Loading...
HomeMy WebLinkAboutCOMPACTION TESTS (3)l� ederal Ongineering ®Oesting, Inc. Phone: 954-784-2941 E-Fax- 954-784-7875 admtn@fed%ng,com _.. www.fed-eng.com Field Density Tests of Compacted LN Project: Pro osed Residence Soils Method D-6938 Address: 5350 Slash Pine Trail, Fort Pierce, FL 34951 Date: July 31, 2020 Area Tested: Building Pad - Retest Order #: 20CMT2337 Material Type: Clayey Brown Sand with Shell &Rock Permit #: 2q� - po�� Tech: OE Company: Groza Builders, Inc. Address: 511 SW Port St. Lucie Blvd. Port St. Lucie, FL 34953 Compaction Req.: 95°/p Proctor Method- ASTM n_15F7 I esi # 1 2 3 4 5 6 TEST LOCATION SE Corner of Buildin Pad Center of Buildin Pad NW Corner of Buildin Pad SW Corner of Buildin Pad Probe Depth 12" 12" 12" 12" Elev. FL FL FL FL Moist %Density 9.8 12.3 10.8 12.0 Dry PCF 117.8 114.1 120.3 114.3 Proctor Value PCF 118.0 118.0 118.0 118.0 Optimum Moisture Compaction - Pass 10.0 99.8% Yes 10.0 96.7% Yes 10.0 101.9% Yes 10.0 96.9% Yes 7 8 9 10 11 12 13 14 Remarks �aa Ro a etas ro- --- Zr — ---al Imormation for Disclaimer This is a Compaction Test only on the top 12" of the pad and is not a verification of Soil Bearing Capacity. Legend for Elevation: PR = Proofroll 1,2,3 = 1st, 2nd, 3rd Lift Submitted by:----1��,�� C.._._ SL = Sprin de FL =Final Lift Keith LeBlanc, P.E. SG = SubgraradBG = Below Grade Federal Engineering &Testing, Irrc% � BC = Basecourse BOF = Bottom of Footing Florida Reg. No. 59394 TOP = Top of Pipe FG = Finished Grade As a mutual protection to clients, the public and ourselves, all reports are submitted as the confidential Certificate of Authorization #5471 conclusions or extracts from or regarding our reports is reserved pending our written approval. A density testptlePermyinefsethe degree of lients, -i authorization thor publication lasted layer t tmaterial only. A density does not replace a soil bearing capacity determination. These density tests do not certify the underlying soil material- heluw the proposed structure. The results do not preclude or guarantee that future settlement and cracking will not occur. A soil boring test is required to certify that the underlying soils will support the pro; osed structure without settlement. If no soil borings have been performed to verify the underlying soils, we recommend that soil borings be performed to evaluate the suitability cf the underlying SOH to support the proposed structure. After laying dormant for a period of 90 days or after heavy rain/storms, retesting must be performed on 11,ls wrrk. PAGE 1 of 2 Oederal WOQ ngineering esting, Inc Field Density Tests of Compacted Soils Method D-6938 Phone: 954.784-2941 E-Fax: 954-784-7875 admin@fed-eng.com www.fed-eng.corn Project: Proposed Residence Date: August 5, 2020 Address: 5350 Slash Pine Trail, Fort Pierce, FL 34951 Order #: 20CMT2390 Area Tested: Building Pad Permit #: 2001 - O2 Material Type: Clayey Brown Sand with Shell & Rock Tech: MH Company: Groza Builders, Inc. Address: 511 SW Port St. Lucie Blvd. Compaction Req.: 95% Port St. Lucie, FL 34953 Proctor Method: ASTM D-1557 Test # TEST LOCATION Probe De th p Elev. Moist � Dry Density PCF Proctor Value PCF Optimum Moisture % Compaction Pass 1 NW Corner of Pad 12" 2L 15.6 112.2 118.0 10.0 95.1 % Yes 2 NE Corner of Pad 12" 2L 7.9 120.1 118.0 10.0 101.8% Yes 3 SE Corner of Pad 12" 2L 10.4 121.4 118.0 10.0 102.9% Yes 4 SW Corner of Pad 12" 2L 16.8 112.3 118.0 10.0 95.2% Yes 5 6 7 8 9 10 11 12 13 14 o,.......i— .. _ _ _.. .- - - -- - Legend for Elf PR = Proofroll SL = Springline FL = Final Lift Keith LeBlanc, P.E. SG = Subgrade BG = Below Grade Federal Engineering & Testing, Inc BC = Basecourse BOF = Bottom of Footing Florida Reg. No. 59294 TOP = Top of Pipe FG = Finished Grade Certificate of Authorization #547' Asa mutual protection to clients, the public and ourselves, all reports are submitted as the confidential property of clients, and authorization for publication of statements, conclusions or extracts from or regarding our reports is reserved pending our written approval. A density test determines the degree cf compaction of the Tested layer of material only. A density does not replace a soil bearing capacity determination. These density tests do not certify the underlying soil materials below the proposed structure. The results do not preclude or guarantee that future settlement and cracking will not occur. A soil boring test is required to certify that the underlying soils will support the proposed structure without settlement. If no soil borings have been performed to verify the underlying soils, we recommend that soil borings be performed to evaluate the suitability cf the uVedying soil to support the proposed structure. After laying dormant fora period of 90 days or after heavy rain/storms, retesting must be performed on this work. PAGE 1 of 2 OQ ederal Phone:954-784-2941 Q ngineering E-Fax: 954-784-7875 admin@fed-eng.com ®OQ esting, Inc. www.fed-eng.com Field Density Tests of Compacted Soils Method D-6938 Project: Proposed Residence Date: September 1, 2020 Address: 5350 Slash Pine Trail, Fort Pierce, FL 34951 Order #: 200O2712 Area Tested: Building Pad Permit #: Zoo\ - Vol Ill Material Type: Clayey Brown Sand with Shell & Rock Tech: CJ Company: Groza Builders, Inc. Address: 511 SW Port St. Lucie Blvd. Compaction Req.: 95% Port St. Lucie, FL 34953 Proctor Method: ASTM D-1557 Test # TEST LOCATION Probe Depth Elev. Moist Dry Density PCF Proctor Value PCF Optimum Moisture % Compaction Pass 1 NW Corner of Pad 12" FL 10.9 103.2 118.0 10.0 87.5% No 2 NE Corner of Pad 12" FL 13.6 98.9 118.0 10.0 83.8% No 3 SE Corner of Pad 12" FL 9.2 105.6 118.0 10.0 89.5% No 4 SW Corner of Pad 12" FL 8.7 104.9 118.0 10.0 88.9% No 5 6 7 8 9 10 11 12 13 14 Remarks: See Reverse Side (Page 2 of 2) for Additional Information for Disclaimer I ms Is a compaction I est only on the top 12" of the pad and is not a verification of Soil Bearing Capacity. Legend for Elevation: PR = Proofroll 1,2,3 = 1 st, 2nd, 3rd Lift Submitted by: SL = Springline FL = Final Lift Keith LeBlanc, P.E. s�� SG = Subgrade BG = Below Grade Federal Engineering & Testing, Inc.' / v BC = Basecourse BOF = Bottom of Footing Florida Reg. No. 59394 TOP = Top of Pipe FG = Finished Grade Certificate of Authorization 95471 As a mutual protection to clients, the public and ourselves, all reports are submitted as the confidential property of clients, and authorization for publication of statements, conclusions or extracts from or regarding our reports is reserved pending our written approval. A density test determines the degree of compaction of the tested layer of material only. A density does not replace a soil bearing capacity determination. These density tests do not certify the underlying soil materials beiow the proposed strucure. The results do not preclude or guarantee that future settlement and cracking will not occur. A soil boring test is required to certify that the underlying soils will support the proposed structure without settlement. If no soil borings have been performed to verify the underlying soils, we recommend that soil borings be performed to wmivate the suitability of the underlying soil to support the proposed structure. After laying dormant fora period of 9g days or after heavy rain/storms, retesting must be performed on this work.. PAGE 1 of 2