HomeMy WebLinkAboutHIRSCH CD1 10-1-20 SS (2)FKOJECT NOTES:
PROJECT CLA551FICATION: RENOVATION
ALL WORK PER FLORIDA BUILDING CODE 2017, RE51DENTIAL
DE51GN STANDARDS:
CONCRETE- ACI 301
ALL NEW CONCRETE SHALL BE 3000 P51
WOOD- AFPA/ND5-01
ALL STRUCTURAL MEMBERS SHALL BE
SOUTHERN YELLOW PINE #2 OR BETTER
WIND LOADS- ASCE 7-10
ALL ELECTRICAL WORK PER NEC -2014
HIND DE510 INFORMATION
WIND DE5IGN PER A5GE 7-10
ULTIMATE DESIGN WIND 5PEED
160 MPH (3 SEC GUST) k
NOMINAL DESIGN WIND 5PEED
', 124 MPH (3 SEC GUST -.
Ln
R15K CATEGORY
II
WIND EXPOSURE
C
ENCLOSURE
CLOSED
INTERNAL PIZE65UIZE COEF'F'ICIENT
+.18/-.18
COMPONENTS & CLADDING
SEE ELEVATIONS FOR
22"X48" 122'X48" I
WIND PRE55URE5 ON
REV 10-1-20 j +34.1 P5F
WINDOWS & DOORS
W00
REMOVE WINDOW REMOVE WINDOW REMOVE WINDOW
BLOCK IN OPENING BLOCK IN OPENING RECONFIGURE OPENING
v v ° O
\\\1
' v ° ' v Z CLOSET N
0 0 #4 DOWELS 0 +/- 24" O.C. 3 a
�TO EXISTING SLAB W/ EPDXY Z LU
L
o v o v• MIN. 4" EMBEDMENTOFFICE
W
° v
LU 1L
Z
v o v o o v v 2500 P51 CONC. MASTER MASTER zz NO
0 v° o v° o� BATH BEDROOM L
O Q U
o v o o n
° a v ° a v °
O O
v o v o v
EXISTING Z
°ov°ov° SLAB :2
q o v o v 7
° ,� CLOSET
v v O
0 0 0
.� A
REV 10-1-20
Ll
INTERIOR WALL PARTITION
NON LOAD BEARING
CHORD OF TK U55
'SUM WALLBOARD
\NNEL PLATE
SUM WALLBOARD
i 5/8" METAL STUD5 016" O.C.
", 2"X6" WOOD STUDS 016" O.C.
CHANNEL PLATE
-D TO 5LA5 W/
VE PINS
. 5LA5
35 TOP CHORD
3/411 = 1'-0"
3" VTR
j MA5TE1
BATH
NG
LINE
PLUMBING 91'::�-PIMRAMFR N 15
wal Lecow
EXISTING WALLS TO REMAIN
EXISTING WALLS TO REMOVED
FRAMED OPENINGS
EXISTING OPENINGS TO DE
DLOCKEDIN
IEJ 10 NEW CDS WALLS
FILLED CELL WITH (1) #5
OR V'X&' CONC. COLUMN
AT NEW OPENING LOCATION
WITHIN EXISTING CBS WALL
REV 10-1-20
SLIDER TO REMAN
((2) 62"X12" TRANSOM
IN NEW OPENING
0
z
Q
co
Ln
o
F---1
f W
LLJ
22"X48"
22"X48" 122'X48" I
L
REV 10-1-20 j +34.1 P5F
SKYLIGHT
SKYLIGHT I SKYUGHt
-45.6 P5F � z
--1-�--
MASTER
I
L--
N3
�z
+z
Ln
------BATH —
— MASTER
BEDROOM
DESImf7EW �RE5IS�M�17
CABANA
BATH
FLOOR PLAN
EXI5TIN(f
1/4" = 1'-0"
WALL AND CEILING FINISHES
ALL NEW WALL AND CEILING FINISHES SHALL
HAVE A FLAME SPREAD INDEX OF NOT GREATER THAN 200
AND A SMOKE DEVELOPED INDEX OF NOT GREATER THAN 450
ALL NEW INSULATION SHALL HAVE A FLAME 5PREAD INDEX
NOT TO EXCEED 25 AND A SMOKE DEVELOPED INDEX NOT TO
EXCEED 450
I
23'11"
12' 0 "
T
4'-6" DBL PCKT
REV 10-1-20
PAD OUT WALL-
FTO MATCH WALL
AT POCKET
FLOOR PLAN
CABANA
BATH
52.5 P5F 1i6"X46"WINDOW
5.4 P5F I IN NEW OPENING
L
OFFICE
-6" DBL
36" PCKT
1/4" = 1'-0"
LAUNDRY
LAUNDRY
BERTO
Z 'T No.49492 2 =
C� a
o ' STATE OF
y�i is 'ORVD
.....•
SJONA` EN `.
GA r���rlI11 I, bi ikAo� gned by
ejarano
Bejarano signature
Date: 2020.10.01
co
Ln
LJ
m
LLJ
m
L
Ln
Ln
00
Ln
Ln
LJ
Lu
®
�
m
LL -j
0
�
�J
W
�
L
me
C:=cx:)�
LL -1
Ln
Q\
X
w
N
CV
N
BERTO
Z 'T No.49492 2 =
C� a
o ' STATE OF
y�i is 'ORVD
.....•
SJONA` EN `.
GA r���rlI11 I, bi ikAo� gned by
ejarano
Bejarano signature
Date: 2020.10.01
ill
LJ
LLJ
L
Ln
Ln
00
Ln
LJ
Lu
®
Ln
LL -j
LL -1
L
C:=cx:)�
LL -1
Ln
ill