HomeMy WebLinkAboutTermite Treatment St Lucie County Inspections
2300 Virginia Avenue
Ft Pierce, FL 34982
081 , (722) 462-2172
CERTIFICATE OF TERMITE TREATMENT_
CONSTRUCTION SOIL TREATMENT
PERMIT# 1 �J f Q JOB ADDRESS 5613 Palm Dr, Fort Pierce, FL 34982-7584
BUILDER Adams Homes South
PEST CONTROL CONTRACTOR HomeTeam Pest Defense, Inc.
PEST CONTROL LICENSE# JF0001886
We,the undersigned,hereby certify that we have pretreated the above-described construction for
subterranean termites in accordance with the standards of the National Pest Control Association.
Square feet of area treated: Chemicals used: Bora-Care
Percentage of solution: .23 Total gallons used: 4
Date of treatment: 07/10/20 Time of treatment: AM
® FOOtIII FBC104.2.6 Certificate of Protective Tlreatmentforprevention of termites.
Footing A weather resistant jobsite posting board shall be provided to receive
® 1 st Treatment duplicate Treatment Certificates as each required protective treatment is
C Re-treat completed,providing a copy for the person the poermit is iisued to and '
another copy for the building permit files. The Treatment Certficate shall
F1 Slab provide the product used, identity of the applicator, time and date of the
I— 1st Treatment treatment,site location, area treated, chemical used,percent concentration
and number ofgallons used, to establish a verifiable record ofprotective
I—Re-treat treatment. If the soil chemical barrier method for termite prevention is used,
1-1 Driveway final exterior treatment shall be completed prior to final building approval.
I- 1 A Treatment St Lucie County requires for the final inspection for CO,a Permanent
C Re-treat Sticker to be placed on the electrical panel bog cover,listing all the
M Pools treatments and dates of applications.
1- 1 st Treatment
C Re-treat
1-1 Other Signature of exterminator
F st Treatment
.F Re-treat
F1 Perimeter for Final Inspection
NOTE.-There must be a completed form for each required treatment or re-treatment and this form must be on
the job site to be picked up by the inspector at time of each inspection or the scheduled inspection will