HomeMy WebLinkAboutFBC Energy Conservation CodeDate: 12 J —7 / 1 -1
Contractor:
Construction: ❑ Post Construction Test
Planning & Development Services
Building & Code Regulation Division
2300 Virginia Ave, Rm 201
Fort Pierce, FL 34982
772-462-2165 Fax 772-462-6443
FBC ENERGY CONSERVATION CODE
Duct Sealing Certification
Prescriptive and Performance Method
Permit #: _ l as 5" 0 54s- 52,24 0
OFC RFc�2Fo
�Gc`9��Ad
coo ��Q'r
Lot #:
Address: Stu o f2akj�cq� Wrc C:�c
❑ Rough -in Test
Test Conditions:
Date: 1 C( Floor Area (ft2): `( 5
Time: Primary Location of Supply Ductwork
Indoor Temperature (F): Primary Location of Return Ductwork
NEC —
Outdoor Temperature (F): S
Total Leakage Test (Outside)
Duct Leakage: efault ❑ Prop. Leak Free ❑ Proposed On =
Test Pressure: (Pa)
Baseline Duct Pressure (optional) (Pa)
Duct Press. (Pa) Flow Ring Fan Press Flow (cfm) Results: ass ❑ Fail
Installed Pa
Total Leakage (cfm): �d
Total Leakage per 100 sgft: e5
CFM25 x 100 divided by the CFA = Duct Leakage CFM/100 sqft.
Testing Company
Company Name: DEG-- Q _Il Address:
I
I hereby certify that the above Duct Sealing Leakage results demonstrate compliance with 6th Edition FBC Energy Conservation requirements in accordance with
Section R403.2.2.�i /
Signature: / J ^IL�% �`
Printed Name:_0 � y3a\mla� License/Certificate #: l l 5 1137 -