ADDENDUM TO PROJECT DOCUMENTS
ALPI CENTER REMODELING
Fort fierce, norida
'fhe Agricultural and Labor Program, Inc.
f'I.A Project No. 4050
October 16, 2002
ADDENDUM NO.ONF: (1)
407-370=5550 p.2
The Contract Documents including Project Manual and Construction Drawings lorthcabove projectarc amended
in the tbllowingparticulam, All provisions ofthe original drawings andlorspecificationsshall remain in force, except
asspecihcallymoditicdorchanged herein orbyotherAddenda issued bythe Architect. This Addendum is hereby
made part ofthc Contract Documents, and Contractors are required to coordinateall of these Addendum items
throughout all other inter-rela"clementsofthc Contract Documents. whether Spec ificallyshown by Addendum
ornot. Addendum itcrmsupercederegWremcntsofpreviouslyissued documents and inter-relatedcicmentsofthe
project, unless noted otherwise,
12eceipf of this Addendum shall be acknowle ftd on the Bid fort
Plcase insert -this Addendum into, the Contract Documents.
PROJECT MANUAL. -
Item No, 1: Specification Section 0020, Special Conditions:
RfiVISE Article 26.1) as follows:
CTRTIFICA'i'E UI; STRUCTIM12 LOCATIONS• The General Contractor sl:ail have a s[atc
registered surveyor certify, in writing, with seal affixed, that the location ofa11 new structurc(s) is in
compliance with the Contract Doeununts. "
t N . 2: Specification Section 08710, Door Hardware:
ADi) this section in its entiretyas attached_
MAW1NG5:
Tier Nu. 1: Cover Sheet.lndcx of Drawings_
ADD"11903 Plumbing Plan/Schedules/RiserDiagam/Notes"to index.
item No. 2: Drawing Sheet A50p Room kipish Schedule/Toilct Plans and FLevHtions:
ADD Room Finish Notes, Reicrtoattached Florida Architect.-, R %s"xl 1" Supplemental Dx-awingsheet AD-
1, dated 10/18/02.
Item No. 3: ADD attached 24"x t6"drawing sheet "A903 Plumbing Plan/Schodules/Riser D;agram/N911, ,"Jdaf'od,,
10/ I 8/02,
END Or ADDENDUM 7� .
Pugs I "
Oct 17 02 12:�-)la' i Florida Rrchitects, Inc. 407-370-5550 p.3
ROMFINISH NOTES:
I. INTERIOR PAINT: SHERWIN WILLIAMS 'QUAD -CRAFT" 5EI"N-GLO55 EGGSHELL ODORLESS
ACRYLIC LATEX. COLORS A5 SELECTED BY OWNER,
PRIMERS: CONCRETE AND MA50NRY PRIMERS SHALL BE LOXON BLOCK SURFACER -PLAT
LATEX. GYPSUM WALL PRIMER: PREPRITE 200 WHITE LATEX.
FERROUS METAL PRIMER: KEM KROMIX UNVERSAL METAL ALKYD -TYPE PRIMER.
EXTERIOR PAINT: SHERWIN WILLIAMS EXTERIOR ALL WEATHER ACRYLIC PAINT. COLOR
TO MATGH EXISTING.
NOTE: PROVIDE WATER -BASED EPDXY PAINT AT TOILET ROOM WALLS.
NOTE: CLEAN ALL EXISTING WALLS WITH TR150DIUM PHOSPHATE AS REQUIRED BEFORE
PRInNG AND PAINTING.
2. BA515 OF DE51GN FOR CERAMIC TILE SHALL BE A$ FOLLOWS: DALTLE MOSAIC
GLAZED TILE WITH C3) GOLOR PATTERN TO 4'-0' A.F.F
WITH EPDXY GROUT (GOLOR TO MATCH) AND UNGLAZED TILE WITH EPDXY GETOUT AT
FLOOR. (COLOR TO MATGH).
3. BANS OF DESIGN FOR CARPET 5l'tALL BE A5 FOLLOWS: G+A FLOORGOVERINGS
'SAILAWAY' 79.24 OZ. WITH RUBBER BACKING.
PROVIDE ADHESIVE AS RECOMMENDED BY MANUFACTURER. CCOLOR AND STYLE A5
SELECTED BY OWNER).
4"BA515 OF DESIGN FOR VINYL COMP05MON TILE SMALL BE AS FOLLOWS: ARMSTRONG
STANDARD EXCELON. CCOLOR AS SELECTED BY OWNER). PROVIDE ADHESIVE AS
RECOMMENDED BY MANUFACTURER.
5. VINYL BASE: ROPPE TVBFIG7 1/6' BASE. CCOLOR AS SELECTED BY OWNER).
G. LAY -IN CEILING TILE: ARMSTRONG 'HUMIGUARD' TEGULAR CEILING TILES C51ZE AS
SHOWN ON PLANS) WITH ALUMINUM 5U5PEN51ON GRID.
"0=11 lWACMK =PAL AW neat PF40U a roc.
fl!'1b m m— 40M sw wum fL,A u ROOM FM NWO
6h WA PAID W-I&M I AD-1
w..w#Amm IWAM No acgE
OW 80!Ml PAW Gii= SURE W ORL Dq R"M SM 4V/W0-MW FAX 40'7/M-aOM
t
• REQUEST FOR INFORMATION
F L O R IL D RESPONSE
LicensOMAA002730
1217 WawateAvenue
Ft. Pierce, Florida
34950 Date: 1. 0/ 16/02
7T2.466.0053 (v)
772.466.3002 (17
Project: ALPI Center
Project RFI #:
Subcontractor: Bill Bryant & Assoc.
Subcontractor RFI #: 1
Description:
On Sheet Number A201, Key Note 46 under Demolition Key Notes "Completely remove
concrete slab as indicated. Cap floor drain below grade." Please clarify location.
Response:
Selective concrete demolition will be done as needed for plumbing installation
throughout project, quantities and location to be determined by Contractor to insure code
compliance.
Signed:
—K 1�,
Flori a Archects, In
101517/2002 08:17 561-770-1460 BRYANT & ASSQC:IATF: .L PAGE 01
Bill Bryant & Associates, Inc. REQUEST FOR INFORMATION
1550 Old Dixie Highway
Vero Beech, FL 32960.3655
772- 567-0045 - 800-752-7143 - Fax# 772- 770-1460
f�.
To: Mr. Ken Singletary, AIA
1217 Delaware Avenue
Fort Pierce, Florida 34950 \r M Project Name: ALPI Center
(772)468-3002 FAX R.F.I. Number: 1
Date: 10/16/02
Attn: Mr. Ken Singletary
Sub: ALP) Center Specification Section:
From: Robert H. Paugh Reference Drawings:
Reference Details:
[ ] Information is not shown on the contract documents [ ] Confirmation of a conversation
j X ] Conflicting information needs to be clarified [ ] Schedule Problems
Contract requirements need clarification [ j Coordination Problems
[ ) Contract documents conflict with local building codes [ UL Designs
Descriotion:
On Sneet NumDerA201, Key Note # 6 under Demolition Key Notes "Completely remove concrete slab as
indicated, Cap floor drain below grade." Please clarify location.
Thank you,
Robert
[ ] Work is proceeding as per your instruction
[ ] Work has stopped, pending Wbrrn9tton
[ ] Work has stopped, dire tb relays by other trades
[ ) A change order must be issued prior to commencement of added work
[ ] Information is required by
Reply;
Answered By. Date:
STATE CERTIFIED GENERAL CONTRACTORS
# CGCO17811
• REQUEST FOR INFORMATION
AT RESPONSE
F L 0 R I D A
LicenseBAA002730
1217 Delaware Avenue
Ft. Pierce, Florida
34950 Date: 10/17/02
772.468.0053 (v)
772.468.3002 (f)
Project: ALPI Center
Project RFI #: 2
Subcontractor: Bill Bryant & Assoc.
Subcontractor RFI #: 2
Description:
(1) Please provide plumbing fixture schedule.
(2) Are all new walls to receive 3" sound attenuation blankets?
(3) On Furniture Layout on page A202, Rm. 101 is to receive a 6" projection screen.
Is this to be surface mounted or recessed?
Response:
(1) American Standard for lavatories, water closets and urinals and Elkay or Moen
for faucets basis for design.
(2) 3" sound batts to be used in common walls between classrooms.
(3) Projection screen to be provided by Owner. It will be surface mounted.
Signed:
Florida Arclatects, I .
10N7/2@02 17:14 561-770-1460
x I �i
Dill Bryant & Associates, Inc.
1560 Old Dixie Highway
Vero Beach, FL 32WO-3655
772- 667-MS - SM752-7143 - Fox# 772- 770-146D
To: Mr. Ken Singletary, AIA
1217 f3Ntewsrs Avenue
Fort Pierce, Florida 34950
(772)468-3002 FAX
HRVANT & ASSOGIATI� 4- PAGE 01
REQUEST FOR INFORMATION
Project Name: A,LPI Center
R.F.I. Number. 2
Date: October 17, 2002
Atfrt: Mr. Ken Singletary
Sub: ALPI Center Specification Section:
From: Robert H. Paugh Reference Drawings:
Reference Details:
[ j Infarmmtbn Is not shown on the Contract documertta t I Confirmation of a conversation
[ X) CORMcft information needs, to be clarified [ Schedule Problem
[ j Contract requirements need clarification I ] Coordination Problems
[ ) Contract documenla conflict with local building codes I I UL Designs
Desallotion:
• Please pnvide plumbing fbdurs schedule.
• Are all new wells to receive W sound attenuation blankets?
• On Furniture Layout on page A202, Rm.101 is to receive a 8' projection screen. is this to be
surtdce mounted or recessed?
Thank you,
Robert
(j Work IS proceeding as per your instruction
I ) Work has stopped, pending information
Work has stopped, due to delays by other bade•
E ] A ChOnge order must be issued prior to commencement of added work
[ 1 Information is required by„Bffl.
Reply..
Answered By: Date.
STATE CERTW1160 GENERAL CONTRACTORS
d CGCO17011
• REQUEST FOR INFORMATION
FLOAV
R. l D A RESPONSE
Llcensa#AA002730
1217 Delaware Avenue
PI. Name, orida Date: 10/17/02
772.458.0053 (v)
772,468.3002 (0
Project: ALPI Center
Project RFI #: 3
Subcontractor: Bill Bryant & Assoc.
Subcontractor RFI #: 3
Description:
(1) Would it be possible to receive as-builts for the mechanicals?
(2) Is the water heating system to be reused or should it be figured to be replaced?
(3) Do we know where the sewer lateral is located on the property?
Response-
(1) Plumbing riser available. Mechanical and Electrical not available.
(2) Reuse existing.
(3) West side of building shown on as -built drawings.
Y
Signed:
Flori a Archffecis, Inc.
6,117/2002 17:4. 34 ` 561-770-1460 BPYANT & ASSOCIATFS t. PAGE 01
,
BPI Bryant & Associates, Inc.
1550 old Dixie Hlgttwey
Vero Beach, FL V980-3655
772- 557.0045 - 800-752-7143 - Fax# 772- 770-1460
To: Mr. Ken Singletary, AIA
1217 Doloware Avenue
Fort Pierce, Florida 34950
(772)468-3002 FAX
Alin: Mr. Ken Singletary
Sub: ALP! Center
From: Robert H. Paugh
j Information is not shown on the contract documents
[ X ] Conflicting information needs to be clarified
[ l Contract requirements need cleffrAtion
[ j Contract documents cenfltgt with local building oodes
REQUEST FOR INFORMATION
Project Name: ALPI Center
R.F.I. Number: 3
Date: October 17, 2002
Specibcation Section:
Reference Drawings;
Reference Details:
[ j confirmation of a conversation
[ J Schedule Problems
[ j Coordination Problems
[ j UL Designs
Degrriction:
Would it be possible to roceive as-builts for the mechenir ats?
Is the water heating system to be reused or should it be figured to be replaced?
• Do we know where the sewer lateral Is located on the property?
Thank you,
Robert
[ 1 Work is proceeding as per your instruction
I i work has stopped, pending ink mation
Work has stopped, due to delays by other trades
A change order must be issued prior to commencement of added work.
[ j Information is required by ASAP
Reply:
Answered By: I Date:
STATE CERTIFIED GENERAL CONTRACTORS
# C00017611
ALPI Center Remodel HARDWARE SCHEDULE 10-21-02
ITEM NO: I
SGL DRS too, loos, 100C
EACH TO HAVE:
3.0
EA
HAG
BUTTS
BBI 199 4.5 X 4.5 NRP 630
1.0
EA
VON
EXIT DEVICE
98L X 994L SNB 626
1.0
EA
SCH
CYLINDER
AS REQUIRED
1.0
EA
LCN'
CLOSER
4041 .EDA TB 689: S CUSH @ 1 OOB + 1 OOC
1.0
EA
PEM
THRESHOLD
2005AT LAR SSMS-ES 25 719
1.0
SET
PEM
WEATHERSTRIP
2891 AS LAR 719
.1.0
EA
ROC
KICKPLATE
8" X 2" LDW .050 ME 630
1.0
EA
ROC
FLOOR STOP
482 626 @ 100
NOTE: Mount Closer Ann Shoe & Exit
Strike to 2891AS. Spacial Template.
1.0
EA.
PEM
RA.TK DRIP
346C LAR 719 @ I OOB + I OOC
P.R DRS 117
EACH TO HAVE
6.0
EA
HAG
2.0
EA
IVE
1.0
EA
SCH
2.0
EA
GIM
1.0
EA
PEM
1.0
SET
PEM
1.0
EA
PEM
SOL DR - 1 OOA
EACH TO HAV>r
ITEM N0: 2
BUTTS
SURF. BOLT
LOCKS.ET
01-3 HOLDER
THRESHOLD
WEATHERSTRIP
RAIN DRIP
3.0
EA
HAG
BUTTS
1.0
'EA
SCH
PRIVACY
1.0
EA
LCN
CLOSER
1.0
EA
PEM
THRESHOLLO
1.0
EA
ROC
WALL STOP
3.0
EA
IVE
SILENCERS
1.0
EA
ROC
KICKPLATE
11914.5 X 4.5 NRP 630
SB360 US2
DSOPD RHO 626
900.H 630
2005AT LAR SSMS-ES 25 719
S88D LAR
346C LAR 719
ITEM. NO: 3
BB 1279 4.S X 4.5 652
D40S RNO 626
4041 REG TB 689
200SAT LAR SSMS•FS 25 719
409 630
64
8" X 2" LDW .050 WE 630
ALPI Center Remodel
HA.RDWARF SCHEDULE
10-21-02
SGL DR. 101
EACH TO HAVE:
3.0
EA
HAG
BUTTS
1.0
EA
SCH
LOCKSET
1.0
EA
LCN
CLOSER
LO
EA
ROC
WALL STOP
3.0
EA
IVE
SILENCERS
1,0
EA
ROC
KICKPLATE
SOL DRS 102, 103, 104, 105
EACH TO HAVE:
3,0
EA
HAG
BUTTS
1.0
EA
SCH
LOCKSET
1.0
EA
.LCN
CLOSER
1.0
EA
ROC
WALL STOP
3.0
EA
IVE
SILENCERS
1.0
EA
ROC
KTCKPLATE
SGL DR 103 A
EACH TO HAVE:
ITEM NO: 4
BB 1279 4.5 X 4.5 652
D70PD RHO 626
4041 REG TB 689
409 630
64
8" X 2" .LAW .050 B3E 630
ITEM NO: 5
BB12794.5 X 4.5 652
D50PO RI -TO 626
4041 REG TB 689
409 630
64
8" X'2" LDW .050 B3E 630
ITEM NO. 6
3.0
EA
HAG
BUTTS
1279 4.5 X 4.5 652
1.0
EA
SCH
LOCKSET
D53PD RHO 626
1.0
EA
ROC
WALL STOP
409 630
3.0
EA
IVE
SILENCERS
64
SGL
DRS
106,107,
108.109,1.10,115, 116
EACH TO HAVE:
3.0
EA
HAG
BUTTS
BB 1279 4.5 X 4.5 652
1.0
EA
SCH
LOCKSET
D70PD RHO 626
1.0
EA
LCN
CLOSER
4041 EDA TB 689 (REG @ 110 & 115)
1.0
EA
ROC
WALL STOP
409 630
3.0
EA
IVE
SILENCERS
64
1.0
EA
ROC
KICKPLATE
8" X 2" LDW .050 B3E 630
K
46 -
ALPI Center Remodel HARDWARE SCHEDULE
r
10-21-02
ITEM NO: 8
DUTCH DRS 106A, 107A, 108A, 110A, 111, 112, 113, 114
EACH TO HAVE:
4.0 BB 1279 4.5 X 4.5 652
D10S RHO 626
630-4 626
409 630
64
- EA
HAG
BUTTS
1.0
EA
SCH
LATCHSET
1.0
EA
ROC
DUTCH BOLT
1.0
EA
ROC
WALL STOP
3.0
EA
NE
SILENCERS
3
t
I
N
MUM
++ �tAN
I
52 dK
3iY1dQiYM
c6
to
�
`c
In
in
r
0)
r
ro
r
rU
Izp
a)
�
r-
ro
Al1011aae
i
CIO
N
N
3
_
-
P)
-1.
N
W
t11111fH
7-
T_
Z.
z
T_
Y_
T_
z
7_
z
z
7
7
y
T
7
7.
7
i�
7.
7
r
7
7
7
7_
D
z
T_
z
ME7_
U
t•
t z
a-
tl
._
u
>_
u
�_
c3
f-
�.)
t�
tJ,
J
J
_
v
J
�-
r
ui
H
V,
')
CL
CL
kn
%n
to
%n
,n
U)
JI
.n
.n
n
.n
Ln
v)
.n
.n
..0
In
0
d
oq
M
�
Cn£
T
m
Cm'
m
2
T
i
r)
`+
rl
¢
rl
2
cm
C
C,i
-
.L
o
0
S Guam
rn�Iww�.�Ra-Znamnmrinic.,,mmInac�CI,
�*.��+(
•�
�4
to
;0
m
tr
t0
.Ct
;0
R3
a
rt
to
A
iR
K1
tf5
eh
ICt
.Ct
A>
rt
rt\
In
to
m
,
v
La
L9
W
l9
19
O
is
t9
c9
.D
t.9
c0
ip
CO
c)
is
lv.
10
i0
0
t9
19
I
1
K
X
K
X
K
K
K
ti
x
-C
x
-C
v
v
v
%r
K
K
!!
x
X
x
to
L7
C)Ct)f�)
1
(
.
QUO
t)C)
I
rJ
t
r3
t
C300
C)C)t)i�CS
•
r l
:7
i 7
�')
i')
i' 3
i7
in
i
i Z
r)
r)
>
r)
r)
•,
r>
i
In
-c q
i 1
n
917
n
e)
ti
SO
=t
Ia
C�
U
N
!7
P)
4
trt
C,v
l9
r
R1
K
7.1
q'
(::
2
C
N
r•7
7u,1➢
OU
V
OO�OUCir�UctiC,C3U
CJ
�
O
ww
ADDENDUM TO PROJECT DOCUMENTS
ALPI CENTER REMODELING
Fort Pierce, Florida Architects, Inc.
The Agricultural and Labor Program, Inc.
FLA Project No. 4050
October 28, 2002
ADDENDUM NO. TWO_(2)
[*A
FLORID
OREMM
LlcenseNAA002730
The Contract Documents including Project Manual and Construction Drawings- for the above
project are amended in the following particulars. All provisions of the original drawings and/or
specifications shall remain in force, except as specifically modified or changed herein or by other
Addenda issued by the Architect. This Addendum is hereby made part of the Contract
Documents, and Contractors are required to coordinate all of these Addendum items throughout
all other inter -related elements of the Contract Documents, whether specifically shown by
Addendum or not. Addendum items supercede requirements of previously issued documents
and inter -related elements of the project, unless noted otherwise.
Receipt of this Addendum shall be acknowledged on the Bid Form.
Please insert this Addendum into the Contract Documents.
REQUESTS FOR INFORMATION:
Item No. 1: Add project RFI #4 submitted by Paul Jacquin & Sons, Inc. RFI #1.
Item No. 2: Add project RFI #5 submitted by Bill Bryant & Assoc., Inc. RFI #4.
Item No. 3: Add project RFI #6 submitted by Paul Jacquin & Sons, Inc. RFI #2.
Item No. 4: Add project RFI #7 submitted by Bill Bryant & Assoc, Inc. RFI #5.
END OF ADDENDUM
Page 1 of 1 v\
.off°
-�p'S1
[*A
REQUEST FOR INFORMATION
F L 0 R I D A RESPONSE
Llcense#AA002730
1217 Delaware Avenue
Ft. Pierce, Florida
34950 Date: 10/23/02
772.408.0053 (v)
772.488.3002 (Q
Project: ALPI Center
Project RFI #: 4
Subcontractor: Paul Jac uin & Sons Inc.
Subcontractor RFI #: I
DESCRIPTION:
(1) What is the symbol "T" as shown on Dwg. A902?
(2) Is furniture, appliances by GC? What manufacturer?
(3) Is projection screen installed by GC?
(4) Is markerboard by GC? Existing reused? No details/manufacturer given.
(5) Are shelves by GC? No details/manufacturer given.
(6) Are windows impact resistant? Are shutters required?
(7) What manufacturer is standard for wood doors?
(8) Hardware requirements are called to be in Spec Section 08710. Not issued.
(9) Alternate #1 appears to be signage. Are details available?
(10) HVAC drawing appears to show three (3) AHU's. Only two (2) are scheduled. Does the
classroom #115 have a third unit?
(11) A/C #2 condenser model not given.
(12) Is detail 3/A500 typical for all classroom sink units? Units are not labeled.
(13) Do existing toilets get new fixtures? Accessories? Mirrors?
(14) Addendum One calls for aluminum grid. Is this correct? Is galvanized sufficient?
(15) Addendum One calls for ceramic tile to 4 ft aff. Drawing shows 4" base in toilets and 7'
walls in showers. Schedule shows ceramic tile base to 4' aff. Are the toilet rooms a 4'
wainscoat? The showers 7' walls?
(16) Detail 7/S201 shows 20 ga. studs with 18 ga. blocking. Is this correct? Will this meet
wind load?
(17) Will existing trusses take the imposed loading of the new trusses? Including uplift?
(18) Can permit and impact fees be treated as an allowance?
(19) Is Builders Risk Insurance by Owner?
RESPONSE:
(1) T = TV receptacle.
(2) Furniture/appliances by Owner.
(3) By Owner.
(4) By Owner
(5) By Owner
(6) Yes. No.
(7) Exterior shall comply with ANSI/SDI-100 grade 111, extra heavy duty, Model 4, minimum
16 ga., hot dipped galvanized steel faces. Frames to be Republic Builders Products or
equal. Interior approved manufacturers: (a) Algoma Hardwoods, Inc., (b) Graham
Manufacturing Corp., (c) V.T. Industries, Inc., (d) Weyerhauser Company.
(8) Included in Addendum #1.
(9) Forthcoming.
(10) Yes — Reuse existing.
(11) Reuse existing.
(12) Detail 3, typical all sink base locations. Provide for refrigerator as indicated in Detail
2/A202.
(13) Yes.
(14) Aluminum grid.
(15) Yes.
(16) Yes.
(17) Yes.
(18) Established at Pre -bid = $4,500.00.
(19) Builders Risk Ins. to be by GC. Refer to Article 11.3.1, Section 00800 of Project Manual.
Signed:
Florid Architec , In
ZJIN & S
cQ o
9 6[Nf��
G`ai<tittAiUN
;�'r,' � �-°. :: ,:_:. �.::. COMMERCIAL
9 l� q �'NSt��f()1Vi��irilA��1�5;;. `�j�
f �` - > >'?,: ' : •i ;i;;'' ',`;-s:::;?;.:€ i ::,.:. / INDUSTRIAL
EitS='` C
RESIDENTIAL
ESTABLISHED 1940
ALPI CENTER
QUESTIONS
10/22/02
What is symbol "T" as shown on dwg A902?
Is furniture, appliances by GC ? What manufacturer?
Is projection screen installed by GC?
Is Marker Board by GC? Existing reused? No details / manufacturer given.
Are TV shelves by GC? No details / manufacturer given.
Are windows Impact resistant? Are shutters required?
What manufacturer is standard for wood doors?
Hardware requirements are called to be in spec section 08710. Not Issued.
Alternate # 1 appears to be Signage? Are details available?
HVAC Drawing appears to show three AHU, Only two are scheduled. Does the
classroom 115 have a Third unit?
A/C #2, condenser model not given?
Is detail 3/A500 typical for all classroom sink unit? Units are not labeled.
Do existing toilets get new fixtures? Accessories? Mirrors?
Addendum One calls for Aluminum Grid. Is this correct? Is galvanized sufficient?
Addendum One calls for ceramic tile to 4 ft AFF. Dwg shows 4 in. base in toilets & 7 ft
walls in showers. Schedule shows CT base to 4 ft AFF. Are the toilet rooms a 4 ft
wainscot? The Showers 7 ft walls?
7/S201 shows 20 ga. studs with 18 ga. blocking is this correct? Will this meet wind load?
Will existing trusses take the imposed loading of the new trusses? Including uplift?
Permit and impact fees, Can these be an allowance?
Builders Risk Insurance, is this by owner?
1
— �
f [0 AV
F L 0 R I D A
LIcon se#AA002730
1217 Delaware Avenue
Ft. Pierce, Florida
34950
772.468.0063 (vJ
772.468.3002 If)
REQUEST FOR INFORMATION
RESPONSE
Date: 10/24/02
Project: ALPI Center
Project RFI #: 5
Subcontractor: Bill Bryant & Assoc.
Subcontractor RFI #: 4
DESCRIPTION:
(1) Should doors be provided with welded or knock down frames?
(2) Door 106A on revised door schedule is indicated as hardware group 2. On door
hardware specification, door 100A is shown as using hardware Item No. 3. Please
indicate which group is correct.
RESPONSE:
(1) Doors should be provided with welded frames.
(2) Door hardware Item No. 3 is correct.
Signed:
Florida Archite s, Inc.
0/23/2002 16:3`5 , 561-770-1460 BRYANT & ASSOCIATES. PAGE .01
Bill Bryant & Associates, Inc, REQUEST FOR INFORMATION
1650 Old Dixie Highway
Vero Beach, FL 32960.3855
772- 567.0046 - WO-762 7143 - Fax* 772- 770.1460
To: Mr, Ken Singletary, AIA
1217 Delaware Avenue
Fort Pierce, Florida 34960
(772)468-=2 FAX
Attn: Mr. Ken Singletary
Sub: ALM Center
From: Robert H. PaWh
I I Information Is not shown on the contract documents
j X I Conflicting information needs to be ctiarifled
j 1 Contract naquirements need clarikation
( j Contract documents conflict with I" building codes
Project Name: ALPI Center
R.F.I. Number 4
Date: October 23, 2002
Specification Section:
Reference Drawings:
Reference Details:
13 Confirmiation of a conversation
[ I Schedule Problems
I I Coordination Problems
I 1 UL Pesigns
• Should doors be provided with welded or b rmk down trsmas?
• Door 100A on revised door schedule is indic8bed as hardware group 2. On door hardware
s XKftatbon, door 100A is shown as using hardware Urn No. 3_ Please indicate which group Is
correct?
Thank you,
Robert
[ j Work is proceeding as per your instruction
[ 1 Work has stopped, pending Whrmation
[ I Work hart stoled, due to delays by outer trades
[ 1 A dWv order must be issued poor to commencernent of added work
[ l Information is requked by_&56p
Reply;
Answered By: Date:
STATE CERTIFIED GENERAL CONTRACTORS
V CGCO17811
Oc% 24 02 04: Q;2p,., L PRUL JACQUIN 8, SONS, INC 5614662ODS . p.2
IN & so
` .
GENERAti CONitiACTORS �t
A ` COMMERCIAL
CO_NSTRUCrIQN MANAGERS INDUSTRIAL
�� .DF,BTGN-BUILDERS RESTnEIVT]AL
ESTABLISHED 1940
AL.PI CENTER
REQUEST FOR INFORMATION
10/25/02
1. At the pre -bid it was indicated that the main electrical disconnect is to be replaced. Plans
call for it to remain. Which is this correct?
.2. Should a soap dispenser and towel dispenser be furnished for each sink? They are only
shown in the toilets.
3. Are there preferred model numbers or manufacturer for the toilet accessories?
4. Section 08800 Para 3.5.2 refers to a one and two year warranty. Plumbing drawing calls
for one-year warranty. Please confirm warranty term?
5. Demolition plan does not call for removal of roof over existing walkway. Doesn't this
have to be removed for truss installation_ ?
6. Drawings do not show roof ridge vent. Existing roof ridge is vented. Will new roof
ridge require continuous vent at new ridgeline?
7. I cam fend "Child Craft" for the cubbies in Sweets or The Blue Book is there another
name they deal under?
$, Drawing A100, Life Safety, what are the solid black squares? Fire extinguishers?
P.O. Box 4343.7349 Commercial Circle - Ft. Pierce, FL 34948-4343 - Phone (561) 465-2475 - Fax (561) 466-2806
• REQUEST FOR INFORMATION
F L O R I AT RESPONSE
license8AA002730
1217 Delaware Avenue
Ft. Pierce, Florlda
34050 Date: 10/28/02
772.468.0053 (v)
772.458.3002 (f)
Project: ALPI Center
Project RFI #: 7
Subcontractor: Bill Bryant & Assoc.
Subcontractor RFI #: 5
DESCRIPTION:
(1) We know that we have to provide fire extinguishers and cabinets. Please specify quantity
and locations.
(2) Wall covering is specified for certain rooms. Is this on an allowance?
(3) What is the pattern for tile? Do we price 1, 2, 3 or 4 tile?
(4) What is design for VCT installation?
RESPONSE:
(1) Total quantity is eight (8). Locate adjacent to exterior exit doors:
a., One (1) Lobby 100
b. One (1) Corridor 10013
C. Two (2) Corridor 100E
d. One (1) Room 108
e. One (1) Room 109
f. One (1) Room 111
g. One (1) Room 115
(2) Wall finishes are to be painted.
(3) To be decided by Owner. Maximum six (6) color tile.
(4) To be decided by Owner.
Signed. -o .
Florida Architects, Inc.
, I , M!25/2802 15: R ��5;1-770-1460
13RYA14T & ASSOCIATE,: „e r PAGE 01
Bill Bryant & Associates, Inc.
1550 Old Dixie Highway
Vero Beach, FL 32960-3655
772- 667-0046 - B00-752-7143 - Fax# 772.770-1460
To: Mr, Ken Singletary, AIA
1217 Delaware Avenue
Fort Pierce, Florida 34950
(772)460.3002 FAX
Attn: Mr. Ken Singletary
Sub: ALPI Center
From: Robert H. Paugh
[ ] Information is not shown on the contract documents
[ X } Conflicting information needs to be clarified
[ } Contract requirements need clarification
[ } Contract documents conflict with local building codes
REQUEST FOR INFORMATION
Project Name: ALPI Center
R.F.I, Number; 6
Date- October 25, 2002
Specification Section:
Reference Drawings:
Reference Details:
[ [ Confirmation of a conversation
[ j Schedule Problems
[ )Coordination Problems
} UL Designs
t>esoriotion:
1 • We knave that we have to provide fire extinguishers and cabinets. Please specify quantity and
locations
2, • Wall covering is specified for certain rooms, is this on an allowance?
3 • What is the pattern for tile? Do I price 1, 2,3, 4 Tile?
*� • What is design for VCT Installation?
Thank you,
Robert
( ] Worts is proceeding as per your instruction
[ ] Work has stopped. pending information
C ) Work has stopped, due to delays by other trades
[) A change order must be issued prior to commencement of added work
j ] Information is required by ASAP_ _
Reply,
Answered By: Data:
STATE CERTIFIED GENERAL CONTRACTORS