Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
Termite Treatment
��� i✓,y� St Lucie County Inspections 2300 Virginia Avenue Ft Pierce, FL 34982 OR / (722) 462-2172 CERTIFICATE OF TERIVHTE TREATMENT CONSTRUCTION SOIL TREATMENT PERMIT# a ®� � JOB ADDRESS 5810 Tangelo Dr, Fort Pierce, FL 34982-8606 BUILDER Adams Homes South PEST CONTROL CONTRACTOR HomeTeam Pest Defense, Inc. PEST CONTROL LICENSE# JF0001886 We,the undersigned,hereby certify that we have pretreated the above-described construction for subterranean termites in accordance with the standards of the National Pest Control Association. Square feet of area treated: 220 Chemicals used: Bora-Care Percentage of solution: .50% Total gallons used: 4 Date of treatment: 05/15/20 Time of treatment: AM © FOOt1II FBC104.2.6 Certificate of Protective Treatment for prevention of termites. Footing A weather resistant jobsite posting board shall be provided to receive . Z 1st Treatment duplicate Treatment Certificates as each required protective treatment is ❑Re-treat completed,providing a copy for the person the poermit is iisued to and another copy for the building permit files. The Treatment Cerificate shall ❑ Slab provide the product used, identity of the applicator, time and date of the ❑ 1st Treatment treatment,site location, area treated, chemical used,percent concentration and number ofgallons used, to establish a verifiable record ofprotective ❑Re-treat treatment. If the soil chemical barrier method for termite prevention is used, ❑ Driveway final exterior treatment shall be completed prior to final building approval. ❑ 1st Treatment St Lucie County requires for the final inspection for CO,a Permanent ❑Re-treat Sticker to be placed on the electrical panel box cover,listing all the ❑ Pools treatments and dates of applications. ❑ 1st Treatment ❑Re-treat ❑Other Signature of exterminator ❑ 1st Treatment ❑Re-treat 0 Perimeter for Final Inspection NOTE.There must be a completed form for each required treatment or re-treatment and this form must be on the job site to be picked up by the inspector at time of each inspection or the scheduled inspection will