Loading...
HomeMy WebLinkAboutBuilding PlansFOUND IRON ROD W/CAP STAMPED "2391" DESCRIPTION: "LOTS 9, 10, 11, 12, 13, AND 14, BLOCK 4, OF AIRPORT INDUSTRIAL PARK, UNIT ONE, ACCORDING TO THE PLAT THEREOF AS PLAT BOOK 12, PAGE 40, OF THE PUBLIC RECORDS OF ST. LUCIE COUNTY, FLORIDA." SAID LANDS LYING AND BEING IN ST. LUCIE COUNTY, FLORIDA. FOUND PK NAIL W/BRASS TAB STAMPED "CARTER ASSOC." I FOUND IRON ROD WITH' PLAS77C CAP STAMPED "CARTER ASSOC." FOUND IRON ROD WITH FOUND IRON ROD WITH PI ACTIC CAP (ZTAAJPF'n FOUND IRON ROD W/CAP h m STAAAPFi7 IND UAS TRIAL AVENUE TWOFOUND OD STAMPED 02 91" W/CAP FOUND PK NAIL WITH WASHER STAMPED "2391" (8 O' RIGHT — OF — WA Y) 15' OVAL RCP IBM EL 20.6T N. INV. 17.3' S. INV. 17.3' i FOUND PK NAIL W/BRASS TAB STAMPED "CARTER ASSOC. " IBM EL. 20.16' FOUND IRON ROD W/CAP STAMPED "2391" FOUND PK NAIL WITH WASHER STAMPED 72391" T BM EL. 19.09' LEGEND: — = OVER HEAD UTILITIES — CHE CHAIN LINK FENCE c = UTILITY POLE ANCHOR co. = WOOD POWER POLE Os = SANITARY MANHOLE ® = LIFT STATION ❑ = OVERFLOW STRUCTURE = WATER VALVE ® = WELL ® = WATER METER Is = FIRE HYDRANT = CONCRETE x ` = DENOTES ELEVATION (TYPICAL) EL. = ELEVATION INV. = INVERT CONC. = CONCRETE W/ = KITH A/C = AIR CONDITION BLDG. = BUILDING PVM'T = PAVEMENT t = PLUS OR MINUS R = RADIUS T = TANGENT L = LENGTH 0 — DELTA ASSOC. = ASSOCIATES (P) = PLAT (0) = OBSERVED F. F. ELEV. — FINISHED FLOOR ELEVATION BFP = BACK FLOW PREVENTER CMP = CORRUGATED METAL PIPE RCP = REINFORCED CONCRETE PIPE W/CONC = WITH CONCRETE ENDS (4'X4') W/ME = WITH MITERED ENDS GENERAL NOTES: 1.) THIS SURVEY IS NOT VAUD UNLESS SIGNED AND - M E BOSSED BY THE SURVEYOR'S SEAL. 2.) NO SEARCH OF THE PUBLIC RECORDS WAS MADE BY THIS OFFICE FOR EASEMENTS, RESERVATIONS, ABANDONMENTS, RESTRICTIONS AND/OR RIGHTS —OF —WAY. 3.) NO FOUNDATIONS OR UNDERGROUND UTILITIES HAVE BEEN LOCATED PER THIS SURVEY. 4.) BEARINGS SHOWN ARE BASED UPON AN ASSUMED BEARING OF SOUTH 89'30'01" WEST ALONG THE SOUTH LINE OF LOTS 10 AND 11, BLOCK 4, AIRPORT INDUSTRIAL PARK, UNIT ONE. 5.) DESCRIPTION PER COLLINS, BROWN AND CALDWELL, CHARTERED. NO ABSTRACT OR TITLE COMMITMENT WAS FURNISHED TO THIS SURVEYOR OR FIRM. 6.) ELEVATIONS BASED ON NATIONAL GEODETIC VERTICAL DATUM OF 1929. ELEVATIONS BASED ON CLOSED LEVEL LOOP RUN FROM U.S.C.&G.S. MONUMENT STAMPED "Y 230 1965" PUBLISHED ELEVATION: 20.44' (NGVD '29) 7.) TEMPORARY BENCH MARKS (TBM) AS SHOWN HEREON. 8.) SURVEY FIELD WORK COMPLETED ON FEBRUARY 18, 1998. CERTIFIED TO: BARNETT BANK, N.A. MAVERICK BOAT COMPANY, INC. d/b/a HEWES MANUFACTURING COMPANY, INC. COMMONWEALTH LAND TITLE INSURANCE COMPANY DEAN, MEAD & MINTON y 27t9 NnYo 7 2 98 gECFR S. CUCCURESE, P.S.M. DATE: FL. REGI AT10N #4765 Q FLOOD ZONE: ZONE "X" (OUTSIDE 500 YEAR FLOOD) FEMA MAP # 12111CO175 F PANEL # 120285 0175 F ST. LUCIE COUNTY, FLORIDA REF: 94-484S, 14196 C, 508-49+, 9/14/94 CARTER ASSOCIATES L.B. #205 �I tp Or', w Qz� CARTER ASSOCIATES INC. m a CONSULTING ENGINEERS AND LAND SURVEYORS n doow O 1708 21ST STREET 561-562-4191 TEL (FAX) m VERO BEACH, FWRWA 32960-3472 561-582-7180 `J !- W o z BOUNDARY, IMPROVEMENT ow AND TOPOGRAPHIC SURVEY a LOTS 9-14, BLOCK 4, ^000 Z m AIRPORT INDUSTRIAL PARK, UNIT ONE MAVERICK BOAT COMPANY, INC. W�, I` O DATE DWG BY H. SCALE V. SCALE PROJ, NO. SHT, 1 OF 1 WE W W 2/23/98 DEL JAPP'DBY FSC 1'=40' N/A 98-1575 DWG, No, 15080 C NORTH ELEVATION 1/8, - I'-0' 12" P(LATERAL) `0 Q P(YE IT) 2 TON MONORAIL SEE PLAN Ifl Lw v a F ROLLUP DOOR5 R1610 FRAME PLATER�) , Ado yG� 2 TON MONORAIL RVERT) 5EE PLAN BUILDING CF2055 &ECTION >:.,` ..... �METBL BLD6. MANUF. NOTE .:•; 15 ..HE ACCORDANCE w/ 5GA , w/ THE F MINIMUM PE516N LOADS PII(VERT) = 41004 P----- (LATERAL) = 9004 P / (LON6ITUDINAL) = 4004 3" CLEAR - REGE55 SLAB EDGE AS REQ'D /-® OVER HEAD DOOR5 v v 4 NOTE CONNECT NEW ELECTRICAL GIRCUIT5 12'-0` GON5TRUGTION BLDG. TO EXIST. 200 AMP PANEL -G , s 1 1/2' x 1 112" RECESS NEW EXIST. - YR. ALL SIDES V r---- --� r i r--------- ITE I -- v, TE �� _ TE I FI 1 O• FI 3-0 x7-0 I O o PANEL -` 45 HAIRPIN .DOOR _ -D w/ 3' 0" (TYP) w i I F2 0 -- FOUNDATION SCHEDULE MARK 51ZE D x W x L REINFORCING REMARKS TE 1 16 x 20" X GONT. 2 45 CONT. TOP AND BOTTOM FI lb" x 3"-0" x 4'-0" 4 #5 LON6 HAY O T 54SHORTWAYTOP ATOM SEE PLAN F Ib x 4 -0" x 4'-O" b 45 EACH WAY .TOP AND BOTTOM AT GORNER5 x 3'-0" 4 45 E.W. TOP AND BOTTOM I� I NEW 2 TON MONORAIL EX15T. END WALL j E NOTE5: I I T0 BE MOVED 1 ,1Ga I. GOOK I NAT FO UNDATION DATION PLAN DIMENSIONS WITH LAY OUT NEW LOCATION I PLAN SUPPLIED BY METAL BUILDING MANUFACTURER ! OF EX15T. CRANE h MONORAIL 5UPPOR TIED BY DE516N V I � I GRAVITY ITY LOADS I' METAL BLD6. FRAME j LIVE H/SBC. REDUCTION ............... 20 P5F `- ....PER METAL BLD6. MANUF. 45 DOWEL ®32" O.G. DEAD ...:..... I I S.G 5.G 5.C. I EX15T. RAIL - CRANE LOA05 2 TON CAPACITY (SEE PLAN) z - EXIST. DOOR ! TO BE RELOCATED : EXIST. RIGID FRAME y TO BE RELOCATED TO NORTH END OF TO REMAIN li xb WL4M11.4 WWF a I � � � ', SLAB AN GRADE 100 PSF ! COMPACTED FILL ER ON BLD6. ADDITION ON b MIL VAPOR BARRIER i S ! WIND LOAD5 (PER S.B.G) .................no MPH ! m 4" CONCRETE SLAB w/ Fi ip I12 I f + I I ' } ! I' T/SLAB @ U-O" I I 1z' b'3 (EL. +23.52' N6VD) I - FIELD VERIFY I I CONSTRUCTION NOTES ! jr-FIELD VERIFY , I. 5TRUGTURAL DRAWIN55 SHALL BE WORKED TOGETHER WITH METAL BLD6. PLANS JI j I I I 2. CONTRACTOR SHALL VERIFY ALL DIMENSIONS IN THE FIELD AND NOTIFY t I THE ENGINEER OF ANY DISCREPANCIES PRIOR TO GONSTRUGTION, 3. THE OWNER SHALL EMPLOY AN APPROVED EN6INEERIN6 INSPECTION AND II I I TESTING LABORATORY TO MAKE ALL TESTS FOR GONGRETE, CONCRETE INSPECTION, 501L COMPACTION, STEEL FRAMIN6 INSPECTION, ETC. TO } 5L. 5.G 5.G 1 I' I . L.� :A55URE COMPLIANCE WITH ALL REQUIREMENT5 OF THESE PLANS AND 5PEGIFIGATIONS, I -LL O O I 4. THE STANDARD BUILDING CODE, 199T EDITION 15 APPLICABLE TO THIS If 1 I PROJECT. IN 30` - NEW 2 TON MONORAIL I 5. CONCRETE I MASONRY WORK SHALL BE IN AGGORDANCE WITH AN51 IIw 0AI0.9-1983 STANDARD FOR CONSTRUCTION AND DEMOLITION ' I I, a'-O" TYP: ®GORrCRs_ I ` 4`-• � • 'OPERATIONS -CONCRETE 8 MASONRY WORK -SAFETY. REQUIREMENTS. N q' �-'�._._._ ; D ' 4' 0" 45 HAIRPIN _ I� NEW MONORAIL BM SHALL LL . DOOR O" T P. w/ 4'-0" LEA (TYP) �NR�1 BE SAME AS EX15T. d SHALL FOUNDATION NOT I `r' " FI EXTEND FROM EX15T RI61D FRAME Q E`�' IF 12$ TE I �r TE I �� I. FOUNDATION I5 PL516NED BASED ON PRESUMPTIVE SAFE ALLOWABLE ---------�-- ----*-------�c------------ ----- -----� BEARING PRES -- ---- - ---- --_ LREOF2,000PSF - CONTRACTOR •-u___.e._ ____.____, _-.,w.-_ _ .____.._ .__. SHALL VERIFY THAT SOIL BRO. PRESSURE IS ACHIEVED - PRIOR TO PLAEIN6 FOOTIN65 1 112„ m REGE55 I I CONCRETE NOTES I. CONCRETE WORK SHALL BE IN ACCORDANCE WITH A.G.I. 301-b4 b'-b" 12' 0"- b'-b' b'-b' 12'-O" 6'-b" b'-b" 12'-6" b'-6 - HIGH PRE55UPE SODIUM "5PECIFIGAT10% FOR STRUCTURAL CONCRETE FOR BUILDIN65". 25'-O 25' 400H 20bV 3m 2. GONGRETE 5TREN6TH SHALL BE 3,000 P51 AT 2b DAYS, WITH 3/4" MAXIMUM A66(�EGATE AND A SLUMP OF 4"+I". TS'-O" EMEROENGY LIGHT 3. REINFORCING STEEL SHALL BE IN ACCORDANGE WITH A57M A(915-54A BATTERY PACK FEED FROM GRADE 60. I I //� LIGHT CKT. 4. WELDED WIRE PABRIG SHALL BE IN ACCORDANCE WITH A5TM AI&5-T9. FOUNE)AT I ON FLAN PRE-EN6INEERED NATAL BUILDIN6 I/8' I'-0• �- ELECTRICAL PANEL LOCATION 1, PRE-EN6INEEREC) METAL BUILDING COMPONENTS SHALL BE DESIGNED EXIT LIGHT "'"' '-"" "' "' - Tri -`.. OR ALL LOADS PRESCRIBED HEREIN. MET AL BUILDING MANUFACTURER �t-HALL COORDINATE AND SUPPORT ALL LOADS 5HI YIDE516N DOCUMENTS. 1201 �,:; .•".. _. .. '�" :",., , �,..,.,,•;I ., ,.'s..- AND ;, METAL BUILDIN® MANUFACTURER SHALL PROVIDE SHOP DRAWINGS CALCULATIONS SIGNED AND SEALED BY A FLORIDA RE615TERED NOTE ENGINEER TO 5TRUGTURAL ENGINEER PRIOR TO FABRICATION. END WALL R1610 FRAME ® LINEQ5HALL BE DE516NED *4 - T 1,• ,L I„(, - TO 511PPORT A FUTURE ADDITION OF A MINIMUM 25-0' BAY _ 3ca 3" CONDUITS (J �j� E X + ' WITH Ilea 500 rncm A coPPERi �vE 75 FT oF -�� FPUA 1200amp 3ph OOa 3ph rMFFI�C]F 150A 3p [12012,34000a PH 400a 3phMETER VSHOP 0VISC.DISC.HOP SHOP n MAIN SERVICE HOP 45KVA DING DIVISION I V2" - T/5LAE3 //10n // // / \IN b MIL VAPOR BARRIER OVER TREATED COMPACTED FILL 245 GONT. TOP I BOTTOM RUN HORIZ. BARS CONTINUOUS THRU COL. FT6. (:)SECTION SCALE: 3/4"=1'-0" 3" r2P EL PANEL B.. I.N. IGHTING POWER TYPICAL Z' CONDUIT WITH 310 COPPER WALL GIRTS 9/SETL DE516NED I FURNISHED /C �F 2 E / 8 F SB V v P /.� BY METAL BLDG.MANI. % .Z 7 O 3 H � W 6 METAL II COLUMN BY METAL BLDG. MANUF. (M B.M) CLOSURE ANGLE I ANCHOR BOLTS FURNISHED I PE51ONEP ATTACHMENT BY M.B.M. BY METAL BUILpING MANUF. I 45 HAIR PIN HOOKED AROUND COL. ANCHOR BOLTS 1 1/2' - T/ T �, • �. 1 ° b MIL VAPOR BARRIER OVER 1 b MIL VAPOR BARRIER OVER TREATED COMPACTED FILL TREATED COMPACTED FILL 3" CLEAR 245 CONT. TOP 8 BOTTOM W RUN HORIZ, 5AR5 CONTINUOUS THRU COL. FT6. CXA LE 31/�N O' 05C GTI DN ALE 3/4"=1'-O" 05" HIDE'.5AW-GUT SHALL' BE MADEAS SOON AS CONCRETE HAS HARDENED SUFFICIENTLY TO PREVENT A66REOATE BEING 0I51-01 BY SAW (4�-�D s"HGTIOI . L REVIEWED DATE PLANS' II RMIT �NAUSTBEKEP NJ08OR "a`IoEC'IC`N VVILLBE MADE /�l -if ?Z:�. 14.. ua 6 ,.._a fl M NEW EXIST. CON5TRUGTION BLDG. HALL TO BE REX15T. ENMOVED Ii GROUT REGE55 ® WALL 45xl'-5" EPDXY ANCHORED I EXIST. DOOR WAY. TO EX15T. FT6. w/ 5' bxb WI.4/WI.4 H.H.F. REINF. 1 EMBED 032" O.G �ti \ \ ° ` EXIST. BLDG. SLAB I- L ' " GLEAR ; 245 CONT. TOP I BOTTOM 2" RUN HORIZ BARS CONTINUOUS THRU COL. FT6. C.SECTION SCALE: 3/4"=I'-0" ,JilU, .. 1 r` I� F W 2 J J Z m a W 0,, z Q W N M U w z q o 0 ��"yy z 9 0 u q � � 00 z O n ww x J 0 F- LL p� z V m " N ® - U Rd � z U) W Z X u v m 0 a O U N O a LL z Cr 4 > S� L 4 •I Z O 12) Q � 00 0 m Z_ o® U J uj Lu Lu °> J z U) .,J O SHEET o� 1 17-311AA