Loading...
HomeMy WebLinkAboutHIRSCH CD1 10-1-20 SS (2)FKOJECT NOTES: PROJECT CLA551FICATION: RENOVATION ALL WORK PER FLORIDA BUILDING CODE 2017, RE51DENTIAL DE51GN STANDARDS: CONCRETE- ACI 301 ALL NEW CONCRETE SHALL BE 3000 P51 WOOD- AFPA/ND5-01 ALL STRUCTURAL MEMBERS SHALL BE SOUTHERN YELLOW PINE #2 OR BETTER WIND LOADS- ASCE 7-10 ALL ELECTRICAL WORK PER NEC -2014 HIND DE510 INFORMATION WIND DE5IGN PER A5GE 7-10 ULTIMATE DESIGN WIND 5PEED 160 MPH (3 SEC GUST) k NOMINAL DESIGN WIND 5PEED ', 124 MPH (3 SEC GUST -. Ln R15K CATEGORY II WIND EXPOSURE C ENCLOSURE CLOSED INTERNAL PIZE65UIZE COEF'F'ICIENT +.18/-.18 COMPONENTS & CLADDING SEE ELEVATIONS FOR 22"X48" 122'X48" I WIND PRE55URE5 ON REV 10-1-20 j +34.1 P5F WINDOWS & DOORS W00 REMOVE WINDOW REMOVE WINDOW REMOVE WINDOW BLOCK IN OPENING BLOCK IN OPENING RECONFIGURE OPENING v v ° O \\\1 ' v ° ' v Z CLOSET N 0 0 #4 DOWELS 0 +/- 24" O.C. 3 a �TO EXISTING SLAB W/ EPDXY Z LU L o v o v• MIN. 4" EMBEDMENTOFFICE W ° v LU 1L Z v o v o o v v 2500 P51 CONC. MASTER MASTER zz NO 0 v° o v° o� BATH BEDROOM L O Q U o v o o n ° a v ° a v ° O O v o v o v EXISTING Z °ov°ov° SLAB :2 q o v o v 7 ° ,� CLOSET v v O 0 0 0 .� A REV 10-1-20 Ll INTERIOR WALL PARTITION NON LOAD BEARING CHORD OF TK U55 'SUM WALLBOARD \NNEL PLATE SUM WALLBOARD i 5/8" METAL STUD5 016" O.C. ", 2"X6" WOOD STUDS 016" O.C. CHANNEL PLATE -D TO 5LA5 W/ VE PINS . 5LA5 35 TOP CHORD 3/411 = 1'-0" 3" VTR j MA5TE1 BATH NG LINE PLUMBING 91'::�-PIMRAMFR N 15 wal Lecow EXISTING WALLS TO REMAIN EXISTING WALLS TO REMOVED FRAMED OPENINGS EXISTING OPENINGS TO DE DLOCKEDIN IEJ 10 NEW CDS WALLS FILLED CELL WITH (1) #5 OR V'X&' CONC. COLUMN AT NEW OPENING LOCATION WITHIN EXISTING CBS WALL REV 10-1-20 SLIDER TO REMAN ((2) 62"X12" TRANSOM IN NEW OPENING 0 z Q co Ln o F---1 f W LLJ 22"X48" 22"X48" 122'X48" I L REV 10-1-20 j +34.1 P5F SKYLIGHT SKYLIGHT I SKYUGHt -45.6 P5F � z --1-�-- MASTER I L-- N3 �z +z Ln ------BATH — — MASTER BEDROOM DESImf7EW �RE5IS�M�17 CABANA BATH FLOOR PLAN EXI5TIN(f 1/4" = 1'-0" WALL AND CEILING FINISHES ALL NEW WALL AND CEILING FINISHES SHALL HAVE A FLAME SPREAD INDEX OF NOT GREATER THAN 200 AND A SMOKE DEVELOPED INDEX OF NOT GREATER THAN 450 ALL NEW INSULATION SHALL HAVE A FLAME 5PREAD INDEX NOT TO EXCEED 25 AND A SMOKE DEVELOPED INDEX NOT TO EXCEED 450 I 23'11" 12' 0 " T 4'-6" DBL PCKT REV 10-1-20 PAD OUT WALL- FTO MATCH WALL AT POCKET FLOOR PLAN CABANA BATH 52.5 P5F 1i6"X46"WINDOW 5.4 P5F I IN NEW OPENING L OFFICE -6" DBL 36" PCKT 1/4" = 1'-0" LAUNDRY LAUNDRY BERTO Z 'T No.49492 2 = C� a o ' STATE OF y�i is 'ORVD .....• SJONA` EN `. GA r���rlI11 I, bi ikAo� gned by ejarano Bejarano signature Date: 2020.10.01 co Ln LJ m LLJ m L Ln Ln 00 Ln Ln LJ Lu ® � m LL -j 0 � �J W � L me C:=cx:)� LL -1 Ln Q\ X w N CV N BERTO Z 'T No.49492 2 = C� a o ' STATE OF y�i is 'ORVD .....• SJONA` EN `. GA r���rlI11 I, bi ikAo� gned by ejarano Bejarano signature Date: 2020.10.01 ill LJ LLJ L Ln Ln 00 Ln LJ Lu ® Ln LL -j LL -1 L C:=cx:)� LL -1 Ln ill