Loading...
HomeMy WebLinkAboutTermite treatment certPlanning & Development Services S - J 711 = Building & Code Regulation Division 2300 Virginia Ave No Fort Pierce, FL 34982 772-462-2172 Fax 772-462-6443 CERTIFICATE OF TERMITE TREATMENT CONSTRUCTION SOIL TREATMENT PERMIT BUILDEI PEST CONTROL CONTRACTOR: EVICT -A -BUG TERMITE& PEST CONTROL INC. PEST CONTROL LICENSE #: JB175775 We, the undersigned, hereby certify that we have pretreated the above described construction for subterranean termites in accordance with the standards of the National Pest Control Association. Square feet if area treated: LZ 5 yr Percentage of solution:.05% Date of Treatment: 1 U • Footing 1st Treatment Re -Treat Driveway 1s` Treatment Re -Treat Other 1" Treatment Re -Treat Chemicals used: DOMINION 2L Total gallons used: Time of Treatment: d 1 3d Slab I" Treatment Re -Treat Pools meter Note: There must be a completed form for each requiyd treatment or site to be picked up by the inspector at time of each inspection or the s fee charged Treat p` d tent and this form must be on the job inspection will fail and a re -inspection FBC104.2.6 Certificate of Protective Treatment for prevention of termites. A weather resistant jobsite posting board shall be provided to receive duplicate Treatment Certificates as each required protective treatment is completed, providing a copy for the person the permit is issued to and another copy for the building permit files. The Treatment Certificate shall provide the product used, identity of the applicator, time and date of the treatment, site location, area treated, chemical used, percent concentration and number of gallons used, to establish a verifiable record of protective treatment. If the soil chemical barrier method for termite prevention is used, final exterior treatment shall be completed prior to final building approval. St Lucie County requires for the final inspection for CO, a Permanent Sticker to be placed on the electrical panel box cover, listing all the treatments and dates of applications. Revised 7/24/2014 BUILDING PERFORMANCE INSTITUTE, INC. 107 Hermes Roatl, Suite 210 Malta, NY 12020 (877) 274-1274 www.bpl.org 4 Bp{ _ Martin Klein BPI IDN: 60aiw3 °X (SEE REVERSE SIDE FOR DESIGNATIONS AND EXPIRATION DATES) CERTIFIED PROFESSIONAL DESIGNATION E%PIRATION DATE InCdlntion & Duct t.nlugR (IDL) ans2nv BUILDING PERFORMANCE INSTITUTE, INC. �i. ^�_ �' , �oC fz 2 vs • Termite Inspection 5i is 772-323-7921 • Termite Pretreatment a EYICf • Pest Control A -Bug rtl T811 free:1-177-385.9810 • Rodent Service Peeststite & F21. 772348-5188 P • Fire Ant Lawn Service Control, Email: Evictabug@gmail.com - Whitefly Treatment Inc.Ave. Meadows 4293 SW High Me • Licensed & Insured Lic. JB175775 Palm City, flows Notice of Preventative Treatment for Termites 4990 (as required by Florida Building Code (FBC) 104.2.6, 105.10 & R318.1 and Broward County Chapter FBC 105.2.2) PEST PREVENTION I FIRE ANT SERVICE I TERMITE SERVICE I RODENT EXCLUSION & REMOVAL I WHITEFLY TREATMENT DATE OF SERVICE t TIME DEVELOPMENT NAME (PROJECT) CO RACTOR'S NAME CONTACT PERSON STRUCTURE ADDRESS (LOT/BLOCK) CITY, STATE COUNTY ��,�,, r �� NOTES ^ L ZIP CODE TGGSTYCYTT QC/went• ❑ FLOATING ❑ MONOLITHIC ❑ PATIO ❑ GARAGE ❑ DRIVEWAY ❑ STEM WALUFOOTERS ❑ ADDITION ❑ CUTOUTS ❑ FOOTER ❑ FRONT ENTRY ❑ RETREAT ❑ BORA CARE TREATMENT ❑ PLUMBING CUTOUTS ❑ SIDEWALKS ❑ TAMP & TREAT �'CLPIITREAT ONLY ❑ FINAL ❑ POOL DECK ❑ OTHER PRODUCTS ❑ BASELINE ❑DOMINION 21.ACTIVE INGREDIENT ❑ TERMIDOR SC ❑ BORACARE ❑ PREMISE ❑ TALSTAR ❑ OTHER ACTIVE INGREDIENT C,JMIDACLAPRID U BIFENTHRIN ❑ DISODIUM OCTABORATE TETRAHYDRATE CONCENTRATION U .06% ❑ .1% ❑ .12% ❑ .25% ❑ .05% ❑ 23% D 9% ❑ OTHER GALLONSAPPLIED SQUARE FOOTAGE LINEAR FOOTAGE - SQUARE FOOTAGE VERIFIED p YES ❑ NO 11 MEASURED OR VERIFIED PER PLANS JOB READY CONDITIONS MET O YES ❑ NO DETAILS "Certificate of Compliance" Asper 104.2.6, 105.10 & R318.1 FBC -If soil chemical barrier method for termite prevention is used. Final exterior treatment shall be completed prior to final building approval. Certificate of Compliance: The building has received a complete treatment for the prevention of subterranean termites. Treatment is in accordance with rules and laws established by the Florida Department of Agriculture and Consumer Services. (Per the Florida Building Code.) (� If this notice is for the final exterior treatment, initial and date this line — \1 FINAL STICKER ❑ ELECTRICAL PANEL ❑ WATER HEATS Payment Terms: Payment due at time of service. Date Date wewnier trroperry uwner or Agent) www.evictabugpestcontrol.com