Loading...
HomeMy WebLinkAboutCompaction test (2) Headquarters IV C Sk t ENGINEERING PO Box 78-11377 11345 U.S. Highway 1 78 Orlando Sebastian, FL. 32958 ,« jrjl AND TESTING Sebastian, FL.Phone: 772-589-0712 723 Progress Way SOIL COMPACTION REPORT C.A.#5693 Sanford, FL. 32771 ASTM D 1557 and ASTM D 6938 KSMengineering.net DATE TESTED: March 11, 2020 KSM JOB#: 201206-1d/DJ/jo PERMIT#: 1910-0402 NUC# 404 RECENED CONTRACTOR: ACD Builders SEP 2 4 2020 Nuc Model: MC-1 Elite JOB LOCATION: 7106 Banyan Street Department Nuc Serial#: 31404 Fort Pierce, Florida Perm`ttinga Countv ITEM TESTED: Compacted Foundation Fill-1st&2nd Lift TEST LOCATION DEPTH PEN DRY MAX. DRY PERCENT OF SAMPLE READ DENSITY PROCTOR VALUE (P.C.F) COMPACTION 1. S.W. 1211 - 2411 40+ 111.4 112.9 98.7% 2. N.W. " 40+ 110.8 98.1% 3. Center 40+ 112.6 99.7% 4. N.E. 40+ 111.0 98.3% 5. S.E. 011 - 1211 40+ 108.7 96.3% 6. Center 40+ 109.2 96.7% Soil Description: Brown Sand with Clay 114.0 - I I I I I I W In Place Moisture: E I I I I I 9.8% G H 113.0 t- .I.—..J..—.. —.�—.._�.—..- Proctor Optimum Moisture: I I I I I 11.0% T I 112.0 i..—.I.—.. ..—..fi..— —..—I.—.._ Proctor Max. Dry Density: P.C.F. P I I I I I 112.9 C 111.0 @ Test Locations the Density& I I I I I Penetrometer readings indicate the F Degree of Compaction Meets . 110.0 T - Minimum Required D I I I I I for Unstaked Foundation R I I I I I Y 109.0 -..—.;.—..�..—..T..—.;—..—;.—..� Respectfully Submitted: 8 9 10 11 12 13 14 ,,,111111/If1��i ��` �, K •�, Moisture-% of Dry Weight �` ;•'�,10ElVS �,A: Disclaimer: Contractor is responsible to maintain No. 58366 the tested area in the condition that KSM t % completed the indicated passed compaction test. 'b S KSM is not responsible if the tested area has been ' T'� • vO altered from the approved inspected condition. RI r•. residenf' PE#68366 3/12/2020 Email to: St Lucie Building Department; dtroska@comcast.net Proudly Serving Florida since 1990