Loading...
HomeMy WebLinkAboutcert termiteSt Lucie County inspections 2300 Virginia Avenue Ft Pierce, FL 34982 (722) 462-2172 CERTIFICATE OF TERMITE TREATMENT CONSTRUCTION SOIL TREATMENT PE[ZNUT # 200- Qt9JOB ADDRESS 5313 Birch Dr, Fort Pierce, FL 34982-4805 BUILDER Adams Homes South PEST CONTROL CONTRACTOR HomeTeam Pest Defense, Inc. PEST CONTROL LICENSE # JF0001886 We, the undersigned, hereby certify that we have pretreated the above -described construction for subterranean termites in accordance with the standards of the National Pest Control Association. Square feet of area treated: 220 Percentage of solution: .50% Date of treatment: 09/28/20 ❑ Footing ❑ I st Treatment ❑ Re -treat ❑ Slab ❑ 1 st Treatment ❑ Re -treat ❑ Driveway ❑ 1 st Treatment ❑ Re -treat ❑ Pools ❑ 1 st Treatment ❑ Re -treat ® other ❑ 1st Treatment ❑ Re -treat Chemicals used: Bora-Care Total gallons used: 4 Time of treatment: AM FBC104.2.6 CertiftcateofProtective Trealmentforpreventiun oft"Mites A weather resistant jobsite posting board shall be provided to receive duplicate YY earment Certificates as each required protective treatment is completed, providing a copy for the person the poermit is iisued to and another copy for the building permit files. The Treatment Certftcate shall provide the product used, identity of the applicator, time and date of the treatment, site location, area treated, chemical used, percent concentration and number of gallons used, to establish a verifiable record of protective treatment. If the soil chemical barrier method for termite prevention is used, final exterior treatment shall be completed prior to final building approval. St Lucie County requires for the final Inspection for CO, a Permanent Sticker to be placed on the electrical panel box cover, listing all the treatments and dates of applications. ® Perimeter for Final Inspection Signature of exterminator NOTE: There must be a completed form for each required treatment or re -treatment and this form must be on the job site to be picked up by the inspector at time of each inspection or the scheduled inspecdon will fail and a re -inspection fee charged