Loading...
HomeMy WebLinkAboutBuilding PermitCode Compliance Division 2300 Virginia Avenue Ft. Pierce, FL 34982 Phone: (772) 462-1553 Fax: (772) 462-1148 hftp://stiucleco.gov/ce BUILDING PERMIT Issued: 10/17/2007 Conf #; 687 Permit #: SLC- 0707-0163 Job Location: 21220 GLADES CUT-OFF RD City: PORT ST LUCIE Page 1 Permit Type: Building Residential (SFR) Job Description: REPLACING MOBILE HOME WITH NEW CONSTRUCTION OF SINGLE FAMILY RESIDENCE. Subdiv: Lot: Block: Parcel: 4221-233-0030-000/6 Owner Builder SANDRA L BROWN (772) 489-5370 21220 GLADES CUT OFF ROAD PORT ST LUCIE, FL 34987 Property Owner SANDRA BROWN (772) 529-7339 21220 GLADES -CUT-OFF RD PORT ST LUCIE, FL 34987 Setbacks Left: 175.00 Right: 152.57 Front: 150.00 Rear: Zoning: AG-5 Number of Units: 1.00 Floors: 1 Buildings: 1 Square Footage: 1,848.00 Minimum Floor Elevation: Flood Map: 375 Flood Zone: X Elev: Job Value: $ 0.00 Permit holder acknowledges through acceptance of this permit that separate permits must be obtained as required by the Florida Building Code including those for all electric, plumbing, mechanical, roofing, and structural work. Further, he/she acknowledges responsibility to comply with all requirements of the 2004 Florida Building Code. NOTICE: In addition to the requirements in this permit, there may be additional restrictions applicable to this property that may be found in the records of this County, and there may be additional permits required from other governmental entities such as water management districts, state agencies, or federal agencies. s:553.79(10), F.S. WARNING TO OWNER: YOUR FAILURE TO RECORD A NOTICE OF COMMENCEMENT MAY RESULT IN YOUR PAYING TWICE FOR BUILDING IMPROVEMENTS TOYOUR PROPERTY. IF YOU INTEND TO OBTAIN'FINANCING, CONSULT WITH YOUR LENDER OR AN ATTORNEY BEFORE RECORDING YOUR NOTICE OF COMMENCEMENT. s.713.195, F.S. Christopher Lestrange Building Official Date For Automated Inspections, Call (772) 462-1261 For Questions, Call (772) 462-2172 St. Lucie County Land Development Code Section 11.05.01 (A) (2) states; Building Permits shall expire and become null and void if work authorized by such Building Permit is not commenced, having called for and received a satisfactory inspection, within six (6) months from the date of issuance of the permit, or if the work is not completed within 18 months (permit by contractor) or 24 months (permit by owner) from the date of issuance of the Building Permit. .