HomeMy WebLinkAboutInspection Docs 09-22-'20 08:58 FROM- 7728787656 T-314 P0001/0001 F-665
. ..
NO M011.
1wo
22 FaX
8' ivl Cod"', -DAYt`E'�f11ATi r0616twe
Dam: Pwra Wffnber
Projed A dress; C ��
THE UNDERSIGNED HEREBY REQUEST'RELEASE OF ELECTRICAL POWER TO THE ABOVE DESCIMM
PROPERTY,FOP,A PERIOD NOT TO FCC.EEb THIRTY(�G)BAYS, FOR THE PURPOSE OF TESTING SYSMMS
AND EQUIPMENT-IN PREPARATION FOR A.FINAL.INSPECT N. IN CONS'1 DMTION OF APPROVAL OF THE
it QL. W HMMY AQMWLEDGE AND AGRM AS FO LOi :
1. 7NS tempomry power ease is r2tiu l for ate above Gated P?� 0*,and the vM be maceupancy of any type,Mier than t1t peetrrifted by constrteon tarring this time period.
2. AS'witness by our slgrmWirs,vft hereby agr,"tfo abide by-4 terms and coddmons of this agreemerit,
Including Building Division Pblicy,Wi't 6 is in;ft&ated ttmih by reference. .
3.. All,c ond-tabris acrd requireineriz ftsbW in the afttted dacurhent entitled'Requirements for 30 Day
Power for Testing'hawa,:been Milled'arra the premise is dy for compliance insgecdon.
4. All requests for art extension beyond 36 days.muA.he:made in WrMng to the Bddding Wdal sting
the rea�od far t he mquest i qW&may be ren,oved''froin the site and`'bra Sbp Wor- Order issued.if
the lrrtal Inspection hes riot been-ipproved griffin 36'days. A�-_e of$100.00 will be required to lift
the Stop Work Order.
WE HEREBY RE[ZASE•AND.AGREETO HOLT?HAAWL S,Sl: l�U�G'C}UNTY,AND THt�R EPYit?LpYli FR+�?M
ALL LL40It ES AND.CLAIMS&ANY TYPE: NAT'61i V trH KAY ARSE NQW OR IN THE FUTUR> OUT
OF Tf-l '[RAiACTItJN,INCLU[} IG'AI�tY I3i41�IAOE 1► TC4.°MAY 8>=INCl1ItREO CLUE TO'THE
i�ISC me=- N OF kj5cl"RICin►H,.T� m T.HE'i [V.T OF ti idLi AMM OF WS AGREEM
flWHERSI i?A
.DA'TE
I:LECt CAL CONTMCMR SIGNATURE i7ATE
i
I,
i