Loading...
HomeMy WebLinkAboutFoundation Plan' 52'-0" T-0" 5'-0" 4'-0" 16'-6" 1.5'-0" 14'-6" ANCHOR BOLTS PER #4 AT 6'. T-0" ANCHOR BOLTS PER ANCHOR BOLTS PER ANCHOR BOLTS PER GENERAL STEEL INTO SLAB GENERAL STEEL GENERAL STEEL GENERAL STEEL —---^------------ .I: 7' T-0"1INTOO TXTX16"DP I SLAB CONCRETET_#4 AT 7'-0". T-0" AT 7' 6". 3'-0" PAD W/ #5 12 INTO SLAB INTO SLAB 4' X 4' X 20" DP J O.C.EW N CONCRETE PAD 5' X V X 20" DP PAD W/ #5 92 #4 AT 8'-0". 3'-0" CONCRETE PAD O.C.EW X- " 16'-0"..LANCHOR 4 AT 7'-0". T-0" INTO SLAB #4 AT T-0". SLAB ABNTOTO SLAB T-0" INTO BOLTS PER SLAB ENERAL STEEL #4 AT V-0". T-0" INTO #4 AT 7'-0". — AWL-- f, SLAB T-0" INTO SLAB ANCHOR BOLTS PER GENERAL STEEL 4'X4'X26"DP CONCRETE o PAD W/ #5 12 FINISH FLOOR AT 22.67 FT. 5" CONCRETE O.C.EW 18" ABOVE CROWN OF ROAD SLAB DESIGN PRESSURES: 8' X T OVERHEAD DOOR PSF 32 / 43.3 #4 AT T 0". 4' X 7' OVERHEAD DOOR PSF 36 /-47.2 T-W INTO ANCHOR BOLTS PER SLAB GENERAL STEEL " T-0A NTO SLAB TX3'X16"DP CONCRETE PAD W/ #5 12 O.C.EW #4 AT T-0". 3'-W INTO 3'-0"INTO #4 AT V-0". 3'-0" SLAB SLAB #4 AT T-0% X-0" INTO SLAB 4 INTO SLAB 4' X 4' X 20" DP 3' X 3' X 16" DP CONCRETE 5' X 5' X 20" DP CONCRETE C X 4' X 30" DP PAD W/ #5 12 CONCRETE PAD CONCRETE PAD O.C.EW PAD W/ #5 12 F O.C.EW #4 AT 7'-0" X-0" #4 AT 7'-6". T-0" INTO SLAB INTO SLAB I I ANCHOR BOLTS PER GENERAL STEEL — — — — — — — — — — — — — — — — — 1' 4" ANCHOR BOLTS PER ANCHOR BOLTS PER 10'-0" GENERAL STEEL GENERAL STEEL 21'-0" 21'-0" NDATION PLAN = -1 -u ANCHOR BOLTS PER GENERAL STEEL STRUCTURES DESIGNED WITH FBC 2017 6TH EDITION & HVAC CH 16170 MPH.132 MPH VASD PER ASCE 7-10 o CH6. EXP C - 3 SEC. GUST CAT 2 BILE co y REVIEWED FOR ANCHOR BOLTS PER CO GENERAL STEEL DE COMPLIANCE ST. L. CIE COUNTY �d BOCC 4Mln I I YE�IIt 5" THICK CONCRETE SLAB .2" COVERAGE (2) #5 BARS CONT 45 BARS 12" O.C. EW