Loading...
HomeMy WebLinkAbout30 day power release 09-28-'20 09:46 FROM- 7728787656 T-339 P0001/0001 F-695 ptuen 23 Bi<1�l�t'1�•1� ic�e:`� it���:i�ir�•�HX�i'ii�i�i>�1 77i-462-191" Fair772=462=61443 Peoikv e"106day--veti#.d.ir� :PdWd rRttease DAM Penvit-IMMber. THE UNDERSIGNED HEREBY REQU25r RELEASE OF ELf;CTfi OkL POWER TO THE ABOUT DESCRIBED PROPERTY,FOR A P010D NOT TQ EXCEED T14JRTY;30)DAYS,FOP,THE PUP-POSE OFTEMG SYSTEMS AND E , )PMENT IN PREPARATION-FOR A FINAL.MSP•ECIZON. VY CONMERA7 ON OF APPROVAL OF THE RE�i "WE liACKNOW'MGE•ANb AGrAEE'AS•FdLLOWS: 1. This; racy polder T1 P3sE?is 1 eguested for.the above stated purpose oMy,and tI p_m vAH be no aWcupancy of any type,otEi than fiat perrnittad by mon dWhq this lime period. 2. AS'wiine55 by our sl raves,v+ie.her by agr 4 tb abide by-40 terms and coridltions of this agreement, lnciuding Building Division Policy,which is•ineorp6Mted h6r4h hy ref=erence. 3. All oond-iiiions:and mquireibents b'ted'in the attached document entitled"Requirements for 3b bay Power for Testings have-.been RdAtk and the premiss a is ready for compftnee,inspection. 4. Ali r tests for aft ekba-ri ion beygnd 30 days•mom be:M&in w6tit ;to the Building'.Offidal•sra'dng the reason for tyre request. PaiWet may be removed from the site.andV6r a Stop'tli/.ark Order issued.if the Final inspection has not been approved Within 30'days. A fee of$100.00 wtii kJe required W lift the Stop Work Order. WS HEREBY RELEASE-AND AGW TO MOLD.HOW S,sT,LuaE COUNTY,AND THE R EMPLPYM FROM ALL L L.MES AND.CLAIMS OF ANY TYPE OF[STATURE 1Ef�HTCH MAY AME Nd1N OR 3�1('1'HE FU"i7JRE OUT. OF TRA VSA QIV,INCCU!?IiVG Any T Ai IP�C�i=1t131Iirfl:MAY sE TNajk.Pk i pUE T4'TKE mmNNEcUON of zmmcmck Pom zN Tm;EvEw or-via#m+OF THIS AGREEm OWNf R:S1CNATUR DATE N• a1u'[ C7 R� DATE FL C 61_CONfM MR SIGMA RE DATE'