HomeMy WebLinkAboutInspection Docs 05-29220 10:41 FROM- 7728787656 T-927 P0005J0006 F-122
n `{�Mj ► e 4c
dx r si ',�4"�11 ���6'4.'�I1(f�'i1�1,l1
ues 6r;5 Day, q*00*�Iowar Release
Datm pi g NOMber.
THE UNDE<RMGNEi7 HEREBY REQUEST REUSE OF ELECTRICAL POWER TO THE ABOVE DFSMMED
PROPERTY,FOR A PERIOD NOT TO EXCEED THMTY(30)DAYS,FOR THE PURPOSE Of-TESMG SYSTEMS
AN6 EQLiIPMENT iN PREPAi O.N:FOR.A. DJAL.Mi?'.°t ON. IN CONSIDERATION OF APPROVAL OF THE
REQ=T -MM4BY AMOWLEDGE-AND AGPEE.AS ijUM.-
1. This Crary power mftae is A quest ed ftrr the above sited purer only,and there WE be no
occupancy of any ty0,tatter than that pe=bBd by wnsbn ion dtiring this time pedal.
2. A$•witriess by our siyrr^r*s,We heresy,age to OWo by-aH terms and conditions of this agreemat,
Inc[tl ftg BuildtlZg Dtvigion Policy,wiuoh is intvMdr h6i-in by rdWvnm
3. Ali conditions'and mquitethepts listed in bie attaehed doalment enbtled"Requirements forr 30 Day
Power for TeOng"have been fuiflited and the premise is Feody far compliance,inspecuon.
-4, AM requests for an oftmion beyond 30•,days-must be,made in writing t o the Boding Offrdai sMng
the t ri tbr the raga_est, Power maybe removedYmm the site and/or a Stop Work-Order&AW if
the Finai Inspe0on hips not been approved Within 30-days. A N-e of$.00.00 will be Mi vsd to flit
the Stop Wont Girder.
WE HERESY RELEASE AND AGREE TO HOLD WALSa,s .LUCiE couNTy,AND THE3R 1:9PLgyEF„s FRom
ALt.UWa. TIE .AND.Ct.AIMS OF ANY TYPE,,OF l�Al:URE WHICH MAY ADZE NOW OR IN TME FM, RE OUT
OF THIS TRANSACTION,INCLI.3l3Il�ii ANY-DAi�C; C CN,MAY BE INCtJ bldE TO THE
l3ISCOWIEi�; ON OF MiVMCAL PG3WER IN T14E EVENT OF WOLMON OF Tim AGRMgENT_
OVNNi t"SIi to tl --•-^` DA-M
co ME
LATE
i:LE fRfCAL CON7iY MP,SIGUMM dA'Fi: