Loading...
HomeMy WebLinkAboutcompaction testHeadquarters 11345 U.S. Highway 1 Sebastian, FL. 32958 Orlando 723 Progress Way Sanford, FL. 32771 Tl C9 1 t ENGINEERING 1%L-3A L AND TESTING SOIL COMPACTION REPORT ASTM D 1557 and ASTM D 6938 Mailing PO Box 78-1377 Sebastian, FL. 32978 Phone: 772-589-0712 C.A.# 5693 KSMengineering.net DATE TESTED: February 12, 2020 KSM JOB #: 200681-1d/MH/jo PERMIT#: 1911-0550 NUC# 630 CONTRACTOR: Wynne Development Nuc Model: MC-10R-P JOB LOCATION: 13942 Encantardo Nuc Serial #: 30630 Fairways Fort Pierce, Florida ITEM TESTED: Compacted Foundation Fill TEST LOCATION PEN DRY MAX. DRY PERCENT DEPTH OF SAMPLE READ DENSITY PROCTOR VALUE (P.C.F) COMPACTION 1. N.E. 0" -12" 50 11L6 117-.7 99.0% 2. S.E. 110.4 98.0% 3. Center 111.1 98.6% 4. N.W. 109.3 97.0% 5. S.W. 108.6 96.4% Soil Description: Brown Sand with Shell Fragments In Place Moisture: 5.3% Proctor Optimum Moisture: 11.0% Proctor Max. Dry Density: P.C.F. 112.7 @ Test Locations the Density & Penetrometer readings indicate the Degree of Compaction Meets_ Minimum Required for Staked Foundation Respectfully Submitted: ,,,��n�nnry rrr 'sv .. sFZ��.p: W E G H T P C F D R-- Y Moisture - % of Dry Weight Disclaimer: Contractor is responsible to maintain the tested area in the condition that KSM completed the indicated passed compaction test. KSM is not responsible if the tested area has been altered from the approved inspected condition. Email to: St Lucie Building Department Proudly Serving Florida since 1990