Loading...
HomeMy WebLinkAboutTermite Treatment St.Lucie,County Inspections 2300 Virginia Avenue Ft Pierce, FL 34982 , (722) 462-2172 CERTIFICATE OF TERNIITE TREATMENT CONSTRUCTION SOIL TREATMENT PERMIT# go. 0+,3 7 JOB ADDRESS 5705 Cassia Dr,Fort Pierce,FL 34982-3787 BUILDER Adams Homes South PEST CONTROL CONTRACTOR HomeTeam Pest Defense, Inc. PEST CONTROL LICENSE# JF0001886 We,the undersigned,hereby certify that we have pretreated the above-described construction for subterranean termites in accordance with the standards of the National Pest Control Association. Square feet of area treated: 220 Chemicals used: Bora-Care ,Percentage of solution: .50% Total gallons used: Date of treatment: 05/19/20 Time of treatment: AM FBC104.2.6 Certificate of Protective Treatment for prevention of termites. 0 Footing A weather resistant jobsite posting board shall be provided to receive Z 1 st Treatment -duplicate Treatment Certificates as each required protective treatment is ❑Re-treat completed,providing a copy for the person the poermit is iisued to and another copy for the building permit files. The Treatment Certficate shall ❑ Slab provide the product used, identity of the applicator, time and date of the 1st Treatment treatment,site location, area treated, chemical used,percent concentration and number ofgallons used, to establish a verifiable record ofprotective ❑Re-treat treatment. If the soil chemical barrier method for termite prevention is used, ❑ Driveway final exterior treatment shall be completed prior to final building approval. ❑ 1st Treatment St Lucie County requires for the final inspection for CO,a Permanent ❑Re-treat Sticker to be placed on the electrical panel bog cover,listing all the ❑ Pools treatments and dates of applications. ❑ 1 st Treatment ❑Re-treat ❑Other Signature'of exterminator ❑ 1st Treatment ❑Re-treat 0 Perimeter for Final Inspection NOTE:There must be a completed form for each required treatment or re-treatment and this form must be on the job site to be picked up by the inspector at time of each inspection or the scheduled inspection will