Loading...
HomeMy WebLinkAboutPower Release 08-26-'20 10:41 FROM- 7728787656 T-215 P0006/0006 F-530 ' YZ.:.L, t.. L'4': i'�'M!�1.••• �'lYI�1M��+r����7��V 1�i� 2 i n a kIVO, Fax:x'7.2= 6 SO I` Dat= � Project•Address. —��\ �y THE UNDMGNED.HEREBY REQtTEST RELY OF ELEMCAL.DOWER TO THE ABOVE DESCRIBED PROPERTY, FOR A P•ERI0D NOT 110 plt;EED M41RTI(30) DAYS.FOR THE PURPOSE OF-TESTING SYMMS AND EQUIPMENT IN PREPARKnON FOP,A F-R,0L..INsp ON. IN CONSIDERATION OF APPROVAL.OF THE vaQUrSr WE-HERM ACKNOWLEDGE AND AMM AS FOLLOWS: i. This termordry power release is requested for#be above$ d puMose(mly,and twe WE be no gccuWcy of any type,other titan that permitted by construction during this time perioid. 2. As wiirm by our signatures,vve:htrby age th a'bfde by all terms and 4mriditions of this agreement, 1ndu#9 B ildirt0 Division.Policy;wia ch is iricarporated hemin by references, 3. All oonditibns:and regquft- nepts lis W in the atilkhed document erred"Requirements for 30 Day Power for Testing"'hm been fulfilled'dnd the premise is ready for compliance•Inspection. 4. All requests for an,a tantion beyond 30 days•nvA,be:made in wrflS Q to the Building Ofi`Ccial siding the reason'.for Me muest. Pdvier maybe reMoAditm the site ant/er a Stop Wb*Oirder issued-if the F5nef InspeWon las not been apprta within 30 days A fee of$100.00 will be required to hitt the Stop Work Order. WE HEREBY RELEASEAND AGREE TO HOLD HARMLES%ST. WCIE COUNTY,AND THER EMPLOYEFS FROM ALL LIABRIITES AND_CLAIMS OF ANY TYPE'05NATURE I K10i MAY ARISE NOW OR tq THE f�MAE OUT OF TN1s'TkANSAmok INCLUl 1k. ANY DAkA(1E'V a41kAY BE INC`:tli DUE TO THE 33ISCC3N�il Ci`lON OF Ems .pbvvt, #t iii`f kv O, F V.10,LA-90N OFf�]1,s AGREEMENT. OWfti .Silt— DA7F- ELEC`tRICAt CONTaACM- RSIGNA' DATE'