Loading...
HomeMy WebLinkAboutCompaction testHeadquarters ENGINEERING Mailing 11345 U.S. Highway 1 PO Box Sebastian, FL. 32958 AND TESTING Orrlando Phone: 772589 0712 723 Progress Way SOIL COMPACTION REPORT C.A.# 5693 Sanford, FL. 32771 ASTM D 1557 and ASTM D 6938 KSMengineering.net DATE TESTED: September 28, 2020 KSM JOB #: 204771-1d/CH/)o PERMIT#: NUC# 417 CONTRACTOR: R & E Loader Service Nuc Model: 3500 JOB LOCATION: 594 Beach Avenue Nuc Serial #: 3417 Port St Lucie, Florida ITEM TESTED: Compacted Foundation Fill TEST LOCATION PEN DRY MAX. DRY PERCENT DEPTH OF SAMPLE READ DENSITY PROCTOR VALUE (P.C.F) COMPACTION 1. S.E. 0" - 12" 45 109.4 113.4 96.5% 2. S.W. 48 109.9 96.9% 3. Center 43 108.8 95.9% 4. N.E. 45 109.1 96.2% 5. N.W. 45 109.6 96.6% Soil Description: 115.0 Brown Sand with some W E Shell I I I I I I I I I I I In Place Moisture: G 114.0 — i— —I— •—�•— �••—•• ••—••• 12.7% H I I I I I T Proctor Optimum Moisture: 113.0 t 11.0% P Proctor Max. Dry Density: P.C.F. C •—• II —• II III — 112.0 I I .„.—_... 113.4 F , @ Test Locations the Density & I I I I I Penetrometer readings indicate the D 111.0 ••—•1—"—'I'—"—t'—"-1"—"1"'—"' Degree of Compaction Meets Minimum Requirement R Y I I I I I for Unstaked Foundation 110.0 •—•;—••—;•—••—>•—••— ••—••4••—••, Rest�ggtfpj�,ybmitted: 8 9 10 11 12 13 14 ``PN E Dq��2i,� pI Ita�� Moisture- % of Dry Weight • i Q', 1.10ENS :' �� ice' g y signed by Disclaimer: Contractor is responsible to maintain No. 81439 _ '...... 1gnedan° Bryan E Dahlke the tested area in the condition that KSM * * *°�"�/ Date: completed the indicated passed compaction test. -0 �� KSM is not responsible if the tested area has been ��0�'• STATE OF :'���C °^ °` i1heVe°feOOnanyeMp" 2020.09.29 altered from the approved inspected condition. ���s'•.FGORID , ''� 12:47:25 /�iS/0NAL ON",\-04'00' BryaYYWhlke, P.E. V.P. of Engineering PE # 81439 9/29/2020 Email to: mcarthuresther@bellsouth.net Proudly Serving Florida since 1990