HomeMy WebLinkAbout3414 industrial 33rd final appro�1*
APPLICATION #:AP1431212
STATE OF FLORIDA
PERMIT #:56-SF-1986602
HEALTH
DEPARTMENT OF
SYSTEM
DOCUMENT #:F11493753
to'txQ ONSITE SEWAGE TREATMENT AND DISPOSAL
CONSTRUCTION INSPECTION AND FINAL
APPROVAL
DATE PAID:08/28/29/201019
4` WEI
FEE PAID:380.00
RECEIPT #:56-PID-4083255
APPLICANT: Wallaby's Fabrication
AGENT: MICHAEL STUHR (ASHTON SEPTIC TANKS, INC.)
PROPERTY ADDRESS: 3414 Industrial 33rd St Fort Pierce, FL 34946
LOT: 5 BLOCK: 3
SUBDIVISION: Airport Industrial Park ID#: 1429-501-0029-000-7
CHECKED [X] ITEMS ARE NOT IN COMPLIANCE WITH
STATUTE OR RULE AND MUST BE CORRECTED.
TANK INSTALLATION
SETBACKS
[ ] [01] TANK SIZE [1] 1537.00 (21 1090.00
[ ] [27]
SURFACE WATER FT
[ ] [021 TANK MATERIAL Polyethylene
[ ] [28]
DITCHES 90 FT
[ ] [031 OUTLET DEVICE
[ ] (291
PRIVATE WELLS FT
[ ] [041 MULTI -CHAMBERED [ Y N ]
[ ] [301
PUBLIC WELLS FT
[ ] [051 OUTLET FILTER Polylok PL-68
[ ] [311
IRRIGATION WELLS FT
[ ] [06] LEGEND 1. 70-143-16DC4 2, 70-143-11 DC4
[ ] [321
POTABLE WATER 12 FT
[ ] [071 WATERTIGHT
[ ] [331
BUILDING FOUNDATIONS 5 FT
[ ] [081 LEVEL
[ ] [341
PROPERTY LINES 5 FT
[ ] [091 DEPTH TO LID
[ ] [351
OTHER FT
DRAINFIELD INSTALLATION
FILLED / MOUND SYSTEM
[ ] [101 AREA [11 622.6 [21 SQFT
[ ] [36)
DRAINFIELD COVER
[ ] (111 DISTRIBUTION BOX HEADER X
[ ] [37]
SHOULDERS
[ ] [121 NUMBER OF DRAINLINES 1. 3.00 2.
[ ] [38]
SLOPES
[ ] [131 DRAINLINE SEPARATION
[ ] [391
STABILIZATION 09/15/2020
[ ] [141 DRAINLINE SLOPE
[ ] [151 DEPTH OF COVER
ADDITIONAL INFORMATION
[ ] (16] ELEVATION [ ABOVE / BELOW ]BM 1.00
[ ] [40]
UNOBSTRUCTED AREA
[ ] [171 SYSTEM LOCATION
[ ] [41]
STORMWATER RUNOFF
[ ] [181 DOSING PUMPS 1.00
[ ] (421
ALARMS
[ ] [191 AGGREGATE SIZE
[ ] [431
MAINTENANCE AGREEMENT
[ ] [201 AGGREGATE EXCESSIVE FINES
( ] [441
BUILDING AREA
[ ] [211 AGGREGATE DEPTH
[ ] [451
LOCATION CONFORMS WITH SITE PLAN
FILL / EXCAVATION MATERIAL
[ ] [46]
FINAL SITE GRADING
[ ] [471
CONTRACTOR MICHAEL W STUHR (ASHTO
[ ] [221 FILL AMOUNT
[ ] [48]
OTHER INFILTRATOR Quick4 Plus EQ36 LP
[ ] [231 FILL TEXTURE
[ ] [241 EXCAVATION DEPTH
ABANDONMENT
[ ] [251 AREA REPLACED
[ ] [491
TANK PUMPED 02/20/2020
[ ] [261 REPLACEMENT MATERIAL
[ ] [501
TANK CRUSHED & FILLED 02/20/2020
Comments: Comments are on page 2.
/
St. Lucie CHD DATE: 02/20/2020
CONSTRUCTION I APPROVED
DISAPPROVED Enviro ental Specialist I er A Collier (Florida Department of Heal
FINAL, SYSTEM [ APpROVED / DISAPPROVED ] : a
St. Lucie CHD DATE: 09/15/2020
Environmental Speciali
I Brian J Ingram (ENVIRONMENTAL HEALTH)
(Explanation of Violations on following page)
DH 4016, 08/09 (Obsoletes all previous editions which may
not be used)
Incorporated: 64E-6.003, FAC
Page 2 of 3
EH Database v 1.0.1 AP1431212
EID1986602
STATE OF FLORIDA
DEPARTMENT OF HEALTH
ONSITE SEWAGE TREATMENT AND DISPOSAL SYSTEM
CONSTRUCTION INSPECTION AND FINAL APPROVAL
Violation Number Comment
Comments
APPLICATION # : AP 1431212
PERMIT #:56-SF-1986602
DOCUMENT # : FI 1493753
DATE PAID:08/29/2019
FEE PAID.380.00
RECEIPT #:56-PID-4083255
New ST and filter installed. Liberty 1/3 HP dosing pump and 1090 gal dosing tank installed. 18x2 + 19x1 trench DF installed.
No violations, system ok to cover. Contractor notified on site. Needs final inspection for filled system, alarm, and final site
grading.
Final system approved. Contractor emailed final approval.
DH 4016, 08/09 (Obsoletes all previous editions which may not be used)
Incorporated: 64E-6.003, FAC Page 2 of 3
EH Database v 1.0.1 AP1431212 EID1986602