HomeMy WebLinkAboutEnergy CodeFORM R405-2017
FLORIDA ENERGY EFFICIENCY CODE FOR BUILDING CONSTRUCTION
Florida Department of Business and Professional Regulation - Residential Performance Method
Project Name: THE GRAND CARLTON IMPACT
Builder Name: WYNNE BUILDING COPR.
11WY--NNF,
Street: �9���\
Permit Office: ST. LUCIE COUNTY
City, State, Zip: FT. PIERCE, FL,
Permit Number:
Owner: WYNNE BUILDING CROP
Jurisdiction: ST. LUCIE COUNTY
Design Location: FL, Fort Pierce
County: St. Lucie (Florida Climate Zone 2 )
1. New construction or existing New (From Plans)
9. Wall Types (1442.0 soft.)
Insulation Area
2. Single family or multiple family Single-family
a. Concrete Block - Int Insul, Exterior
R=4.1 1250.00 ft2
b. Frame - Wood, Adjacent
R=11.0 192.00 ft2
3. Number of units, if multiple family 1
c. N/A
R= ft2
4. Number of Bedrooms 2
d. N/A
R= ft2
5. Is this a worst case? Yes
10. Ceiling Types (1476.0 sqft.)
Insulation Area .
a. Under Attic (Vented)
R=30.0 1446.00 ft2
6. Conditioned floor area above grade (ft2) 1446
b. Knee Wall (Vented)
R=19.0 30.00 ft2
Conditioned floor area below grade (ft2) 0
c. N/A
R= ft2
11.. Ducts
R ft2
7. Windows(141.3 sqft.) Description Area
a. Sup: Attic, Ret: Attic, AH: Attic
6 175
a. U-Factor: Sgl, U=1..04 101.25 ft2
SHGC` SHGC=0.29
b. U,Factor: Sgl, U=1.11 40.00 ft2
12. Cooling systems
kBtu/hr Efficiency
SHGC: SHGC=0.27
a. Central Unit
34.8 SEER:15,00
c. U-Factor: N/A ft2
SHGC:
13. Heating systems
kBtu/hr Efficiency .
d. U-Factor: N/A ft2
a. Electric Heat Pump
34.8 HSPF:8.50
SHGC:
Area Weighted Average:Overhang Depth: 3.832 ft.
Area Weighted Average SHGC: 0.284
14. Hot water systems
8. Floor Types (1445.5 soft.) Insulatioh Area
a. Electric
Cap: 50 gallons
a. Slab -On -Grade Edge Insulation R=0.0 1445:50 ft2
b. Conservation features
EF: 0.970
b. N/A R= ft2
None
c. N/A R= ft2
15. Credits
Pstat
Total Proposed Modified Loads: 47.47
Glass/Floor Area: 0.098
PASS
Total Baseline Loads: 48.09
I hereby certify that the plans and specifications covered by
Review of the plans andf
AN
this calculation are in compliance with the Florida Energy
specifications covered by this.
Code.
calculation indicates compliance
with the Florida Energy Code.
/f1Ef �i,; %� '�•
PREPARED RY:
Before construction is completed
DATE`. 4129,2020
this building will be inspected for
compliance with Section 553.908
1 hereby certify.that this building, as designed, is in compliance
Florida Statutes.
'
with the Florida Energy Code.,.
OWNER/:� -�
BUILDING OFFICIAL:
DATE:
DATE:
- Compliance requires certification by the air handler unit manufacturer that the air handler enclosure qualifies as
certified factory -sealed in accordance with 11403.3.2.1.
- Compliance requires an. Air: Barrier. and Insulation Inspection Checklist in accordance with R40.2.4.1.1 and this project requires an
envelope leakage test report with envelope leakage no greater than 1.00 ACH50 (R402.4.1.2).
�PY REVIEWED FOR
FILE�CE
CODE COMPLIANCE
4/21/2020 10:27 AM EnergyGauge® USA 6.0.02 (Rev. 1) - FlaRes2017 FBC 6th Edition `drr[LPlTY
i�9DMwlraO �/. Page 1 of 5
cl®VC
FORM R405-2017 INPUT -SUMMARY CHECKLIST REPORT
PROJECT
Title: WYNNE THE GRAND CARL Bedrooms: 2
Address Type:.
Street Address
Building Type- User
Conditioned Area: 1446
Lot #
Owner Name: WYNNE BUILDING CROP Total Stories: 1
Block/Subdivision:
# of Units: 1
Worst Case: Yes
PlatBook:
Builder Name: WYNNE BUILDING COPR. Rotate Angle: 180
Street:
Permit Office: ST. LUCIE COUNTY
Cross Ventilation:. No
County:
St. Lucie
Jurisdiction: ST. LUCIE COUNTY
Whole House Fan: No
City, State, Zip:
FT. PIERCE;
Family Type: Single-family.
FL,
New/Existing: New (From Plans)
Comment:
CLIMATE
/
Design Temp
Int Design Temp Heating
Design Daily Temp
�/ Design Location
TMY Site 97.5 % 2.5 %
Winter /Summer Degree Days Moisture
Range
FL, Fort Pierce FL VERO_BEACH_MUNI 39 90
70
75 299
62
Low
BLOCKS
Number Name
Area Volume
1 Entire.House
1446 11568
SPACES.
.Number Name
Area Volume Kitchen Occupants
Bedrooms
Infii ID Finished Cooled
Heated
1 BEDROOM
301 2408 No 0
1
1 Yes
Yes
Yes
2 WIC
63 504 No 0
1 No
Yes
Yes
3 M.BATH
56 448 No 0
1 Yes
Yes
Yes
4 KITCHEN
192 1536 Yes 0
1 No
Yes
Yes
5 BATH
45 360 No 0
1 Yes
Yes
Yes.
6 BEDROOM 2
204 1632 No 0
1
1 Yes
Yes
Yes
7 ENTRY
55 440 No 0
1 Yes
Yes
Yes
8 LAUNDRY
42 336 No 0
1 Yes
Yes
Yes
9 GREAT/DINING
488 3904 No 0
1 . Yes
Yes
Yes
FLOORS
# Floor Type
Space Perimeter Perimeter R-Value
- Area
Joist R-Value
Tile Wood
Carpet
1 Slab -On -Grade Edge Insulatio
BEDROOM 52 ft 0
301 ftz
---_
0 .1
0
2 Slab -On -Grade Edge Insulatio
WIC 1 ft 0
63 ftz
----
0 1
0
3 Slab -On -Grade Edge Insulatio
M. BATH 8 ft 0
56 ftz
____
0 1
0
4 Slab -On -Grade Edge Insulatio
KITCHEN 1 ft 0
192 ftz
----
0 1
0
5 Slab -On -Grade Edge Insulatio
BATH 5 ft 0
45 ftz
-
0 1
0
6 Slab -On -Grade Edge Insulatio
BEDROOM 2 32.2 ft 0
203.5 ftz
___
0 1
0
7 Slab -On -Grade Edge Insulatio
ENTRY 7 ft 0
55 ftz
-__-
0 1
0
4/21 /2020 10:27 AM EnergyGauge®. USA 6.0.02 (Rev. 1) - FlaRes2017 FBC 6th Edition (2017) Compliant Software Page 2 of 5
'FORM R405-2017 . INPUT SHMMARV ['_I-IFCKi 'I-QT 01=PnPT
FLOORS
# Floor Type Space Perimeter Perimeter R-Value
Area
Joist R-Value
Tile Wood Carpet
8 Slab -On -Grade Edge Insulatio LAUNDRY 6 ft 0
42 ft2
-_-_
0
1
0
9 Slab -On -Grade Edge Insulatio GREAT/DINING 46 ft 0
488 ft2
_--_
0
1
0
ROOF
/ Roof
Gable
Roof
Rad
Solar
SA Emitt
Emitt Deck
Pitch
# Type Materials Area
Area
Color
Barr
Absor.
Tested
Tested Insul.
(deg)
1 Gable or Shed Metal 1524 ft2
240 ft2
Light
N
0.6
No 0.9
No 0
18.4
ATTIC
V # Type Ventilation.
Vent Ratio (.1 in)
Area
RBS
IRCC,
1 Full attic Vented
150
1446 ft2
N
N
CEILING
# Ceiling Type Space
R-Value
Ins Type
Area
Framing Frac
Truss Type
1 Under Attic (Vented) BEDROOM
30
Blown
301ft2
0.1
Wood
2 Under Attic (Vented) WIC
30
Blown
63 ft2
0.1
Wood
3 Under Attic (Vented) M. BATH
30
Blown
56 ft2
0.1
Wood
4 Under Attic (Vented) KITCHEN
30
Blown
192 ft2
0.1
Wood
5 Under Attic (Vented) BATH
30
Blown
45 ft2
0.1
Wood
6 Under Attic (Vented) BEDROOM 2
30
Blown
204 ft2
0.1
Wood
7 Under Attic (Vented) ENTRY
30
Blown
55 ft2
0.1
Wood
8 Under Attic (Vented) LAUNDRY
30
Blown
42 ft2
0.1
Wood
9 Under Attic (Vented) GREAT/DINING
30
Blown
488 ft2
0.1
Wood
10 Knee Wall (Vented) GREAT/DINING
19
Blown
30 ft2
0.11
Wood
WALLS
Adjacent Cavity Width
Spacele Ft n
Height
Et
Sheathing Framing Solar Belo w
1 NE=>SW Exterior Concrete Block - Int InsuBEDROOM
4.1 10
0 8
0
80.0 ft2
0
0
0.4
0
2 SW=>NE Exterior Concrete Block = Int InsuBEDROOM
4.1 28
0 8
0
224.0 f1:2
0
0
0.4
0
3 NW=>SE Exterior Concrete Block - Int InsuBEDROOM
4.1 14
0 8
0
112.0 ft2
0
0
0.4
0
4 SW=>NE Exterior Concrete Block - Int Insul M. BATH
4.1 8
0 8
0
64.0 ft2.
.0
0
0.4
0
5 NE=>SW Exterior Concrete Block - Int Insul BATH
4.1 5
0 8
0
40.0 ft2
0
0
0.4
0
6 NE=>SW Exterior Concrete Block - Int InsElEDROOM 2
4.1 16
0 8
0
128.0 ft2
0
0
0.4
0
7 SE=>NW Exterior Concrete Block - Int Ins8lEDROOM 2
4.1 10
0 8
0
80.0.ft2
0
0
0.4
0
8 S=>N Exterior Concrete Block - Int InsBEDROOM 2
4.1 4
3 8
0
34.0 ft2
0
0
0.4
0
_ 9 SW=>NE Exterior Concrete Block - Int InsI3EDROOM 2
4.1 2
0 8
0
16.0 ft2
0
0
0.4
0
_ 10 SE=>NW Exterior Concrete Block - Int Insul ENTRY
4.1 6
0 8
0
48.0 ft2.
0
0
0.4
0
11 SW=>NE Exterior Concrete Block - Int Insul ENTRY
4.1 1
0 8
0
8.0 ft2
0
0
0.4
0
_ 12 SW=>NE Exterior Concrete Block - Int InsuLAUNDRY
4.1 6
0 8
0
48.0 ft2 .
0
0
0.4
0
13 NE=>SW Exterior Concrete Block : Int Ins.8REAT/DINI
4.1 26
0 8
0
208.0 ft2
0
0
0.4
0
14 NW=>SE Exterior Concrete Block - Int InsiGREAT/DINI
4.1 20
0 8
0
160.0 ft2
0
0
0.4
0
4/21/2020 10:27 AM EnergyGauge® USA 6.0.02 (Rev. 1) - FlaRes2017 FBC 6th Edition (2017) Compliant Software Page 3 of 5
FORM R405-2017 INPUT SUMMARY f:HFC1fl ICT P1=Pn0T
WALLS
Adjacent
Cavity Width Height Sheathing Framing Solar Below
Space -
soro
15 N=>S Garage Frame - Wood KITCHEN 11 24 8 192.0 ft2' 0.23 0.4
0
DOORS
# Ornt
Door Type Space
Storms U-Value Width Height
Ft In Ft In
Area
1 SE=>NW
Insulated ENTRY
None .39 3 1 6 8
20.6 ft2
WINDOWS
Orientation shown is the entered orientation. => chan ed to Worst Case.
/ Wall
# Ornt ID Frame
Panes NFRC
Overhang
U-Factor SHGC Imp Area Depth Separation Int Shade
Screening
1 NW=>SE 3 Metal
2 SW=>NE.4 Metal
3 SE=>NW 7 Metal
4 NE=>SW 13 Metal
5 NW=>SE14 Metal
Low-E Single Yes
Low-E Single Yes
Low-E Single Yes
Low-E Single Yes
Low-E Single Yes
1.04 0.29 Y 32.9 ft2 1 ft 0 in 1 ft 5 in Drapes/blinds
1.04 0.29 Y 6.9 ft2 1 ft 0 in 1 ft 5 in None
1.04 0.29 Y 24.0 ft2 6 ft 0 in 1 ft 5 in None
1.04 0.29 Y 37.5 ft2 1 ft 0 in 1 ft 5 in None
1.11 0.27 . Y 40.0 ft2 8 ft 0 in 1 ft 5 in Drapes/blinds
Exterior 5
None
None
None
Exterior 5
GARAGE
# Floor Area
Ceiling Area
Exposed Wall Perimeter Avg. Wall Height Exposed Wall Insulation
1 315W
315ft2
24ft 8ft 11
INFILTRATION
# Scope Method
SLA
CFM 50 ELA EgLA ACH ACH 50
1 Wholehouse Proposed ACH(50) .000356
1349.6 74.09 139.34 .1233 7
HEATING SYSTEM
# System Type
Subtype
Speed Efficiency Capacity Block
Ducts
1 Electric Heat Pump/ Split
Singl HSPF:8.5 34.8 kBtu/hr 1
sys#1
COOLING SYSTEM
# System Type
Subtype
Subtype Efficiency Capacity Air Flow SHR Block
Ducts
1 Central Unit/
Split
Sing[ SEER: 15 34.8 kBtu/hr cfm 0.8 1
sys#1
HOT WATER SYSTEM
# System Type
SubType Location
EF Cap Use SetPnt Conservation.
1 Electric
None Garage
0.97 50 gal 60.9 gal 120 deg None
4/21/2020 10:27 AM EnergyGauge® USA 6.0.02 (Rev. 1) - FlaRes2017 FBC 6th Edition (2017) Compliant Software Page 4 of 5
FORM R405-2017 INPUT S1IMMORY r14Fr1fl ICT RGanQT
SOLAR HOT WATER SYSTEM
FSEC
Collector Storage
Cert # Company Name
System Model #
Collector Model # Area Volume
FEF
None None
ft2
DUCTS
/ — Supply ----
---- Return --
Air
CFM 25
CFM25
HVAC #
# Location R=Value Area
Location
Area
Leakage
Type
Handler
TOT
OUT QN
RLF
Heat Cool
1 Attic
6 175 ft2
Attic
6.5 ft2
Default Leakage .
Attic
(Default) (Default)
1 1
TEMPERATURES
Programable Thermostat: Y
Ceiling, Fans:
Cooling Jan Feb
f X� Jan Feb
Venting
Ventin
Mar
Mar
Apr
f .Apr
f
May
May
Jun
f Jun
Jul
Jul
Aug
4 Aug
REP
Oct
Oct
Nov
Nov
Dec
XDec
[)Jan .Feb
Mar
[X] A r
[
Ma
[ Jun
Jul
[ Au
[X] Oct .Nov
[ ]Dec
Thermostat Schedule: HERS 2006 Reference
Hours
Schedule Type
1
2
3
4
5
6
7
8
9 10
11
12
Cooling (WD) AM
78
78
78
78
78
78
78
78
80 80
80
80
PM
80
80
78
78
78
78
78
78
78 78
78
78
Cooling (WEH) AM
78
78
78
78
78
78
78
78
78 78
78
78
PM
78
78
78
78
78
78
78
78
78 78
78
78
Heating (WD) AM
66
66
66
66
66
68
68
68
68 68
68
68
PM
68
68
68
68
68
68
68
68
68 68
66
66
Heating (WEH) AM
PM
66
68
66
68
66
66
66
68
68
68
68 68
68
68
68
68
68
68
68
68
68 68
66
66
MASS
Mass Type
Area
Thickness
Furniture Fraction
Space
Default(8 Ibs/sq.ft.
.0 ft2
0 ft
0.3
MASTER BEDROO
Default(8 lbs/sq.ft.
ft2
ft
0.3
WIC
Def6ult(8 Ibs/sq.ft.
ft2
ft
0.3
MASTER BATH
Default(8 Ibs/sq.ft.
ft2
ft
0.3
M. BATH
Default(8 lbs/sq.ft.
ft2
ft
0.3
LAUDRY
Default(8 Ibs/sq.ft.
ft2.
ft
0.3
BEDROOM 2
Default(8.Ibs/sq.ft.
ft2
ft
0.3
DINING/GREAT R
Default(8 lbs/sq.ft.
ft2
ft
0.3
KITCHEN
Default(8 Ibs/sq.ft.
ft2
ft
0.3
BATH
Default(8 Ibs/sq.ft.
ft2
ft
0.3
HALL
Default(8 lbs/sq.ft.
ft2
ft
0.3
FOYER
Default 81bs/s .ft.
ft2
It
0.3
BEDROOM 3
4/21/2020 10:27 AM EnergyGauge® USA 6.0.02 (Rev. 1) - FlaRes2017 FBC 6th Edition (2017) Compliant Software . Page 5 of 5
2017 - AIR BARRIER AND INSULATION INSPECTION COMPONENT CRITERIA
TABLE 402.4.1.1
AIR BARRIER AND INSULATION INSPECTION COMPONENT CRITERIA
Project Name:. WYNNE THE GRAND CARLTON IMPACT Builder Name: WYNNE BUILDING COPR.
Street: Permit Office: ST. LUCIE COUNTY
City, State, Zip: FT. PIERCE, FL, Permit Number:
<
Owner: WYNNE BUILDING CROP Jurisdiction: ST. LUCIE COUNTY
'Design Location: FL, Fort Pierce
U
COMPONENT
AIR BARRIER CRITERIA
INSULATION INSTALLATION CRITERIA
General
A continuous air barrier shall be installed in the building envelope.
Air -permeable insulation shall
requirements
The exterior thermal envelope contains a continuous air barrier.
not be used as a sealing material.
Breaks or joints in the ale barrier shall be sealed.
Ceiling/attic
The air barrier in any dropped ceiling/soffit shall be aligned with
The insulation in an dropped ceiling/soffit
Y PP 9 /soffit
the insulation and any gaps in the air.barrier. shall be sealed.
shall be aligned with the air barrier.
Access openings, drop down stairs or knee wall doors to
unconditioned attic spaces shall be sealed.
Walls
The junction of the foundation and sill plate shall be sealed.
Cavities within corners and headers of frame walls
The junction. of the top plate and the top of exterior walls shall be
shall be insulated by completely filling the cavity
sealed.
with a material having a thermal resistance of R-3
Knee walls shall be sealed.
per inch minimum.
Exterior thermal envelope insulation for framed
walls shall be installed.in substantial contact and
continuous alignment with the air barrier.
Windows, skylights
The space between window/door.jambs and framing, and
and doors
skylights and framing shall be sealed.
Rim joists
Rim joists shall include the air barrier.
Rim joists shall be insulated.
Floors
.The air barrier shall be installed at any exposed edge of
Floor framing cavity insulation shall be installed to
(including
insulation.
maintain permanent contact with the underside of
above -garage
subfloor decking, or floor framing cavity insulation
and cantilevered
shall be permitted to be in contact with the top side
floors)
of sheathing, or continuous insulation installed on
the underside of floor framing and extends from the
bottom to the top of all perimeter floor framing
members.
Crawl space walls
Exposed earth in unvented crawl spaces shall be covered with
Where provided instead of floor insulation, insulation
a Class I vapor retarder with overlapping joints taped.
shall be permanently attached to the crawispace
Shafts, penetrations `
Duct shafts, utility penetrations, and flue shafts opening to
exterior or unconditioned space shall be sealed.
Batts in narrow cavities shall be cut to fit, or narrow
Narrow cavities
cavities shall be filled by insulation that on
installation readily conforms to the available cavity
spaces.
Garage separation
Air sealing shall be provided between the garage and conditioned Spec
Ds.
Recessed lighting
Recessed light fixtures installed in the building thermal envelope
Recessed light fixtures installed in the building
shall be sealed to the drywall.
thermal envelope shall be air tight and IC rated.
Plumbing and wiring
Batt insulation shall be cut neatly to fit around wiring
and plumbing in exterior walls, or insulation that on
installation readily conforms to available space.shall
p'peng and wiring,
Shower/tub
The air barrier installed at exterior walls adjacent to showers and
-exteadj2abond
Exterior walls adjacent to showers and tubs shall
on exterior wall
tubs shall separate them from the showers and tubs.
be insulated.
Electrical/phone box or
The air barrier shall be installed behind electrical or communication
exterior walls
boxes or air -sealed boxes shall be installed.
HVAC register boots
HVAC register boots that penetrate building thermal envelope shall
be sealed to the sub -floor or drywall.
Concealed
When required to be sealed, concealed fire sprinklers shall only be
sprinklers
sealed in a manner that is recommended by the manufacturer.
Caulking or other adhesive sealants shall not be used to fill voids
between fire sprinkler cover plates and walls or cellIngs-
a. In addition, inspection of log walls shall be in accordance with the provisions of ICC-400.
4/21/2020 10:32 AM EnergyGauge® USA 6.0.02 (Rev. 1) - FlaRes2017 FBC 6th Edition (2017) Compliant Software Page 1 of 1
- 2017 EPL DISPLAY CARD
ENERGY PERFORMANCE. LEVEL (EPL) DISPLAY CARD
ESTIMATED ENERGY PERFORMANCE INDEX* =. 99
The lower the Energy Performance Index, the more efficient the home.
1. New home or, addition
1. New (From Plans)
12. Ducts, location & insulation level
a) Supply ducts
R
6.0
2. Single-family or multiple -family
2. Single-family
b) Return ducts
R
6.0
c) AHU location
Attic
3. No. of units (if multiple -family)
3.
1
4. Number of bedrooms
4.
2
13. Cooling system:
Capacity
34.8
a) Split system
SEER
15.0
5. Is this a worst case? (yes/no)
5.
Yes
b) Singlepackage
SEER
c) Ground/water source SEER/COP
6. Conditioned floor area (sq. ft.)
6..
1446
d) Room unit/PTAC
EER
e) Other
7. Windows, type and area
a) U-factor:(weighted average)
7a.
1.060
b) Solar Heat Gain Coefficient(SHGC)
7b.
0.284
14. Heating system:
Capacity
34.8
c) Area
7c.
141.3
a) Split system heat pump
HSPF .
8.5.
b) Single package heat pump HSPF
8. Skylights
c) Electric resistance
COP
a) U-factor:(weighted average)
8a.
NA
d) Gas furnace, natural gas
AFUE
b) Solar Heat Gain Coefficient (SHGC)
8b.
NA
e) Gas furnace, LPG
AFUE
f) Other
9. Floor type, insulation level:
a) Slab -on -grade (R-value)
b) Wood,. raised (R-value)
c) Concrete, raised (R-value)
10. Wall type and insulation:
A. Exterior:
1. Wood frame (Insulation R-value)
2. Masonry -(Insulation R-value)
B. Adjacent:
1. Wood frame (Insulation R-value)
2. Masonry (Insulation R-value)
11. Ceiling type. and insulation level
a) Under attic
b) Single assembly
c) Knee walls/skylight walls
d) Radiant barrier installed
9a. 0.0
9b.
9c.
10A1.
10A2. 4.1
15. Water heating system
a) Electric resistance EF 0.97
b) Gas fired, natural gas EF
c). Gas fired, LPG EF
d) Solar system with tank EF
e) Dedicated heat pump with tank EF
f) Heat recovery unit HeatRec%
g) Other
1061.
11.0
10132.
16. HVAC credits claimed (Performance. Method)
a) Ceiling fans
11a.
30.0
b) Cross ventilation No
11b.
c) Whole house fan No
11c.
19.0
d) Multizone cooling credit
11d.
No
e) Multizone heating credit
0 Programmable thermostat Yes
*Label required by Section R303.1.3 of the Florida Building Code, Energy Conservation, if not DEFAULT.
I certify that this home has complied with the Florida Building Code, Energy Conservation, through the above energy.
saving features which:will be installed (or exceeded). in. this home before .final inspection. Otherwise, a new EPL
display card will .be completed based on installed code compliant features.
Builder Signature:G- / Date: \ 4
Address of New HometACity/FL Zip: FT: PIERCE FL_S:I�S '!�A
4/21/202010:32:17 AM EnergyGauge® USA 6:0.04 (Rev. 1) - FlaRes2017 FBC 6th Edition (2017) Compliant Software Page 1 of 1