Loading...
HomeMy WebLinkAboutEnergy CodeFORM R405-2017 FLORIDA ENERGY'EFFICIENCY CODE FOR BUILDING CONSTRUCTION Florida Department of Business and Professional Regulation - Residential Performance Method ProjectName: WYNNE THE ROYALE IMPACT BuilderName: WYNNE Street: WYNNE DEV. Permit Office: ST. LUCIE COUNTY City, State, Zip: FT. -PI RCE PermitNumber. Owner:` jL. Jurisdiction: DesignLocaflon: FL, Fort Pierce County: St. Lucie (Florida Climate Zone 2 ) 1. New construction or existing, New (From Plans) 9. Wall Types (1688.7 sqft.) Insulation ,Area, 2. Single family or multiple family Single-family a. Concrete Block - Int Insul, Exterior R=4.1 1448.70 ft2 b. Frame -Wood, Adjacent R=11.0 240.00 ft2 3. Number of units, if multiple family 1 c. N/A R= ft2 4. Number of Bedrooms 3 d• N/A R= ft2 5. Is this a worst case? Yes 10. Ceiling Types (1750.0 sqft.) Insulation Area. a. UnderAttic (Vented) R=30.0 1720.00 ft2 6. Conditioned floor area above grade (ft2) 1720 b. Knee Wall (Vented) R=19.0 30.00 ft2 Conditioned floorareabelowgrade(ft2) 0 cDucts R_ 2 11 R ft2 7. Windows(155-.4 sqft.) Description Area a. Sup: Attic, Ret: Attic, AH: Attic 6 155 a. U-Factor: Sgl, U=1.04 115.42 ft2 SHGC: SHGC=0.29 b. U-Factor: Sgl, U=1.11 40.00 ft2 12. Cooling systems kBtu/hr Efficiency SHGC; SHGC=0.27 a. Central Unit 34.8 SEER:15:00 C. U-Factor: N/A ft2 SHGC: 13. Heating systems kBtu/hr Efficiency d. U-Factor: NIA ft2 a. Electric Heat Pump 34.8 HSPF:8.50 SHGC: Area Weighted Average Overhang Depth: 3.316 ft. Area Weighted Average SHGC: 0.285 14. Hotwatersystems 8. Floor Types (1720.0 sgft.) Insulation Area a. Electric Cap: 50 gallons • a. Slab -On -Grade Edge Insulation R=0.0 1720.00 ft2 b. Conservation features EF:0.970 b. N/A R= ft2 ' None c. N/A R= ft2 15. Credits Pstat Glass/Floor Area: 0.090 Total Proposed Modified Loads: 56.10 PASS Total Baseline Loads: 56.25 I hereby certify that the plans and specifications covered by Review of the plans and>:, this calculation are in compliance with the Florida Energy specifications covered by this Code. calculation indicates compliances>,���� ',: with the Florida Energy Code. PREPARED BY: Before construction is completed DATE: 4-20-202 this•building will be inspected for compliance with Section 553.908 ,� # 'I hereby certify that this,building, as designed, is in compliance Florida Statutes. with the Florida Energy Code. OWNER/A EkN BUILDING OFFICIAL: DATE: DATE: - Compliance requires certification by the air handler unit manufacturer that the air handler enclosure qualifies as certified factory -sealed in accordance with R403.3.2.1.. - Compliance requires an Air Barrier and Insulation Inspection Chec�st,1t� c e wi 4 2.4.1.1 and this project requires an envelope leakage test report with envelope leakage no greater than"i'�Di�1��.� CODE C: O PLIANCE ST. LUOIE COUNTY 4/20/2020 2:55 PM EnergyGauge® USA 6.0.02 (Rev. 1) - FlaRes2017 FBC 6th Edition (2017) Compliant Software . Page 1 of 5 FORM R405-2017 INPUT SUMMARY CHECKLIST RFPnRT PROJECT Title: WYNNE THE ROYALE IMPA Bedrooms:. 3 Address Type: Street Address Building Type: User ConditionedArea: 1720 Lot# OwnerName: Total Stories: 1 Block/Subdivision: # of Units: 1 Worst Case: Yes PlatBook: BuilderName: WYNNE RotateAngle: 90 Street: WYNNE DEV. Permit Office: ST. LUCIE COUNTY CrossVentilation: No County: St. Lucie Jurisdiction: Whole House Fan: No City, State, Zip: FT. PIERCE , FamilyType: Single-family FL, New/Existing: New (From Plans) Comment: CLIMATE / Design Temp Int Design Temp Heating Design DailyTemp DesignLocation TMY Site 97.5 % 2.5 % Winter Summer Degree Days Moisture Range FL, Fort Pierce FL VERO_BEACH_MUNI 39 90 70 75 299 62 Low BLOCKS Number Name Area Volume, 1 Entire House 1720 13760 SPACES Number' Name . Area Volume Kitchen Occupants Bedrooms Infil ID Finished Cooled . Heated 1 BEDROOM 343 2744 No 0 1 1 Yes Yes Yes 2 WIC 63 504 No 0 1 No Yes. Yes 3 M.BATH 56 448 No 0 1 Yes -Yes Yes 4 KITCHEN 172 1376 Yes 0 1 No Yes Yes . 5 BATH 45 360 No 0 1 'Yes Yes Yes 6 BEDROOM 2 204 1632 No 0 1 1 Yes Yes Yes 7 ENTRY 98 784 No 0 1 Yes Yes Yes 8 LAUNDRY 42 336 No 0 1 Yes Yes Yes 9 GREAT/DINING 528 4224 No 0 1 Yes Yes Yes 10 BEDROOM 3 169 1352 No 1 1 1 Yes Yes Yes FLOORS # FloorType Space Perimeter 'PerimeterR-Value Area JolstR-Value Tile Wood Carpet 1 Slab-On-GradeEdgelnsulation BEDROOM 52ft 0 343ft2 ____ 0 1 0 2Slab-On-Grade Edge Insulation WIC 1 ft 0 63ft2 ---_ 0 1 0 3Slab-On-Grade Edge Insulation M. BATH 8 ft 0 56 ft2 ---- 0 1 0 4Slab-On-Grade Edge Insulation KITCHEN 1 ft 0 112ft2 0 1 0 5Slab-On-Grade Edge Insulation BATH 5ft, 0 45ft2 _--_ 0 1 0 6 Slab -On -Grade Edge Insulation BEDROOM 2 42.6.ft 0 204 ft2 _-__ 0 1 0 7Slab-On-Grade Edge Insulation ENTRY • 6.3ft 0 98ft2 _ 0 1 0 4/20/2020 2:55 PM EnergyGauge® USA 6.0.02 (Rev, 1) - FbRes2017 FBC 6th Edition (2017) Compliant Software Page 2 of 6 . FORM R405-2017 INPUT SUMMARY CHECKLIST REPORT FLOORS # FloorType Space Perimeter PerimeterR-Value Area JoistR-Value Tile Wood Carpet 8Slab-On-GradeEdgelnsulation LAUNDRY 6ft 0 42ft2 ---- 0 1 0 9Slab-On-GradeEdge Insulation GREAT/DINING 48ft 0 528ft2 ---- 0 1 0 10SIab-On-GradeEdge Insulation BEDROOM 3 13 ft 0 169 ft2 ---- 0 1 0 ROOF / Roof Gable Roof Red Solar SA Emitt Emitt Deck Pitch V # Type Materials Area Area Color Barr Absor. Tested Tested Insul. (deg) 1 GableorShed Metal 1813ft2 286ft2 Light N 0.6 No 0.7 No 0 18.4 ATTIC V # Type Ventilation Vent Ratio (1 in) Area RBS IRCC 1 Full attic Vented 150 1720 ft2 N N CEILING # CeIIIngType Space R-Value Ins Type Area Framing Frac Truss Type 1 Under Attic (Vented) BEDROOM 30 Blown 343ft2 0.1: 'Wood 2 UnderAttic(Vented) WIC 30 Blown 63ft2 0.1 Wood 3 UnderAttic (Vented) M. BATH 30 Blown 56 ft2 0.1 Wood 4 Under Attic (Vented) KITCHEN 30 Blown 172ft2 0.1 Wood 5 UnderAttic(Vented) BATH 30 Blown 45ft2 0.1 Wood 6 Under Attic (Vented) BEDROOM 30 Blown 204ft2 0.1 Wood 7 UnderAttic(Vented) ENTRY 30 Blown 98ft2 0.1 Wood 8 UnderAttic(Vented) LAUNDRY 30 Blown 42ft2 0.1 Wood . 9 UnderAttic(Vented) GREAT/DINING 30 Blown 528ft2 0.1 Wood 10 Under Attic (Vented) BEDROOM 30 Blown 169ft2 0.1 Wood 11 Knee Wall (Vented) GREAT/DINING 19 Blown 30 ft2 0.11 Wood WALLS Adjacent Cavity Width Height Sheathing .Framing Solar Below Space 1 N=>E Exterior Concrete Block- Int Insul BEDROOM 4.1 9 0 8 0 72.0 ft2 0 0 0.4 0 2 S=>W Exterior Concrete Block- Int Insul BEDROOM 4.1 29 0 8 0 232.0 ft2 0 0 0.4 0 3 W=>N Exterior Concrete Block - Int Insul BEDROOM 4.1 14 0 8 0 112.0 ft2 0 0 0.4 0 4 S=>W Exterior Concrete Block - Int Insul M. BATH 4.1 8 0 8 0 64.0 ft2 0 0 0.4 0 5 N=>E Exterior Concrete Block - Int Insul BATH 4.1 5 0 8 0 40.0 ft2 0 0 0.4 0 6 N=>E Exterior Concrete Block- Int InsuBEDROOM 2 4.1 14 0 8 0 112.0 ft2 0 0 0.4 0 7 NE=>SE Exterior Concrete Block- Int InsuBEDROOM 2 4.1 2 10 8 0 22.7 ft2 0 0 0.4 0 8 E=>S Exterior Concrete Block - Int InsuBEDROOM 2 4.1 9 0 8 0 72.0 ft2 0 0 0.4 0 9 SE=>SW Exterior Concrete Block- Int InsuBEDROOM 2 4.1 2 10 8 0 22.7 ft2 ' 0 0 0.4 0 10 S=>W Exterior .Concrete Block -.Int InsuBEDROOM 2 4.1 14 0 8 0 112.0 ft2 0 0 0.4 0 11 NE=>SE Exterior Concrete Block- Int Insul ENTRY 4.1 1 5 8 0 11.3 ft2 0 0 0.4 0 4/20/2020 2:55 PM EnergyGaugeO USA 6.0.02 (Rev. 1) - FlaRes2017 FBC 6th Edition (2017) Compliant Software Page 3 of 5 FORM R405-2017 INPUT SUMMARY nwFrKI IST RFPnRT WALLS Adjacent Sh. pace CavR_Vaity Width -0 _ypeFt Height In Are;; Sheathing Framing Solar Below R-1/able Ahqor - Fraction Grade% 12 E=>S Exterior Concrete Block- Int Insul ENTRY 4.1 5 0 8 0 40.0 ft2 0 0 0.4 0 13 S=>W Exterior Concrete Block- Int Insul LAUNDRY 4.1 6 0 8 0 48.0 ft2 0 0 0.4 0 _ 14 N=>E Exterior Concrete Block- Int InsuIGREAT/DINT 4.1 28 0 8 0 224.0 ft2 0 0 0.4 0 15 W=>N Exterior Concrete Block - Int InsuIGREAT/DINT 4.1 20 0 8 0 160.0 ft2 0 0 0.4 0 .16 N=>E Exterior Concrete Block - Int InsuBEDROOM 3 4.1 13 0 8 0 104.0 ft2 0 0 0.4 0 _17 N=>E Garage Frame -Wood BEDROOM 11 30 8 240.0ft2 0.23 0.4 0 DOORS # Ornt DoorType Space Storms U-Value Width Height Area Ft In Ft In 1 E=>S Insulated ENTRY None .32 3 6 8 20 ft2 WINDOWS Orientation shown is the entered orientation => changed to Worst Case. / Wall Overhang # Ornt ID Frame Panes NFRC U-Factor SHGC Imp Area Depth Separation IntShade Screening 1 W=>N 3 Metal Low-ESingle Yes 1.04 0.29 N 32.4 ft2 1 ft 0 in 1 ft 5 in Drapes/blinds Exterior5 2 S=>W 4 Metal Low-ESingle Yes 1.04 0.29 N 6.9 ft2 1 ft 0 in 1 ft 5 in None None 3 E=>S 8 Metal Low-ESingle Yes' 1.04 0.29 N 23.2 ft2 1 ft 0 in 1 ft 5 in None None 4 N=>E 14 Metal Low-ESingle Yes 1.04 0.29 N 36.8 ft2 1 ft 0 in 1 ft 5 in None None 5 W=>N 15 Metal Low-ESingle Yes 1.11 0.27 N 40.0 ft2 10 ft 0 in 1 ft 5 in None None 6 N=>E 16 Metal Low-ESingle Yes 1.04 0.29 N 16.2 ft2 1 ft 0 in 1 ft5 in None None GARAGE # FloorArea CeilingArea Exposed Wall Perimeter Avg. Wall Height Exposed Wall Insulation ' 1 300 ft2 300 ft2 30 ft 8 ft 11 INFILTRATION # Scope Method SLA CFM 50 ELA EgLA ACH ACH 50 1 Wholehouse ProposedACH(50) .000356 1605.3 88.13 165.74 .1233 7 HEATING SYSTEM # System Type Subtype Speed Efficiency Capacity Block Ducts 1 Electric Heat Pump/ Split Single HSPF:8.5 34.8 kBtu/hr 1 sys#1 COOLING SYSTEM # System Type Subtype Subtype Efficiency Capacity Air Flow SHR Block Ducts 1 CentralUnit/ Split Single SEER: 15 34.8 kBtu/hr cfm 0.85 1 sys#1 4/20/2020 2:55 PM EnergyGauge® USA 6.0.02 (Rev. 1) - FlaRes2017 FBC 6th Edition (2017) Compliant Software Page 4 of 5 FORM R405-2017 INPUT SUMMARY CHFCKLIST RFPART HOT WATER SYSTEM # System Type SubType Location EF Cap Use SetPnt Conservation 1 Electric None Garage 0.97 50gal 60.9gal 120deg None SOLAR HOT WATER SYSTEM FSEC Collector Storage Cert # CompanyName System Model# CollectorModel# Area Volume FEF None None ft2 . DUCTS — Supply--- -- Return — Air CFM 25 CFM25 HVAC # # Location R-Value Area Location Area LeakageType Handler TOT OUT QN RLF Heat Cool 1 Attic 6 155 ft2 Attic 55 ft2 DefaultLeakage. Attic (Default) c(Default) c 1 1 TEMPERATURES ProgramabIdThermostat: Y CeilingFans: CoolingJan Feb HeatinJan Feb Mar Mar Apr f Apr Ma f May. Jun Jul Jun' Jul Auge Aug 4 Sep Oct f Oct v Ev Dec Dec Ventin Jan [ l Feb Mar [Xl A r [ Ma Jun Jul Au [ Se [x] Oct v Dec ThermostatSchedule: HERS 2006 Reference Hours ScheduleType 1 2 3 4 5 6 7 8 9 10 11 12 Cooling(WD) AM 78 78 78 78 78 78 78 78 80 80, 80 80 PM 80 80 78 78 78 78 78 78 78 78 78 78 Cooling(WEH) AM 78 78 78 78 78 78 78 • 78 78 78 78 78 PM 78 78 78 78 78 78 78 78 78 78 78 78 Heating(WD) AM 66 66 66 66 66 68 68 68 68 68 68 68 PM 68 68 68 68 68 68 68 68 68 68 66 66 Heating(WEH) AM 66 66 66 66 66 68 68 68 68 68 68 68 PM 68 68 68 68 68 68 68 68 68 68 66 66 MASS Mass Type Area Thickness Furniture Fraction Space Default(81bs/sq.ft. 0 ft2 0 ft 0.3. BEDROOM Default(8lbs/sq.ft. ft2 ft 0.3 WIC Default(8lbs/sq.ft: ft2 ft 0.3 M. BATH Default(81bs/sq.ft. ft2 ft 0.3 KITCHEN . Default(8lbs/sq.ft. ft2 ft 0.3 BATH Default(8lbs/sq.ft. ft2 ft 0.3 BEDROOM 2 Default(8lbs/sq.ft. ft2 ft 0.3 ENTRY Default(8lbs/sq.1. ft2 ft 0.3 LAUNDRY Default(8lbs/sq.ft. ft2 ft 0.3 GREAT/DINING Default 8lbs/s .ft. ft? ft _ 0.3 BEDROOM-3 . 4/20/2020 2:55 PM EnergyGaugeO USA 6.0.02 (Rev.1) - FlaRes20l 7 FBC 6th Edition (2017) Compliant Software Page 5 of 5 2017 - AIR BARRIER AND INSULATION INSPECTION COMPONENT CRITERIA TABLE 402A.1.1 AIR BARRIER AND INSULATION INSPECTION COMPONENT CRITERIA Project Name:, WYNNE THE ROYALE IMPACT Builder Name: WYNNE Street: WYNNE DEV. Permit Office: ST. LUCIE COUNTY City, State, Zip: FT. PIERCE; FL, Permit Number: ! Owner: Jurisdiction: w Design Location: - FL, Fort Pierce x U COMPONENT AIR BARRIER CRITERIA INSULATION INSTALLATION CRITERIA General A continuous air barrier shall be installed in the building envelope. Air -Permeable insulation shall requirements The exterior thermal envelope contains a continuous air barrier. not be used as a sealing material. Breaks or joints in the air barrier shall be sealed. Ceiling/attic The air barrier in any dropped ceiling/soffit shall be aligned with The insulation in an dropped ceiling/soffit , y pp g /soffit the insulation and any gaps in the,air barrier shall be sealed. shall be aligned with the air barrier. Access openings, drop down stairs or knee wall doors to unconditioned attic spaces shall be sealed. Walls The junction of the foundation and sill.plate shall be sealed.. Cavities within corners and headers of frame walls The junction of the top plate and the top of exterior walls shall be shall be insulated by completely filling the cavity sealed. with'a material having a thermal resistance'of R-3 Knee walls shall be sealed. per inch minimum. Exterior thermal envelope.insulation for framed , walls shall be installed in substantial contact and continuous alignment with the air barrier. Windows, skylights The.space between window/doorjambs and framing, and and doors skylights and framing shall be sealed. Rim joists Rim joists shall include the air barrier. Rim joists shall be insulated. Floors The air barrier shall be installed at any exposed edge of Floor framing. cavity. insulation shall be installed to (including insulation. maintain permanent contact with the underside of above -garage subfloor decking, or floor framing cavit y insulation and cantilevered shall be permitted to be in contact with the top side floors) of sheathing, or continuous insulation installed on the underside of floor framing and extends from the bottom to the top of all perimeter floor framing members. Crawl space walls Exposed earth in unvented crawl spaces shall be covered with Where provided instead of floor insulation, insulation a Class I vapor retarder with overlapping joints taped. shall be permanently attached to the crawispace Shafts, penetrations Duct shafts, utility penetrations, and flue shafts opening to exterior or unconditioned space shall be sealed. Batts in narrow cavities shall be cut to fit, -or narrow Narrow cavities cavities shall be filled by insulation that on installation readily conforms to the available cavity spaces. Garage separation Air sealing shall be provided between the garage and conditioned spa s. Recessed lighting Recessed.light fixtures installed in the building thermal envelope Recessed light fixtures installed in the building shall be sealed to the drywall. thermal envelope shall. be air tight and IC rated. Plumbing and wiring Batt insulation shall be cut neatly to fit around wiring and plumbing in exterior walls, or insulation that on installation readily conforms to available space shall Shower/tub The air barrier installed at exterior walls adjacent to showers and Exterior walls adjacent to showers and tubs shall on exterior wall tubs shall separate them from the showers, and tubs. be insulated. Electrical/phone box or The air barrier shall be installed behind electrical or communication exterior walls boxes or air -sealed boxes shall be installed. HVAC register boots HVAC register boots that penetrate building thermal envelope shall be sealed tathe sub -floor or. drywall. Concealed When required to be sealed, concealed fire sprinklers shall only be sprinklers sealed. in a manner that is recommended. by the manufacturer. I Caulking or other adhesive sealants shall not be used to fill voids between fire snrinkler c=r Hates and Mils or cellings. a. In addition, inspection of log walls shall be in accordance with the provisions of ICC-400. 4/20/2020 2:55 PM EnergyGauge® USA 6.0:02 (Rev. I)- FlaRes2017 FBC 6th Edition (2017) Compliant Software Page 1 of 1 2017 EPL DISPLAY CAFRD ENERGY PERFORMANCE. LEVEL (EPL) DISPLAY CARD ESTIMATED ENERGY PERFORMANCE INDEX* = 100 The lower the Energy Performance Index, the more efficient the home 1. New home or, addition 1. New (From Plans) 12. Ducts, location & insulation level a) Supply ducts R 6.0 .2. Single-family or multiple -family .2. Single-family b) Return .ducts R 6.0 c) AHU location Attic 3. No. of units (if multiple -family) 3. 1 4. Number of bedrooms 4. 3 13. Cooling system: Capacity : 34.8 a) Split system SEER . 15.0 5. Is this a worst case? (yes/no) 5. Yes b) Single package SEER c) Ground/water source SEER/COP 6. Conditioned floor area (sq. ft.) 6. 1720 d) Room unit/PTAC EER e) Other 7. Windows, type and area a) U-factor:(weighted average) 7a. 1.058 b) Solar Heat Gain Coefficient (SHGC) 7b. 0.285 14. Heating system: Capacity 34.8 c) Area 7c. 155.4 a) Split. system heat pump HSPF . 8.5 b) Single package heat pump HSPF 8. Skylights c) Electric resistance COP a) U-factor:(Weighted average) 8a. NA d) Gas furnace, natural'gas. AFUE b) Solar Heat Gain Coefficient (SHGC) 8b. NA e) Gas furnace, LPG AFUE f) Other 9. Floor type, insulation level: a) Slab -on -grade (R-value) 9a. 0.0 b) Wood, raised (R-value) 9b. 15. Water heating system c) Concrete, raised (R-value) 9c. a) Electric resistance EF 0.97 b) Gas fired, natural gas EF 10. Wall type and insulation: c) Gas fired, LPG EF A. Exterior: d) Solar system with tank EF 1. Wood frame (Insulation R-value) 10A1. e) Dedicated heat pump with tank EF 2. Masonry (Insulation R-value) 10A2. 4.1 0 Heat recovery unit HeatRec% B. Adjacent: g) Other 1. Wood frame (Insulation R-value) 10131. 11.0 2. Masonry (Insulation R-value) 10132. 16. HVAC credits claimed (Performance Method) 11. Ceiling .type and insulation level a) Ceiling fans a) Under attic 11a. 30.0 b) Cross ventilation No b) Single assembly 11b. c) Whole house fan No c) Knee walls/skylight walls 11c. 19.0 d) Multizone cooling credit d) Radiant barrier installed 11d. No e) Multizone heating.credit f) Programmable thermostat Yes "Label required by Section R303.1.3 of the Florida Building Code, Energy Conservation, if not DEFAULT. I certify that this home has complied with the Florida Building Code, Energy Conservation, through the above energy saving features. which will be installed (or exceeded) in. this home before final inspection: Otherwise, .a new EPL display card will be completed based on installed code compliant features. Builder Signature: Date: Address of New Home: WYNNE DEV. ��J� \ �' City%FL Zip: FT. PIERCE, FL ���5 4/20/2020 2:55:34 PM EnergyGauge® USA 6.0.04 (Rev. 1) - FlaRes2017 FBC 6th Edition (2017) Compliant Software Page 1 of 1