Loading...
HomeMy WebLinkAbout30 dayRequest for 30-Day Temporary Power release Date: 'U 2-1 / Za Project Address: �q Permit Number: 2-+->o z, - o, s!) &-,," 45�7- THE UNDERSIGNED HEREE3Y' REQUEST RELEASE OF ELECTRICAL POWER TO THE ABOVE PROPERTY, FOR A PERIOD NOT TO EXCEED THIRTY (30) DAYS, FOR THE PURPOSE OF AND EQUIPMENT IN PREPA TION FOR A FINAL INSPECTION. IN CONSIDERATDESCRIBED WE HEREBYION 0 ACK OWLEDGE AND AGREE AS FOLLOWS: TESTING SYSTEMS F APPROVAL OF THE 1. This temporary pc occupancy of any 2. As witness by our Including Building I 3- All conditions and i Power For Testing" '4• All requests for an the reason For the i the Final inspectior the: Stop Work Orde WE HEREBY RELEASE; AND A ALL LIAI3ILMES AND CLAIM; OF THIS TRANSACTION, INC; DISCONNECTION OF El- "r.� SIGMA CONTRACTOR WWe,release is requested for the above stated purpose only, e, other than that permitted by construction during and there will be no this time peeled. Ignatures, we hereby agree to abide by aff terms and conditions of this agreement, 1lvlSI0n P011cY, which Is Incorporated herein by reference. iquirements listed In the attached document entitled "Requirements for 30 Day lave been FUIRIfed and the premise is ready for compliance Inspection. xtenslon beyond 30 days must be made In writing to the Building official 'quest, Power may be removed from the site and/or a statingStop Work Order issued if II not been approved 'within 30 days. A Fee of $100.00 w1A be required to 11Ft ;REE TO HOLD HARMLESS, Si', LUCIE COUNTY, AND THEIR EMPLOYEES FROM OF ANY TYPE OF NATURE WHICH MAY ARISE NOW OR IN THE FUTURE OUT UDING ANY DAMAGE WHICH MAY BE INCURRED DUE TO THE CAL POWER IN THE EVENT OF VIOLATION OF THIS AGREEMENT, DATE