Loading...
HomeMy WebLinkAbout30 day power release 05-27-'20 09:20 FROM- 7728787656 T-923 P0001/0001 F-114 0."b6veiil: #IEII+ " porde•l�,L tttl� tOn ME'VlSl�Q1t1 M-I Ilk 772;462~1 :� � '� -$ � Request-for 30-Day T poniry Power Release Date: PeraftWomber: Project Address; tsg THE UNDERSIGNED mmm REquE$T RELEASE OF ELEcrRIcAL POWER TO THE ABOVE DESC UBW PROPERTY,FOR A PERIOD NOT TO EXCEED THIRTY(3.0)DAYS,FOR THE PURPOSE OF•TESTING SYSFE~MS AND EQUIPMENT IN PREPARATION•FOR A.FINAL INSPEC1710N. IN CONSIDERATION OF APPROVAL„OF THE REQUEST WE-,HEREBY ACKNOWLEDGE-AND AGREE AS FOLLOWS' 1. Tds temporary power reime is requested forte move 91EW purpose only,and Uvre vd be no occupancy of any type,tither than that permitted by construchon during this time period. 2. As witness by,our signatures,we hereby.agree W abide by-all terrns and condrdons of this agreement, including Building Division Policy,which is incorpor&W herein by reference. 3. Ail conditions:and requirements fisted in the attached document entitled"Requirements fbr 30 pay Power for Testing"have been fulled'and the premise is ready for compliance inspection. 4. All r dquees far are ektension beyond 30 days must be:rnade in wtift to the Building OfflcW swung the reasori for the request. Power maybe removecf ftm the site anrtW a Stop Work-Order issued.if the rival Inspection has not been approved within 30-days. A fee of$100.00 will be required to lift the Shap Work Order. WE HERBY RELEASE AND AGREETO HOLD HARMLESS,St:•LUUCIE COUNTY,AND THEIR EMPLOYEES FROM ALL LLABILIIIES AND.CLAIM OF ANY TYPEOF NATURE WHICH MAY ASE NOW OR IN THE RY JRE OUT OFTHT$*"ACTIQN,INCLUDING' ANY OAMAOE WHICk'MAY B'E INCdRM DUE TO THE DISMMC�"i`I�ON OF MECMCAL POWER IN THE BIENT Or-VIOLAT.I.ON OF THIS AGREEMEN C}WWP-,SIG!!f • = "',.�" DATE oN-TI-IRACTORR DA7E ELEt (:AL CON7R*71 7 SIGNATURE DATE•