Loading...
HomeMy WebLinkAboutTermite Treatment 06/22/2020 17:50 770 JMGM PAGE 05 Z 00 Virginia Ave PO Pierce, P!34982 772-462- 172 l=ax.772-462-6443 CtRTIFICATE F TERMITE TREATMENT CONSTRUCTION SOIL TREATMENT PERMIT JOB A DRESS: BUILDER/CONTRACTOR; PEST CONTROL CONTRACTO PEST CONTROL LICA NSE #: —7-F-5- We, the undersigned, hereby certify that we have pretreated the above described construction for subterranean termites in actordance with the s andards of the National Pest control Association. Square feet if area treated: (� ;z4 nCL �,,.,. Chemicals used; i Percentage of solution: n CD Total gallons used: �b Date of Treatment: Time of Treatment: `� : Q ,% Footing Z Slab �.10 Treatment 11'Treatment Re-Treat - Re-Treat ____,Driveway -Pools . 1'Treatinent 1t Treatment* _. Re-Treat _ t _.__,_Other qimete -for Inspection 1 Treatment Re-Treat Signaturg oHWrmlnator Note: There lml$t be a completed farm for each req iced treatmcnforre-treatment and this farm must be on Me jour Site to be picked up by the irkspector at time of each nspection or the scheduled Inspection will fall and a re-lnspecrIon fee charged FBC104.2.6 Certificate of Pltotecrp a 7Matment for t'evention of termites. A weather resistant fobsite posting board shall be provided to recelve duplicate Treatment Cert fcates as each Lrequinad protective treatment is Completed, providing a copy for the person.the permit Is issued and another copy for the bullding permit!Flea The Treatment Certificate shall PMOde the product used, ldentiry of he applicator, time end date of the treatment s/te location, area treated, chemical used, percont concentration and n4 tuber of gallons used, to establish a verifiable record of protective treatment. If the soil chemical barrier me od for termite prevention is used, Anal exterior treatment shall be completed prior to final building approval, St Lucie County required for the final inspection for CO, a Permanent Sticker to be placed On anal bnyicnver Hating all the tra tmants and dates of applications.