Loading...
HomeMy WebLinkAboutSubsurface InvestigationAugust 28, 2019 First Choice Renovations, Inc. 120 SE 13t' Street Pompano Beach, FL 33060 RE: Subsurface Investigation 1.00 Ac. Residential Lot 5242 Slash Pine Trail Fort Pierce, FL 34951 3931 SW 47TH Avenue, Suite 104 Davie, Fl. 33314 Tel: 954-584-6115 E-mail: ppeana@soilprobe.net A J U N 2 2 2020 .ST. Lucie County, Permitting In accordance with your request and authorization, Soilprobe Engineering & Testing, Inc. has completed subsurface exploration and geotechnical studies at the above referenced project site. We explored the general subsurface conditions in order to evaluate their suitability for supporting the anticipated construction, and to provide recommendations for site preparation and foundation design. Our work included standard penetration test (SPT) borings and engineering analyses. This report describes our explorations and tests, reports their findings, and presents our recommendations developed from the investigation. Our report has been prepared specifically for this project. It is intended for the exclusive use of First Choice Renovations, Inc. their representatives and/or assigns. Our work has used methods and procedures consistent with local foundation engineering practices. No other warranty, expressed. or implied, is made. We do not guarantee project performance in any respect, only that our work meets normal standards of professional care. We understand that the vacant land is being considered as residential site for anew one-story residence. and an auxiliary structure. At the time of our tests the site lightly wooded with scattered pine trees and mostly covered with underbrush, weeds and vines. The property configuration, locations of proposed construction and approximate locations of our soil tests are presented in the attached plot plan. The proposed house will be constructed of conventional poured in place concrete and concrete masonry unit (CMU). Bearing walls will be supported by shallow continuous and isolated footings designed for an allowable soil bearing capacity of 2,500 PSF and concrete slab placed on compacted subgrade. The auxiliary building will consist of pre-engineered steel framed structure with steel columns to be supported by isolated, spread footings designed for an allowable soil bearing capacity of 2,500 PSF. Concrete slab will be placed on grade and poured separate from foundations and columns. First Choice Renovations, Inc. Proposed Residence 5242 Slash Pine Trail August 28, 2019 Page 2 of 4 Subsurface conditions at the site were explored with three (3) engineering borings advanced to a depth of 14 feet below existing ground surface. Our representatives selected the test locations in the field within the area of proposed construction as shown in the attached location test. Samples of the in -place materials were recovered at frequent intervals with a standard 24 inches split barrel sampler driven into the ground with a 140-pound hammer falling 30 inches. This work was performed on August 21, 2019 following closely the procedures recommended in ASTM Method D-1586. Detailed subsurface conditions encountered at the locations and depth explored are presented in the attached logs. Our drillers examined the soil recovered from the SPT sampler and maintained a log for each boring. Soil samples were inspected and classified with the Unified Soil Classification System (USCS). Classifications and other pertinent data obtained from our explorations and tests are reported on the attached boring logs. Soil stratification, shown on the boring logs, is based on examination of recovered soil samples and interpretation on the driller's field logs. It indicates only the approximate boundaries between soil types: The actual transitions between the adjacent soil strata may be gradual and indistinct. Generally, the tests revealed a surfacing layer of topsoil with roots with a thickness of approx. 8-inch. Below this surfacing layer and continuing to the boring termination depth, the soil consisted of layered gray, tan and brown sand.. Standard penetration resistance, N-value, recorded during the tests, indicated soil conditions as loose in the upper 3 to 4 feet, and in a medium dense condition at deeper locations to medium dense. Groundwater measured at the time of test was found at a depth of approximately 4.00 feet below prevailing grade. Fluctuations in ground water level should be anticipated throughout the year due to seasonal variations in rainfall, drainage and other factors. The groundwater level measured at the time of test is not intended to define a limit or ensure that future seasonal fluctuations in groundwater levels will not vary from this level. We recommend that the Contractor determine the actual water table at the time of the construction to determine groundwater impact on his construction procedures. It is our opinion that the soil at the site is generally suitable to support the proposed building on conventional shallow foundations. However, compaction of the existing loose sand layers and any added fill. material is required; if they are to support the shallow foundations, in order to avoid excessive settlements that may be detrimental to the structure. The following site preparation procedures are recommended prior to the installation of the foundations or slab on grade: First Choice Renovations, Inc. Proposed Residence 5242 Slash Pine Trail August 28, 2019 Page 3 of 4 Clear and grub the proposed building area plus a perimeter of minimum five feet outside the foundation limits and any area which is to support slab on grade removing existing vegetation, roots, trees and tree roots system. The thickness of the surfacing dark sand with roots to be removed is expected to be approximately 12 inches. This clearing, stripping and grubbing shall extend a minimum 10.00 feet outside buildings perimeters. 2. Level and proof roll the building areas with a medium heavy (25-ton) vibratory roller with minimum 20 passes each direction. Any soft spots, revealed by proof rolling operation, shall be excavated and replaced with clean, compactable fill material. This proof -rolled operation shall bring the loose sandy soils to a minimum 98% of maximum dry density as determined by ASTM Method D-1557. Field density tests shall verify the achieved compaction prior placing any fill material. 3. Once the excavated building pads areas are inspected by a geotechnical engineer representative and field density tests verified for achieving minimum density of 98% the building areas may be filled to the design elevations using stockpiled material or clean imported fill material, consisting of sand or sand rock mixture, free of organic and other deleterious materials and containing not more than eight percent passing the No. 200 sieve and having rocks not larger than 3 inches. Fill material shall be tested before being delivered and used on jobsite. The fill shall be placed and compacted, in lifts not exceeding 12 inches in loose thickness, to a minimum 95% of maximum dry density. The building pads areas, prepared in accordance with the above site preparation recommendations, should be suitable to support the proposed structure on conventional shallow foundation designed for an allowable bearing capacity of 2,500 PSF. We also recommend that continuous strip and/or monolithic footings to be minimum 20 inches wide, and all isolated column footings to be at least 36 inches square Further, we recommend the use of spread footings to support the proposed bearing walls and columns with base of footings placed at a minimum 24 inches below post -construction, adjacent grades. Concrete slab may be placed on compacted subgrade poured separate from the walls and column footings (stem -wall type construction) or poured monolithically with foundations. For monolithic slab and footing design, ample consideration shall be given to the eccentric loading, foundation rotation and increased shear stress at the slab and footing interface. The yard final grading shall divert and convey storm water runoff away from foundation walls by sloping the grade away from structure in order to protect the foundation. Roof gutters also may be installed to collect, convey and discharge the water a minimum 5.00 feet from walls. Any modification to the above -recommended procedures should be approved by Soilprobe Engineering &Testing, Inc. First Choice Renovations, Inc. Proposed Residence 5242 Slash Pine Trail August 28, 2019 Page 4 of 4 Further, in order to verify compliance with these specifications and document construction procedures used and actual conditions encountered we suggest that Soilprobe Engineering & Testing, Inc. be retained to test the compacting effort on this project. This office does not accept any responsibility for any conditions that deviate from those described in this report, nor for the performance of the foundation if not engaged to provide construction observation, testing and certification for this project. Due to the fact that soils are generally, naturally deposited materials under variable conditions, it must be understood that major subsurface discontinuity may occur within short distances. It is unlikely that the tests used for this investigation revealed all subsurface conditions. Our office does not warrant or imply that the data collected on our log of borings are indicative of the subsurface features, except the locations where borings were taken. If unusual or variant conditions are found during construction, please notify this office for further evaluation and recommendation. This report represents an accurate appraisal of the site conditions upon careful interpretation of the physical data, to the extent reasonably possible. If variant or unusual soil conditions are found during construction, this office shall be notified for further testing, evaluation, and recommendation. Sincerely, G & TESTING, INC. Enc. Soil Logs SPT Appendix Plot -Plan - LOG OF BORING JOB #:.. 1 11� ' Sheet: 1 of 1 Boring: 1 Date: 8/28/19 CLIENT: First Choice Renovations, Inc. Date started: 8/21/19 PROJECT: 5242 Slash Pine Trail Fort Pierce,'FL 34951 Date completed: 8/21/19 LOCATION: 'See sketch Driller s : PP/AO/JP AZ .v 3 a DESCRIPTION: Soil type, color, texture, and consistency. . Notes on drilling conditions. 0.00 = 0'-011 Weeds, vines Dark sand, roots Dark grey sand sand . Tan reddish sand Pale tan greyish sand End of test 14'-0" 1 3 20 0'-8" 2, _0„ 3'-6" 4'-6" ' 6'-0" 7E_071 14'-0" '.°° 1 2 2.00 2 3 8 20 1Grey 3.00 4 4 4.00 5 5 11 23 5.00 5 6.00 6 9 20 24 7.00 - 10 10 8.00 11 11 21 24 9.00 10 11 10.00 11 14 32 24 11.00 16 16 12.00 17 19 38 24 13.00 20 18 14.00 18 15.00 16.00 17.00 18.00 19.00 20.00 TYPE of SAMPLE: Cohesionless Density: Cohesive Consistency: D — disturbed (2) — Penetrometer 0-10 Loose 0-4 Soft U.L.- Undist. Liner 10-30 Medium 4-8 Medium Stiff S.T.— Shelby tube 30-50 Dense 8-15 Stiff S.S. — Sample Spoon 50+ Very dense 15-30 Very Stiff R.C. —Rock Core 30+ Hard 140 Lb. WT. Hammer x 30" fall on T' sampler LOG OF BORING JOB #: Sheet: 1 of 1 Boring: 2 Date: 8/28/19 CLIENT: First Choice Renovations, Inc. Date started: 8/21/19 PROJECT: 5242 Slash Pine Trail Fort Pierce, FL 34951 Date completed: 8/21/19 LOCATION: See sketch Driller s : PP/AO/JP AZ c 3 a Y DESCRIPTION: Soil type, color, texture, and consistency. Notes on drilling conditions. 0.00 o'-o" Weeds, vines Dark grey sand Grey sand Brown dark sand Tan reddish sand Tan to greyish sand End of test 14'-0" 2 5 18 0'-6" 4'-0" 6'-6" 6'-6" 10'-0" 14'-0" 1.00 2 3 2.00 4 4 12 22 3.00 6 6 4.00 5 6 13 24 5.00 6 6.00 8 8 19 24 7.00 9 10 8.00 10 11 20 24 9.00 11 9 10.00 10 12 27 24 11.00 14 13 12.00 15 16 33 24 13.00 16 17 14.00 16 15.00 16.00 17.00 18.00 19.00 20.00 TYPE of SAMPLE: Cohesionless Density: Cohesive Consistency: D — disturbed (2) — Penetrometer 0-10 Loose 0-4 Soft U.L.- Undist. Liner 10-30 Medium 4-8 Medium Stiff S.T. — Shelby tube 30-50 Dense 8-15 Stiff S.S. — Sample Spoon 50+ Very dense 15-30 Very Stiff R.C. — Rock Core 30+ Hard 140 Lb. WT. Hammer x 30" fall on 2" sampler LOG OF BORING JOB #: Sheet: 1 of 1 Boring: 3 Date: 8/28/19 CLIENT: First Choice Renovations, Inc. Date started: 8/21/19 PROJECT: 5242 Slash Pine Trail Fort Pierce, FL 34951 Date completed: 8/21/19 LOCATION: See sketch I Driller s : PP/AO/JP aSoil DESCRIPTION: type, color, texture, and consistency. Notes on drilling conditions. 0.00 —_ 01-099 Weeds, vines Dark sand with large pieces of roots Grey sand Brown dark sand Tan reddish sand End of test 14'-0" 3 9 22 1'-011 4'-6" 6'-6" 6'-6" 14'-0" 1.00 5 4 2.00 5 4 10 22 3.00 4 6 4.00 6 5 14 24 5.00 6 8 6.00 9 16 24 ' °° 8 8 8.00 9 9 21 24 9.00 11 10 10.00 11 11 23 24 11.00 12 11 12.00 12 12 27 24 13.00 14 13 14.00 15 15.00 16.00 17.00 18.00 19.00 20.00 TYPE of SAMPLE: Cohesionless Density: Cohesive Consistency: D — disturbed (2) — Penetrometer 0-10 Loose 0-4 Soft U.L.- Undist. Liner 10-30 Medium 4-8 Medium Stiff S.T. — Shelby tube 30-50 Dense 8-15 Stiff S.S. — Sample Spoon 50+ Very dense 15-30 Very Stiff R.C. — Rock Core 30+ Hard 140 Lb. WT. Hammer x 30" fall on 2" sampler 1 inch equals feet Lot size 166.64' x 272-22' .+ ® I�k Setback from property front approx- 60-75' exact location to be determined based on somewhat existing driveway 50 t%,-MSV �,o CP-TkON SL�SI-F �� N E T IZ.A• 1l. TtALT - Ple (icE _- 3931 SW 4r Avenue Suite 104 Davie, Fl. 33314 Tel: 954-584-6115 Fax:954-584-2862 E-mail: ppeanai@soilprobe.net APPENDIX "A" SUBSURFACE EXPLORATION INFORMATION Our borings describe subsurface conditions only at the locations drilled and at the time drilled. They provide no information about subsurface conditions below the bottom of the boreholes. At locations not explored, subsurface conditions that differ from those observed in the borings may exist and should be anticipated. The groundwater depth shown on our boring logs is the water level the driller(s) observed in the borehole when it was drilled. These water levels may have been influenced by the drilling procedures. An accurate determination of groundwater level requires long-term observation of suitable monitoring wells. The absence of a groundwater level on certain logs indicates that no groundwater data is available. It does not mean that no groundwater will be encountered at that boring location. Standard Penetration Test Borings The Standard Penetration Test (SPT) is a widely accepted method of testing foundation in place. The N-value obtained from the test has been correlated empirically with various soil properties. These empirical correlations allow satisfactory estimates to be made of how the soil is likely to behave when subjected to foundation loads. Tests are usually performed in the boreholes at intervals of five feet. In addition, our Firm performs tests continuously in the interval directly below the expected foundation -bearing grade where the soil will be most highly stressed. Boreholes where SPT will be performed are drilled with a truck mounted SIIVICO 2800 drill -rig. The boreholes are advanced by rotary drilling with a winged bit that makes a hole about seven inches in diameter. After the borehole has been advanced to the depth where a SPT will be performed, the soil sampler used to run the test is attached the end of drill rods and lowered to the bottom of the borehole. The testing procedure used conforms closely to the methods recommended in ASTM D-1586. The sampler has a split -barrel 24 inches long and an outside diameter of 2.0 inches. It is driven into the ground below the bottom of the borehole using a hammer that weights 140 pounds and falls freely 30 inches. The driller records the number of hammer blows needed to advance the sampler the second and third six-inch increments. The total number of blows required to advance the sampler the second and the third six-inch increments constitutes the test results; that is N-Value at the depth. The test is completed after the sampler has been driven not more than 24 inches or when refusal is encountered, whichever occurs first. Refusal occurs when 100 hammer blows advance the sampler six inches or less. After the test is completed, the sampler is removed from the borehole and opened. The driller examines and classifies the soil recovered by the sampler. He places representative soil specimen from each test in closed jars or plastic bags and takes them to our laboratory. In the laboratory, additional evaluations and tests are performed, if needed. Jar samples are retained in our laboratory for thirty days, then discarded unless our clients request otherwise. Hand Auger Borings Hand auger borings are used if soil conditions are favorable, when the soil strata are to be determined within a shallow (approximately 6 feet) depth, or when access is not available for our truck -mounted or portable mounted drill -rigs. A three inches diameter hand bucket auger with a cutting head is simultaneously turned and pressed into the ground. The bucket auger is retrieved at approximately six inches increments and its content emptied for inspection. Sometimes posthole diggers are used, especially in the upper three feet or so. The soil samples obtained are described and representative samples put in jars or plastic bags and transported to the laboratory for further classification and testing, if necessary.