Loading...
HomeMy WebLinkAboutdensity reportPROJECT: r „ PROJECT #: Q� CLIENT: CONTACT: ARRIVAL TIME: 1 �� `�� r<'�w► ON SITE TIME: � %.� EQUIPMENT CHARGE: SCOPE OF FIELD WORK: DEPARTURE TIME TRAVEL TIME: TRAVEL CHARGE: GENERAL DATE: WEATHER: /�� .� � )f� �� C� LAB TIME: MILEAGE: As requested, a Universal Engineering Technician was present at the above referenced location for the purpose of EARTHWORK �_, As requested, a Universal Engineering Technician was present at the above referenced location for the purpose of Earthwork Testing for the As requested, the technician observed the general condition of the areas) to be tested and performed � soil density test(s). All tests) were performed in accordance with th_e nucl''�-ear -auger /drive sleeve /sand cone) method and were found to ee � not meet /pending proctor) the project compaction requirements of ��r % of the maximum dry density per �1/ D698) (AASHTO T-180 / T-99) (with the exception of test numbers) `�'=� that failed to meet the project compaction requirements due to CONCRETE /GROUT /MORTAR As requested, a Universal Engineering Technician was present at the above referenced location for the purpose of (Concrete /Grout /Mortar) (Monitoring /Testing) for the While on site, the technician observed the general condition of the areas) to be tested and cast sets of (cylinders /beams /prisms / cubes) for (compressive /flexural strength) testing. The (concrete /grout /mortar) (tested /observed) on this day was found to be in accordance with the project plans and specifications with regard to batch time, temperature and slump (with the exception of the concrete batch referenced by ticket number ,which was found to exceed tolerance for Universal Engineering Sciences, Inc. 820 Brevard Avenue Rockledge, FL 32955 321.638.0808 phone 321.638.0978 fax ON SITE TIME: LESS #SETS X 1 HR: LESS # IPDS X .25 HR: STAND BY TIME: BILLING: TECHNICIAN: ��<dJ�H' L�,yP,f�l CONTACT: