Loading...
HomeMy WebLinkAboutSunpro-solar-contract-6.13.19CONTRACT PHOTOVOLTAIC ARRAY INSTALLATION Date: __________________ This Contract (“Contract”) is hereby entered into by and between _______________________________________ (hereinafter collectively referred to as “Owner”), and Marc Jones Construction LLC, doing business as Sunpro Solar (Hereinaf- ter referred to as “Sunpro”.), Job Address _________________________________________________________________________________ ____________________, _______________________ (City) (State) We, Owners, hereby contract with Sunpro, for the following described work, and authorize Sunpro to furnish all necessary material, labor and workmanship to install, construct, and place improvements according to the specifications, terms and conditions hereinafter described, at/on our residence. This contract document represent the entire agreement of both parties and supersedes any prior oral or written agreement. Any changes to this Contract must be approved by Sunpro in writing. Both parties agree that no verbal agreements will be recognized. SCOPE OF WORK Install a photovoltaic solar system (the“System)at the Owner’s residence comprised of the following components; Major System Components Photovoltaic Panels Qty.– _______ Model: _____________________________ Inverters Qty.– _______ Model: _____________________________ The purchase of any Enphase microinverter will include the installation of the Envoy energy management system with lifetime free online monitoring access provided by Enphase. Racking and Mounting Equipment Unirac Solar Mount rail system with PV Quickmount flashing system Initialed by: Owner _____ Contractor _____ Sunpro Solar 866-450-1012 www.gosunpro.com 1 of 3DocuSign Envelope ID: A5997153-58B9-41DF-A074-623C82033C2F 2903 Admiral Street IQ7+ 26 8/14/2020 LG 345 Fort Pierce 26 FL Chris Evans 8/14/2020 Solar Array Installation DUTIES OF SUNPRO • Sunpro shall obtain all county and city permits necessary for the system to be installed. • Furnish current general liability and worker’s compensation insurance upon request. • Install System to comply with all applicable codes and wind zone requirements, including 180 mph wind zone. • Sunpro shall remove all construction debris and leave the project in a broom clean condition. • Once homeowner has paid in full, Sunpro will issue all product & labor warranties and a power production guarantee to the Owner based on shade analysis performed at the time of the system installation. Sunpro will also complete the Monitoring system if applicable and will assist the Owner with entering into an Interconnect Agreement between Owner and the applicable utility company. OWNER • The Owner will have no control over or charge of installation means, methods, techniques, sequences, procedures, or for safety precautions and programs in connection with the installation of the System, since these are solely Sunpro’s responsibility. • Owner is responsible for obtaining any approvals necessary from their Homeowners Association. • Owner will provide access point for Enphase envoy to connect to home internet service through a wired connection. This is typically done through the home’s router. Owner will provide WIFI internet access to take advantage of Enphase’s monitoring system. • Owner recognizes that Sunpro Solar is not qualified to offer any tax or legal advice. Owner should consult with a CPA or a qualified tax advisor to ensure owner receives any local, state or federal incentives that may be available. • Owner acknowledges that the federal incentive for costs associated with qualified solar property is in the form of a nonrefundable TAX CREDIT. UNKNOWN CONDITIONS Sunpro is not responsible for conditions that are encountered at the installation site which are concealed physical conditions or unknown physical conditions of an unusual nature, which differ naturally from those ordinarily found to exist. Sunpro is not responsible for existing electrical service deficiencies that mayor may not be code compliant. Existing electrical service components, including but not limited to, breaker boxes/panels, disconnects, meters, fuse boxes, wiring, conduit and all other necessary components to energize an existing structure are not the responsibility of Sunpro. At the sole discretion of Sunpro, Sunpro may cancel this Contract due to (i) any conditions encountered that impact the performance, installation or code requirements of the System’s installation, or (ii) any other conditions that impact the safe and effective installation of the System. ARBITRATION AND LEGAL Any controversy or claim arising out of or relating to this Contract, or the breach thereof, shall be settled by arbitration administered by the American Arbitration Association under its Construction Industry Arbitration Rules, and judgment on the award rendered by the arbitrator(s) may be entered in any court having jurisdiction thereof. In the event of any arbitration or litigation relating to this Contract, the prevailing party shall be entitled to reasonable attorney fees, costs and expenses. If any amounts due under this contract are not paid when due, any such unpaid balances shall be charged interest at the rate of 1 1/2 % per month which is an annual percentage rate (APR) of 18 % per year. CLASS ACTION WAIVER Arbitration shall proceed solely on an individual basis without the right for any Claims to be arbitrated on a class action basis or on bases involving claims brought in a purported representative capacity on behalf of others. The arbitrator's authority to resolve and make written awards is limited to Claims between Owner and Sunpro alone. Claims may not be joined or consolidated unless agreed to in writing by all parties. Initialed by: Owner _____ Contractor _____ Sunpro Solar 866-450-1012 www.gosunpro.com 2 of 3DocuSign Envelope ID: A5997153-58B9-41DF-A074-623C82033C2F Solar Array Installation PAYMENT TERMS Total Contract Price: $ ______________________ Rebate: $ ______________________ Customer Final Price: $ ______________________ Contract is contingent upon Owners approval for financing: YES NO Finance Partner: _____________________ Loan Years: __________ Loan Interest Rate: __________ CASH TERMS Draw 1: Initial down payment at contract signing (____%): $ ______________________ Draw 2: 2nd Payment upon start of work (____%): $ ______________________ Draw 3: 3rd Payment upon completion of work* (____%): $ ______________________ *Final payment for the solar energy system is due immediately upon passing of inspection and before utility tie-in. Contract Contingencies: ______________________________________________________________________ ___________________________________________________________________________________________ ___________________________________________________________________________________________ You, the buyer, may cancel this transaction at any time prior to midnight of the third business day after the date of this transaction. See the attached notice of cancellation form for an explanation of this right. _________________________________________ __________________ Sunpro Agent Signature Date _________________________________________ Sunpro Agent Print _________________________________________ __________________ Owner’s Signature Date _________________________________________ Print Name _________________________________________ __________________ Owner’s Signature Date _________________________________________ Print Name Sunpro Solar 866-450-1012 www.gosunpro.com 3 of 3 License AL #06642, AZ #323436, AR #M-9565, FL #EC13001242, LA #49417, MS #21374, NM #395254, NC #U.32923, OK #186549. DocuSign Envelope ID: A5997153-58B9-41DF-A074-623C82033C2F Mosaic 0.00 15 Years 6,500.00 51,500.00 Ruben Delgado X 0.00 0.00 8/14/2020 4.99% 45,000.00 8/14/2020 Chris Evans