Loading...
HomeMy WebLinkAboutLetter; Subsurface InvestigationOrlando: i ih DoW A 7 i AN 1011110 Phone: 772-589-0712 723 Progress Way C.A. # 5693 Sanford, FL. 32771 KSMengineering.net August 24, 2020 Tony Patton Patton Construction 845 37th Avenue Vero Beach, Florida 32960 Re: 10527 Oakbridge Court Fort Pierce, Florida KSM Project #: 203962-b Dear Mr. Patton: RECEIVED SEP' 21 2020 Permitting Department St. Lucie County a33Z As requested, KSM Engineering & Testing has performed a subsurface investigation at the referenced site. Presentation of the data gathered during the investigation, together with our geotechnical related opinions, are included in this report. A. Site Description: At the time of drilling, the site was fairly flat with light surface vegetation (grass) and few trees. B. Project Description: A one-story single-family residence is planned to be constructed on the site. Loads from the structure will be transferred to the ground by conventional shallow footings. We estimate the maximum loads will be less than 2,500 pounds per linear foot along the wall foundation. Some additional site fill will be required to reach the desired grades. Proudly Serving Florida since 1990 Orlando: i%s•DwF&VA ANU' MINh ° 723 Progress Way Sanford, FL. 32771 10527 Oakbridge Court -2- Fort Pierce, Florida C. The scope of our study consisted of the following: Phone: 772-589-0712 C.A. # 5693 KSMengineering.net August 24, 2020 1. Performed Standard Penetration Test Borings in the proposed construction area to estimate the subsoil relative density. 2. Measured the groundwater level at each boring. 3. Evaluated the existing soil conditions with respect to the proposed construction and provided recommendations for site preparation and foundation design. 4. Prepared this report to document our findings. D. Site Investigation: The site investigation program consisted of performing four (4) Standard Penetration Test borings (SPT), in the proposed construction area. The SPT borings were terminated at depths of 10 to 14 feet below grade. The locations of the borings are indicated on the attached boring logs. The SPT borings were completed in accordance with procedures described in ASTM D- 1586. A standard 1.5 inch I.D., 2 inch O.D. split -spoon sampler is driven into the soil by successive blows of a 140 pound hammer freely falling 30 inches. The number of blows required to drive the sampler 1 foot, after seating 6 in., is designated the Penetration Resistance, or "N" value. At regular intervals the sampler is extracted from the ground and opened to allow visual examination and classification of the retained soil sample. Also, the groundwater table was allowed to stabilize and the depth of the groundwater elevation recorded from existing grade. The records of the soils encountered, the penetration resistances and groundwater level are shown on the attached logs. Proudly Serving Florida since 1990 Orlando: i i140 A V A A i u ,' La' II�1� N U • 723 Progress Way Sanford, FL. 32771 10527 Oakbridge Court -3- Fort Pierce, Florida E. Engineering Evaluation and Conclusions: Phone: 772-589-0712 C.A. # 5693 KSMengineering.net August 24, 2020 Based on the information obtained from this site investigation, we are pleased to offer the following evaluation: The boring logs indicate the subsurface conditions to be fairly uniform across the site. The soils consist mostly of fine-grained sand, slightly silty or slightly clayed sand, and clayed sand. "N" values recorded during the boring operation indicate the soil density is generally medium dense to a depth of approximately 10 feet below existing grade and then the soils became loose. Please refer to the soil boring logs for specific information relative to the soil description. Based on the existing soil conditions, the proposed structure can be supported on a shallow foundation system provided that the site is properly prepared. The following sections provide recommendations for the site preparation and foundation design. F. Site Preparation: The proposed building area and areas to be paved, plus a minimum margin of five feet beyond- the proposed construction shall be stripped and grubbed of surface debris, including vegetation, roots and organic matter. Stumps shall be removed entirely. The building area should be graded level and proofrolled. Any soft yielding areas shall be excavated and replaced with clean compacted fill. Sufficient passes should be made during compaction operations to produce a density no less than 95 percent of its modified dry Proctor value (ASTM D 1557) to a depth of two feet. After the exposed surface has been proofrolled, the building and pavement areas may be filled to the desired grades. The fill material shall consist of clean granular sand containing less than 10% material passing the U.S. Standard No. 200 mesh sieve. Place structural fill in loose layers of 12 inches in thickness and compact each lift to at least 95 percent of its modified dry Proctor value. After excavating for the footings, the disturbed footing subgrade should be recompacted to 95 percent (minimum) of its modified dry Proctor value. This can be best achieved by making several passes with a relatively light -weight walk -behind vibratory sled or roller. Proudly Serving Florida since 1990 oriando: i INa/ A r S H11 U I CJ I l II U Phone: 772-589-0712 • 723 Progress Way C.A. # 5693 Sanford, FL. 32771 KSMengineering.net 10527 Oakbridge Court -4- August 24, 2020 Fort Pierce, Florida G. Foundation: Provided that our recommendations for site preparation are followed, the proposed structure may be supported on conventional concrete, steel reinforced footings designed for an allowable soil bearing pressure of 2,500 pounds per square foot, or less. With the foundation properly designed and the site properly prepared, we anticipate total settlements less than 3/ of an inch and differential settlement of less than %4 of an inch. The majority of the settlement should occur during construction. H. Floor Slabs: A conventional slab -on -grade can be used in the "at grade" portion of the building. We recommend the disturbed subgrade below the floor slab be re -compacted to 95 percent of the modified Proctor maximum dry density (ASTM D 1557) prior to placement of the concrete. An estimated modulus of subgrade reaction of 150 pounds per cubic inch (pci) can be used for design of the slab -on -grade. We recommend that control joints be incorporated in the slab at frequent intervals to control shrinkage cracks. A moisture barrier is recommended beneath the floor slab to prevent moisture migration from the underlying soil resulting in dampness of the slab. I. Pool (If Constructed): Based on the existing soil conditions, a pool can be designed and constructed using an allowable soil bearing pressure of 2,500 pounds per square foot. When excavating the pool, if any organic soil or soft material is encountered, these materials/soils should be removed and replaced with 3/" stones so the subgrade becomes firm below the pool bottom. Backfill material behind the pool shell shall consist of clean granular sand with less than 10 percent "fines" passing the U.S. No. 200 sieve. Place backfill material in loose lifts of 12 inches in thickness and compact each lift to no less than 95 percent of its modified dry Proctor value (ASTM D 1557). Proudly Serving Florida since 1990 Orlando: &Mm"iTi AMU 1011 \U Phone:772-589-0712 723 Progress Way C.A. # 5693 Sanford, FL. 32771 KSMengineering.net 10527 Oakbridge Court -5- August 24, 2020 Fort Pierce, Florida J. Closure: This report has been prepared in accordance with generally accepted soil and foundation engineering practices based on the results of the test borings and the assumed loading conditions. No warranties, either expressed or implied, are intended or made. This report does not reflect any variations which may occur between the borings. If variations appear evident during the course of construction, it would be necessary to re-evaluate the recommendations of this project. Environmental conditions, wetland delineation, water quality, and municipal requirements are not a part of this report. We are pleased to be of assistance to you on this phase of your project. When we may be of further service to you or should you have any questions, please feel free to contact us. J Eft E-mail to: apatton@pattonconst.com Proudly Serving Florida since 1990 CLIENT Patton Construction PROJECT NAME 10527 Oakbridge Court PROJECT NUMBER 203962-b PROJECT LOCATION Fort Pierce Florida DATE STARTED 8/21/20 COMPLETED 8/21/20 GROUND ELEVATION HOLE SIZE inches DRILLING CONTRACTOR GROUND WATER LEVELS: DRILLING METHOD Split Spoon Sample �-Z AT TIME OF DRILLING 3.08 ft LOGGED BY MS/MH CHECKED BY JEK AT END OF DRILLING -- NOTES See Attached Location Plan AFTER DRILLING -- wn. o z A SPT N VALUE A ~^ U a0 UJm > Ul w z-3 a 1= 20 40 60 80 PL MC LL a. O MATERIAL DESCRIPTION M > 0 O Q z CL p—� o CD z Ov m O z U" } 20 40 60 80 < W d 0 0 FINES CONTENT (%) ❑ 0 20 40 60 80 Gray Sand with Some Roots ::'•': t: Dark Brown Sand 5 -6-7 :.......:.......:.......:...... SS (13) = Gray Sand, Slightly Clayed - Gray Sand, Slightly Silty SS 10-10-11 (21).. ............................ 5 Brownish Gray Sand, Slightly Clayed 7-7-7 •:. SS (14) :.......:.......:......... ::,.... SS 5-6-7 ..................................... ;:;: SS 4-4-4 (8) :.......:.......:.......:. 2-1-2 ...................... .• . Dark Brown Clayed Sand F (3) ""'2-2-2.:.....Light Gray Clayed Sand IA% ......" """ "' " """ of borehole at p a CLIENT • Patton Construction PROJECT NAME 10527 Oakbridae Court _ PROJECT NUMBER 203962-b PROJECT LOCATION Fort Pierce, Florida DATE STARTED 8/21/20 COMPLETED 8/21/20 GROUND ELEVATION HOLE SIZE inches DRILLING CONTRACTOR GROUND WATER LEVELS: DRILLING METHOD _Split Spoon Sample AT TIME OF DRILLING 3.00 ft LOGGED BY MS/MH CHECKED BY JEK AT END OF DRILLING — NOTES See Attached Location Plan AFTER DRILLING — a a Z A SPT N VALUE ~ U = c9 0: r W } 0: w D W a 20 40 60 80 PL MC LL -, w v 0-0 MATERIAL DESCRIPTION 2 j C� o Q W a '" z m o z U S m V Z v }" 20 40 60 80 < ui a W ❑ FINES CONTENT (%) C3 0 20 40 60 80 Gray Sand with Some Roots . Dark Brown Sand SS 5-5-7 (12) "'""""""" """" ............. ........ ....... .:...... .......... ....... ........ :...... .............. :....... :....... ....... :...... :....... :...... Gray Sand, Slightly Clayed .: • .. Gray Sand, Slightly Silty SS 7-8-10 (18) SS 6 6-7 (13) •: :, .. • : Brownish Gray Sand, Slightly Clayed SS 5-5-5 (10) SS....... 5-5-4 (9) Bottom of borehole at 10.0 feet. J CLIENT Patton Construction PROJECT NAME 10527 Oakbridae Court PROJECT NUMBER 203962-b PROJECT LOCATION Fort Pierce, Florida DATE STARTED 8/21/20 COMPLETED 8121/20 GROUND ELEVATION HOLESIZE inches DRILLING CONTRACTOR GROUND WATER LEVELS: DRILLING METHOD Split Spoon Sample AT TIME OF DRILLING 3.17 tt LOGGED BY MS/MH CHECKED BY JEK AT END OF DRILLING — NOTES See Attached Location Plan AFTER DRILLING --- w ♦ SPT N VALUE U CL W w 20 40 60 80 o.CLO MATERIAL DESCRIPTION -1g Ci O � ¢ w z z a �0 20 ov OJ o-z V� m0z Uv 40 60 80 ❑ FINES CONTENT (%) ❑ < Lu .� a ce Gray Sand with Some Roots Dark Brown Sand Gray Sand, Dark Gray Clayed Sand R C* SS 6-5-7 (12) . ...................................... ... ... .... .... .... ... .... ..... :.......:.......:.......:...... :.......:.......:............. ..................................... ... ... .... .... ..................................... .......:................... ..................................... ..... ....... ....... ....... :...... ....... :....... :....... ....... :...... SS 9-10-11 (21) Clayed SS 8-7-7 (14) SS 6-7-6 (13) SS 5-4-4 (8)9— SS 3-2-1 (3) SS2-2-2 (4) >rehole at 14.0 feet. CLIENT Patton Construction PROJECT NAME 10527 Oakbridge Court PROJECT NUMBER 203962-b PROJECT LOCATION Fort Pierce, Florida DATE STARTED 8/21/20 COMPLETED 8/21120 GROUND ELEVATION HOLE SIZE inches DRILLING CONTRACTOR GROUND WATER LEVELS: DRILLING METHOD _ Split Spoon Sample Q AT TIME OF DRILLING 3.08 ft LOGGED BY MS/MH CHECKED BY JEK AT END OF DRILLING — NOTES See Attached Location Plan AFTER DRILLING -- W o W A SPT N VALUE A U o: >• rn w n 20 40 60 80 PL MC LL -, n- = C9 O MATERIAL DESCRIPTION w WE j a g~ 3 O=¢ w y z CL pv a.Z v� mOZ V" }" 20 40 60 80 ❑ FINES CONTENT (%) ❑ O'� L v a M Gray Sand with Some Roots :.......:......:.......:...... • • • .................................... Dark Brown Sand SS 6-7-9 (16) ... Gray Sand, Slightly Clayed :. .. Gray Sand, Slightly Silty SS 6-6-5 .. (11) Brownish Gray Sand, Slightly Clayed 7-7-6 : ' SS (13) ' ..................................... SS 7-6-7 (13) SS 5-5-4 .. . .......:.......:.......:...... (9) Bottom of borehole at 10.0 feet. * al • �`. wlu� Y� 1+,4 x,�y. ' �v wixlt • f91� �r °xL't Tx,Ft 1 -� �, 4 ,r.a�`n an ,� Sr 4 .. "-�` i •` '��r.� r a - ':s..raL �SA 'd � a. `�� y.` ' 4 s „�' ��, * ,.�� x.�t„� r., . { `? vl � r r °� fir; , 'ter. �^ , • , �,,,�. Y..�' �r.,���a 1 ` . s. ^F.. k s � • . .. � c '� � t �-f ;'� �"sik �� M,�rt.e,% � �, t'.r wr°!� �' . ,i* rs t., � :a4S.�aG PROJECT: 10527 Oakbridge Court, Fort Pierce, Florida