Loading...
HomeMy WebLinkAboutFBC Energy Conservation CodeDate: 12 J —7 / 1 -1 Contractor: Construction: ❑ Post Construction Test Planning & Development Services Building & Code Regulation Division 2300 Virginia Ave, Rm 201 Fort Pierce, FL 34982 772-462-2165 Fax 772-462-6443 FBC ENERGY CONSERVATION CODE Duct Sealing Certification Prescriptive and Performance Method Permit #: _ l as 5" 0 54s- 52,24 0 OFC RFc�2Fo �Gc`9��Ad coo ��Q'r Lot #: Address: Stu o f2akj�cq� Wrc C:�c ❑ Rough -in Test Test Conditions: Date: 1 C( Floor Area (ft2): `( 5 Time: Primary Location of Supply Ductwork Indoor Temperature (F): Primary Location of Return Ductwork NEC — Outdoor Temperature (F): S Total Leakage Test (Outside) Duct Leakage: efault ❑ Prop. Leak Free ❑ Proposed On = Test Pressure: (Pa) Baseline Duct Pressure (optional) (Pa) Duct Press. (Pa) Flow Ring Fan Press Flow (cfm) Results: ass ❑ Fail Installed Pa Total Leakage (cfm): �d Total Leakage per 100 sgft: e5 CFM25 x 100 divided by the CFA = Duct Leakage CFM/100 sqft. Testing Company Company Name: DEG-- Q _Il Address: I I hereby certify that the above Duct Sealing Leakage results demonstrate compliance with 6th Edition FBC Energy Conservation requirements in accordance with Section R403.2.2.�i / Signature: / J ^IL�% �` Printed Name:_0 � y3a\mla� License/Certificate #: l l 5 1137 -