Loading...
HomeMy WebLinkAboutCompaction Test 06/02/2020 15:54 7725896469 KSM ENGINEERING PAGE 01/01 HeadquartersMailing Zr lk � ENGINEERING PO Box 78-13777 11345 U.S. Highway 1 Orlando Sebastian, PL. 32958 Phone:VL AND TESTING 'an, FL. 32978 772-589 0712 723 Progress Way SOIL COMPACTION REPORT C.A_#5693 Sanford, FL. 32771 ASTM D 1557 and ASTM D 6938 KSMengineering,net DATE TESTED: June 1, 2020 KSM JOB#: 202452-zd/CH/jo PERMIT#: 1911-0014 NUC# 417 CONTRACTOR: William Layne Nuc Model: 3500 JOS LOCATION: 15375 Skyking Drive Nuc Serial#: 3417 Fort Pierce,Florida ITEM TESTED: Footers for Pole Barn TEST LOCATION PEN DRY MAX. DRY PERCENT OF SAMPLE DEPTH READ DENSITY PROCTOR VALUE(P.C.F) COMPACTION 1. South Footers -48" to -36" 45 112.4 1 .4.4 98.3% 2, North Footers " 45 112.0 97.9% Soil Description: Brown Sand with Clay 116.0 VV I E In Place Moisture: I I I I I 1 16.0% G 115.0 �.._ _•._ . —.._ ,. �. — - H I 1 I I I Proctor Optimum Moisture- T X1.0% 114.0 \-44 P Proctor Max. Dry Density:P.C.F.114.4@ Test Locations the Density& FPenetrometer readings indicate the Degree of Compaction Meets 112.0 Minimum Requirement I7 R I ! I I I for Staked Foundation Y ( I I I I Respectfully Submltted::==*'" 111.0 4.._... 8 9 10 11 12 13 14 ij�i. DA J''e N � Moisture-% of Dry Weight s •� ' ' Disclaimer; Contractor is responsible to maintain �: O• 439W the tested area in the condition that KSM f L completed the indicated passed compaction test. �NA > 04� �� KSM is not responsible if the tested area has been :.,4. 01 0-•���`+ altered from the approved inspected condition. N A� farlttk501 Bryan E. Dahllce, P.F. V.P.of Engineering PE#81439 6/2/2020 Email to: Dougbrantley841g@gmail.com Proudly Serving Florida since 1990