattern for tile? Do we price 1, 2, 3 or 4 tile? (4) What is design for VCT installation? RESPONSE: (1) Total quantity is eight (8). Locate adjacent to exterior exit doors: a., One (1) Lobby 100 b. One (1) Corridor 10013 C. Two (2) Corridor 100E d. One (1) Room 108 e. One (1) Room 109 f. One (1) Room 111 g. One (1) Room 115 (2) Wall finishes are to be painted. (3) To be decided by Owner. Maximum six (6) color tile. (4) To be decided by Owner. Signed. -o . Florida Architects, Inc. , I , M!25/2802 15: R ��5;1-770-1460 13RYA14T & ASSOCIATE,: „e r PAGE 01 Bill Bryant & Associates, Inc. 1550 Old Dixie Highway Vero Beach, FL 32960-3655 772- 667-0046 - B00-752-7143 - Fax# 772.770-1460 To: Mr, Ken Singletary, AIA 1217 Delaware Avenue Fort Pierce, Florida 34950 (772)460.3002 FAX Attn: Mr. Ken Singletary Sub: ALPI Center From: Robert H. Paugh [ ] Information is not shown on the contract documents [ X } Conflicting information needs to be clarified [ } Contract requirements need clarification [ } Contract documents conflict with local building codes REQUEST FOR INFORMATION Project Name: ALPI Center R.F.I, Number; 6 Date- October 25, 2002 Specification Section: Reference Drawings: Reference Details: [ [ Confirmation of a conversation [ j Schedule Problems [ )Coordination Problems } UL Designs t>esoriotion: 1 • We knave that we have to provide fire extinguishers and cabinets. Please specify quantity and locations 2, • Wall covering is specified for certain rooms, is this on an allowance? 3 • What is the pattern for tile? Do I price 1, 2,3, 4 Tile? *� • What is design for VCT Installation? Thank you, Robert ( ] Worts is proceeding as per your instruction [ ] Work has stopped. pending information C ) Work has stopped, due to delays by other trades [) A change order must be issued prior to commencement of added work j ] Information is required by ASAP_ _ Reply, Answered By: Data: STATE CERTIFIED GENERAL CONTRACTORS