HomeMy WebLinkAboutSLC Building PermitCode Compliance Division
2300 Virginia Avenue
Ft. Pierce, FL 34982
Phone: (772) 462-1553 Fax: (772) 462-1148
http://stiucieco.gov/ce
Issued: 02/28/2008
Conf #; 819
BUILDING PERMIT
Job Location: 4220 ROSE LN City:
Permit Type: Building (Miscellaneous)
Job Description: NEW CONSTRUCTION OF AN ATTACHED GARAGE
Subdiv:
Lot:
Block:
Owner Builder RONALD J PETERS
Permit #: SLC- 0709-0002
FORT PIERCE
i
Parcel: 2434-341-0010-000/0
Page 1
(772) 577-2552
4220 ROSE LN FORT PIERCE, FL 34982
Property Owner RONALD J PETERS (772) 577-2552
4220 ROSE LN FORT PIERCE, FL 34982-6964
Setbacks Left: Right: 10.82 Front:41.31 Rear: 19.86 Zoning: RM-11
Number of Units: 1.00 Floors: 1 Buildings: 1 Square Footage: 1,274.00
Minimum Floor Elevation: Flood Map: 28OF Flood Zone: x Elev:
Job Value: $ 47,023.34
Permit holder acknowledges through acceptance of this permit that separate permits must be obtained as required by the Florida Building Code
including those for all electric, plumbing, mechanical, roofing, and structural work. Further, he/she acknowledges responsibility to comply with all
requirements of the 2004 Florida Building Code.
NOTICE: In addition to the requirements in this permit, there may be additional restrictions applicable to this property that may be found in the
records of this County, and there may be additional permits required from.other governmental entities such as water management districts, state
agencies, or federal agencies. s:553.79(10), F.S.
WARNING TO OWNER: YOUR FAILURE TO RECORD A NOTICE OF COMMENCEMENT MAY RESULT IN YOUR PAYING TWICE FOR
BUILDING IMPROVEMENTS TO YOUR PROPERTY. IF YOU INTEND TO OBTAIN FINANCING, CONSULT WITH YOUR LENDER OR AN
ATTORNEY BEFORE RECORDING YOUR NOTICE OF COMMENCEMENT. s.713.135, F.S.
Christopher Lestrange
Building Official Date
For Automated Inspections, Call (772) 462-1261
For Questions, Call (772) 462-2172
St. Lucie County Land Development Code Section 11.05.01 (A) (2) states; Building Permits -shall expire and
become null and void if work authorized"by such Building Permit is not commenced, having called for and
received a satisfactory inspection, within six (6) months from the date of issuance of the permit, or if the
work is not completed within 18 months (permit by contractor) or 24 months (permit by owner) from the date
of issuance of the Building Permit.