Loading...
HomeMy WebLinkAboutMatthews PA LetterSeptember 11th, 2020 Steve Nutt 1559 SE South Niemeyer Circle Port Saint Lucie, Florida 34952-3507 RE: FLORIDA COASTAL ROOFING 6505 Lakeland Blvd Fort Pierce, FL 34951 RE: Polyglass Elastoflex SA-V and Polyflex G HP over Dear Mr. Steve Nutt Tri-Built Ply Base This letter is in reply to a request from Mr. David Johnson, Chief Building Inspector for the St. Lucie Building Department. With the approval of your local building department, or Authority Having Jurisdiction, Polyglass takes no exception to the following installation of Polyflex G HP (4.5mm) over a previously installed membrane on the aforementioned project: • Ensure the existing membrane, in this case Tri-Built SA Ply Base, is clean, dry, and free of debris. - Once existing membrane is prepared, a new ply of Elastoflex SA V is to be installed directly over the existing base ply, and mechanically attached per local code. • Follow the Elastoflex SA V by a new layer of Polyflex G HP (4.5mm) torch applied. Should you have any further comments or concerns, please feel free to contact our Technical Services Department. Thank you for supporting Polyglass U.S.A., Inc Sincerely, Paul O'Connell South Florida Technical Representative Polyglass U.S.A. Inc. 12oconiiell(@12o]yglass.com ROOFING AND WATERPROOFING SYSTEMS 11 APOM I I I I WEST NEWPORT CENTER VLIVE. VEEREIEW BEACH, FIORWA 33442 • T: 954.2 3.133:i + PO1YGIASS.US G R u P � R o P