Loading...
HomeMy WebLinkAboutSLC Building PermitCode Compliance Division 2300 Virginia Avenue Ft. Pierce, FL 34982 Phone: (772) 462-1553 Fax: (772) 462-1148 http://stiucieco.gov/ce Issued: 02/28/2008 Conf #; 819 BUILDING PERMIT Job Location: 4220 ROSE LN City: Permit Type: Building (Miscellaneous) Job Description: NEW CONSTRUCTION OF AN ATTACHED GARAGE Subdiv: Lot: Block: Owner Builder RONALD J PETERS Permit #: SLC- 0709-0002 FORT PIERCE i Parcel: 2434-341-0010-000/0 Page 1 (772) 577-2552 4220 ROSE LN FORT PIERCE, FL 34982 Property Owner RONALD J PETERS (772) 577-2552 4220 ROSE LN FORT PIERCE, FL 34982-6964 Setbacks Left: Right: 10.82 Front:41.31 Rear: 19.86 Zoning: RM-11 Number of Units: 1.00 Floors: 1 Buildings: 1 Square Footage: 1,274.00 Minimum Floor Elevation: Flood Map: 28OF Flood Zone: x Elev: Job Value: $ 47,023.34 Permit holder acknowledges through acceptance of this permit that separate permits must be obtained as required by the Florida Building Code including those for all electric, plumbing, mechanical, roofing, and structural work. Further, he/she acknowledges responsibility to comply with all requirements of the 2004 Florida Building Code. NOTICE: In addition to the requirements in this permit, there may be additional restrictions applicable to this property that may be found in the records of this County, and there may be additional permits required from.other governmental entities such as water management districts, state agencies, or federal agencies. s:553.79(10), F.S. WARNING TO OWNER: YOUR FAILURE TO RECORD A NOTICE OF COMMENCEMENT MAY RESULT IN YOUR PAYING TWICE FOR BUILDING IMPROVEMENTS TO YOUR PROPERTY. IF YOU INTEND TO OBTAIN FINANCING, CONSULT WITH YOUR LENDER OR AN ATTORNEY BEFORE RECORDING YOUR NOTICE OF COMMENCEMENT. s.713.135, F.S. Christopher Lestrange Building Official Date For Automated Inspections, Call (772) 462-1261 For Questions, Call (772) 462-2172 St. Lucie County Land Development Code Section 11.05.01 (A) (2) states; Building Permits -shall expire and become null and void if work authorized"by such Building Permit is not commenced, having called for and received a satisfactory inspection, within six (6) months from the date of issuance of the permit, or if the work is not completed within 18 months (permit by contractor) or 24 months (permit by owner) from the date of issuance of the Building Permit.