Loading...
HomeMy WebLinkAboutCompaction testHeadquarters 11345 U.S. Highway 1 Sebastian, FL. 32958 Orlando 723 Progress Way Sanford, FL. 32771 DATE TESTED: PERMIT #: T&P CP 1 f ENGINEERING Z%&JAVA AND TESTING SOIL COMPACTION REPORT ASTM D 1557 and ASTM D 2922 December 27, 2019 19100700 Mailing PO Box 78-1377 Sebastian, FL. 32978 Phone: 772-589-0712 C.A.# 5693 KSMengineering.net KSM JOB #: 195216-1d/MH/jo CONTRACTOR: Wynne Development JOB LOCATION: 7 SE Jasmine Lane Spanish Lakes 1 Port St Lucie, Florida ITEM TESTED: Compacted Foundation Fill TEST LOCATION PEN DRY MAX. DRY PERCENT DEPTH OF SAMPLE READ DENSITY PROCTOR VALUE (P.C.F) COMPACTION 1. S.W. 0" - 12" 50 107.5 111.3 96.6% 2. N.W. 108.4 97.4% 3. Center 109.0 97.9% 4. S.E. 107.6 96.7% 5. N.E. " 108.0 97.0% 113.0 T W E I I I I I I Soil Description: I I I I 1 I I Brown Sand G 112.0 �..—..I—..—.i—..—i.—..—i.—.. �..—.._ H T I I I I I I In Place Moisture: I I I I I 9.3 % P 111.0 Optimum Moisture: I I I I I 12.0% 110.0 ..—.� _.�._..—�.—..—�.. .. �..—.._ F I I I I I Max. Dry Density: P.C.F. I I I I I I 111.3 1—..—I.—..—I..—.. D109.0—..—.j ...... ..—.._ @ Test Locations The R I 1 I I I I Density & Penetrometer Y 1 I I I I I Readings Indicate the 108.0 Degree of Compaction Meets 9 10 11 12 13 14 15 Minimum Required for Staked Foundation Moisture - % of Dry Weight ,yti1i:!tt9iif'F[ �R�Sec# yi3" Disclaimer: Contractor is responsible to maintain e` r the tested area in the condition that KSM completed the indicated passed compaction test. KSM is not responsible if the tested area has been taa alike, P,;E,�7 a altered from the approved inspected condition. a 12/30/2019 Emaifto<f LzicBuilding Department Proudly Serving Florida since 1990