Loading...
HomeMy WebLinkAboutHealth Dept, final approvalSTATE OF FLORIDA DEPARTMENT OF HEALTH ONSITE SEWAGE TREATMENT AND DISPOSAL SYSTEM CONSTRUCTION INSPECTION AND FINAL APPROVAL APPLICANT: Leydi Hernandez & Yeimy Cruz AGENT: PROPERTY ADDRESS: 5402 HickoryDr Fort Pierce, FL 34982 LOT: 2 BLOCK: 58 APPLICATION #:AP1420421 PERMIT #:56-SF-1969308 DOCUMENT # : FI 1495879 DATE PAID : 06/24/2019 FEE PAID:515.00 RECEIPT #:56-PID-3997079 SUBDIVISION: Indian River Estates ID#: 3402-609-0220-000-0 CHECKED [X] ITEMS ARE NOT IN COMPLIANCE WITH STATUTE OR RULE AND MUST BE CORRECTED. TANK INSTALLATION SETBACKS [ ] [01] TANK SIZE [1] 1090.00 [2] 483.00 [ ] [271 SURFACE WATER FT [ ] [021 TANK MATERIAL Polypropylene [ ] [281 DITCHES 15 FT [ ] [031 OUTLET DEVICE [ ] [291 PRIVATE WELLS FT [ ] [041 MULTI -CHAMBERED [ Y N ] [ ] [301 PUBLIC WELLS FT [ ] [051 OUTLET FILTER PolylokPL-68 [ ] 1311 IRRIGATION WELLS 64 FT [ ] [061 LEGEND 1. 70-143-11DC4 2. 70-143-54SC4 [ ] [321 POTABLE WATER 43 FT [ ] [071 WATERTIGHT [ ] [33] BUILDING FOUNDATIONS 8 FT [ ] [081 LEVEL [ ] [341 PROPERTY LINES 5 FT [ ] [091 DEPTH TO LID [ ] [351 OTHER FT DRAINFIELD INSTALLATION FILLED / MOUND SYSTEM [ ] [10] AREA [1] 679.2 [21 SQFT [ ] [36] DRAINFIELD COVER [ ] [111 DISTRIBUTION BOX HEADER X [ ] [37] SHOULDERS [ ] [12] NUMBER OF DRAINLINES 1, 10.00 2. [ ] [38] SLOPES [ ] [13] DRAINLINE SEPARATION [ ] [39] STABILIZATION 09/23/2020 [ ] [14] DRAINLINE SLOPE [ ] [151 DEPTH OF COVER ADDITIONAL INFORMATION [ ] [16] ELEVATION [ ABOVE / BELOW ]BM 5.00 [ ] [401 UNOBSTRUCTED AREA [ ] [17] SYSTEM LOCATION [ ] [411 STORMWATER RUNOFF [ ] [18] DOSING PUMPS 1.00 [ ] [42] ALARMS [ ] [19] AGGREGATE SIZE [ ] [43] MAINTENANCE AGREEMENT [ ] .[20] AGGREGATE EXCESSIVE FINES [ ] [44] BUILDING AREA [ ] [211 AGGREGATE DEPTH [ ] [45] LOCATION CONFORMS WITH SITE PLAN [ ] [46] FINAL SITE GRADING FILL / EXCAVATION MATERIAL [ ] [47] CONTRACTOR Abner Leyva (Leyva Plumbing [ ] [22] FILL AMOUNT [ ] [48] OTHER INFILTRATOR Quick4 Plus EQ36 LP [ ] [23] FILL TEXTURE [ ] [24] EXCAVATION DEPTH ABANDONMENT [ ] [25] AREA REPLACED [ ] [491 TANK PUMPED [ ] [261 REPLACEMENT MATERIAL [ ] [501 TANK CRUSHED & FILLED Comments: Comments are on page 2. / St. Lucie CHD DATE: 06/16/2020 CONSTRUCTION [ APPROVED DISAPPROVED ] ' Environ ental Specialis Brian J Ingram (ENVIRONMENTAL HEALTH) FINAL, SYSTEM [ APPROVED / DISAPPROVED ]: -~ St. Lucie CHD DATE: 09/23/2020 Environmental Speci I' t II Brian J Ingram (ENVIRONMENTAL HEALTH) (Explanation of Violations on following page) DH 4016, 08/09 (Obsoletes all previous editions which may not be used) Incorporated: 64E-6.003, FAC Page 2 of 3 EH Database v 1.0.1 AP1420421 EID1969308 STATE OF FLORIDA DEPARTMENT OF HEALTH ONSITE SEWAGE TREATMENT AND DISPOSAL SYSTEM CONSTRUCTION INSPECTION AND FINAL APPROVAL Violation Number Comment Comments APPLICATION #:AP1420421 PERMIT #:56-SF-1969308 DOCUMENT # : FI 1495879 DATE PAID : 06/24/2019 FEE PAID.515.00 RECEIPT #:56-PID-3997079 The system is sized for 4 bedrooms with a maximum occupancy of 8 persons (2 per bedroom), for a total estimated flow of 400 gpd. New ST, filter, and 10x6 long BED DF installed. No violations, system ok to cover. Contractor notified onsite. System appears to be installed as a filled system. Hold final for filled system and final site grading. Final system approved. Contractor and building department emailed final approval. DH 4016, 08/09 (Obsoletes all previous editions which may not be used) Incorporated: 64E-6.003, FAC Page 2 of 3 EH Database v 1.0.1 AP1420421 EID1969308