Loading...
HomeMy WebLinkAboutCompaction Test (2) Headquarters. � CP IL At ENGINEERING ; Mailing 11345 U.S. Highway 1 PO Box-78-13' 77 Orlando Sebastian, FL. 32958 SebasAV& AND TESTING Phone�lan772 589-0712 72,3 Progress Way SOIL COMPACTION REPORT C.A.#5693 . Sanford, FL. 32771 ASTM D 1557 and ASTM D 6938 KSMengineering.net DATE TESTED: April 13, 2020 KSM JOB#: 201722-1d/DJ/cv PERMIT#: 2002-0650- Detached Garage NUC# 404 2002-0649-House Addition CONTRACTOR: Carter's Concrete Construction Nuc Model: MC-1 Elite JOB LOCATION: 2711 S. 19th Street Nuc Serial#: 31404 Fort Pierce, Florida ITEM TESTED: First Lift TEST LOCATION PEN DRY MAX. DRY PERCENT OF,SAMPLE DEPTH READ DENSITY PROCTOR VALUE(P.C.F.) COMPACTION Detached Garage 6. N.E. 011 -1211 37 108.9 111.7 97.5%, 7. S.E. 40+ 109.2 97.8% 8. ,Center 40+ 106.9 95.7%. 9. S.W. 38 107.6 96.3% 10. N.W. 36 109.5 98.0% Soil Description: Brown Sand with Traces of Shell Fragments In Place Moisture: 11.3% Proctor.OptimuM Moisture: -11.4% Proctor Max. Dry Density: P.C.F. 111.7 @ Test Locations the Density& Penetrometer reading indicate the, Degree of Compaction Meets Minimum Requirement for Unstaked Foundation Disclaimer: Contractor is responsible,to maintain the tested area in the condition that .,KSM completed the indicated passed compaction test. KSM is not responsible if the tested area has been Julie E. Keller, P.E. altered from the approved inspected condition. President PE#68366 . 5/6/2020 Proudly Serving Florida since 1990