Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
Plot Plan
SHEET PROJECT DESCRIPTION. F OVRIDAIRE IDEDNTIAL CODE,6th EDITION 2017(FRC) A 00 INDEXPLOT PLAN &VICINITY MAP PROJECT SITES Castillo G(i 31x355 LG NEON2: LG355N1C-N5(355W)MODULES FLORIDA PLUMBING CODE,6th EDITION 2017(FPC) A-01 SYMBOLS&SYSTEM DESCRIPTION Engineering ROOF MOUNTED SOLAR PHOTOVOLTAIC MODULES FLORIDA BUILDING CODE,6th EDITION 2017 EDITION (FBC) S-01 ROOF PLAN & MODULES DESIGNED TO 11i SYSTEM SIZE: 11.005 kW DC STC FLORIDA MECHANICAL CODE,6th EDITION 2017(FMC) S-02 STRUCTURAL ATTACHMENT DETAILS ARRAY AREA#1: 576.08 SQ SERVICES, FT. NEC 2014 CODE BOOK E-01 ELECTRICAL LINE DIAGRAM CAS ENGINEERING SERVICES, LLC EQUIPMENT SUMMARY E-02 WIRING CALCULATIONS co"u2aSas 31 LG NEON2: LG355N1C-N5(355W)MODULES E-03 SYSTEM LABELING 2925W SUTESTATE111 434, LONGWOOD,FL 32779 31 ENPHASE: IQ7PLUS-72-2-US MICROINVERTERS TEL:1117)2H-2575 DS-01-06 DATA SHEET ERmocRnr_SE.CASTILLO-FL PEs2sso COPYRIGHTED BY CASTILLO ENGINEERING SERVICES,LLC REVISIONS 644'-411 DESCRIPTION DATE REV o EXISTING o DRIVEWAY z CV w PROJECT INSTALLER z I 4651 w 0 1-STORY HOUSE I S U N P R U Signat ire a signed by 54'-011 I 2 HOUSE PHOTO Ermocrates _�; Castillo gFo,,a°.• : Date: ROOF#1 A-00 SCALE: NTS (31) LG NEON2: LG355N1C-N5 I-' 0.1�0 05 0 (355W)MODULES CDPROJECT SITE 16-5 (E) MAIN DISTRIBUTION PANEL PROJECT04%, � r 00 CD - o ° LO Q, Z LU Z M N � F n Pierce a Z cii C_ South _ f3f w w U lJJ 0 (n � w I ZW Ea: I t 4640 Christensen Road cU 0 � 00 � LL White City Indian River Estates SHEET NAME 6431-411 PLOT PLAN & VICINITY MAP SHEET SIZE ANSI B W E 11" X 17" 1 PLOT PLAN WITH ROOF PLAN 3 VICINITY MAP SHEET NUMBER A-00 SCALE: 1/32"= V-0" S A-00 SCALE: NTS A-00 Castillo Engineering; Vw Symbols: Abbreviations: DESIGNED TO PERMIT Sheet where CASTILLO ENGINEERING Section.............. x section is located SERVoIC 2834 ES, LLC x-xx AC Alternating Current 2925W.STATE ROAD 434, SUITE 111 LONGWOOD,FL 32779 Detail ID Letter APPROX Approximate System Description ERMOCRATES ECASTILLO�FL PE 52590 Elevation........... x Sheet where X-XX section is located AWG American Wire Gauge COPYRIGHTED BYCASTILLO ENGINEERING Detail ID Letter CB Combiner Box This system is a grid-tied, PV system, with PV generation consisting of 31 LG SERVICES,LLC Detail................ xxx Sheet where NEON2 LG355N1C-N5 (355W) MODULES with a combined STC rated do output power REVISIONS section is located DC Direct Current of 11005W. The modules are connected into 31 ENPHASE IQ7PLUS-72-2-US DESCRIPTION DATE REV ---Detail ID Letter MICROINVERTERS. The inverter has electronic maximum power point tracking to Detail................ X DCD Direct Current Disconnect p p g Area (Enlarged Plan) X-xX Sheet where be enlarged DISC Disconnect maximize energy captured by the PV modules. The inverter also has an internal ground -- — section is located fault detection and interruption device that is set to disconnect the array in the event Keyed Notes.......... 1 Keyed note designation (E) Existing that a ground fault that exceeds one ampere should occur. The inverter has DC and AC on applicable sheet EL Elevation disconnect integrated system and labels are provided as required by the National PROJECT INSTALLER EQ Equal Electric Code Ground Terminal..... S U N P D ;LL JB Junction Box 1` Grounding Point/rod.... MCB Main Combiner Box Signat ire thidbiiy MFR Manufacturer PV Modules ....... signed by Ermocrates E Solar Panel....... or 00—Module with Source MIN Minimum Microinverters� Point of = `sJ Castillo Date: Circuit number Junction °--- ,•° MISC Miscellaneous Box ' utility 1. 0 2020.10.05 Combiner Box.......... CB Connection _ (N) New PROJECT NAME Utility Meter OCPD OverCurrent Protection Device DC Disconnect.......... DCD POCC Point Of Common Coupling When the sun is shining, power from the PV array is fed into the inverter, where co Main Distribution PV Photovoltaic it is converted from DC to AC. The inverter output is then used to contribute to the 0 w � M Panel ...................... MDP power requirements of the occupancy. If PV power meets the requirements of the Q U w _J SF squarefoot/feet loads of the occupancy, an remaining PV power is sold back to the utility. When utility J � Y g p Y• Y � w z Lu Fuse STC Standard Test Conditions power is available, but PV power is not available, building loads are supplied by the w — v TBD To Be Determined z (f, L w utility. TYP Typical The inverter meets the requirements of IEEE 1547 and UL 1741. This means that D � Overcurrent Breaker.. �� if it detects a loss of utility power, it will automatically disconnect from the utility. 0 0 Inverter.................... — VIF Verify In Field When utility voltage is restored, the inverter automatically reconnects to the utility grid WP Weather Proof after verifying utility voltage and frequency stability. On a day with average Florida sunshine, this system outputs 47.07 kWh per day Transformer............. on site. SHEET NAME SYMBOLS & SYSTEM Automatic............... ATS DESCRIPTION Transfer Switch SHEET SIZE ANSI B 11" X 17" SHEET NUMBER A-01 ARRAY & ROOF AREA MODULE TYPE, DIMENSIONS & WEIGHT GENERAL INSTALLATION PLAN NOTES: CaSt1110 CALC'S (ROOF #1) NUMBER OF MODULES=31 MODULES 1)ROOF ATTACHMENTS TO SEAM SHALL BE INSTALLED AS SHOWN Engineering ARRAY AREA=576.08 SQ. FT. MODULE TYPE = LG 9.68 L LG18.0 KG. (355W) MODULES IN SHEET S-02 AND AS FOLLOWS FOR EACH WIND ZONE: MODULE WEIGHT=39.68 LBS/ 18.0 KG. DESIGNED To PERMIT ROOF FACE AREA= 1764.74 SQ. FT. CASTILLO ENGINEERING 576.08/ 1764.74 = 32.64 % OF ROOF MODULE DIMENSIONS = 66.9"x 40.0"= 18.58 SF WIND ZONE 1: MAX SPAN V-10"O.C. - MAX CANTILEVER 0'-7" SERVICES, LLC FACE AREA COVERED BY ARRAY UNIT WEIGHT OF ARRAY=2.14 PSF COA k 2834s WIND ZONE 2: MAX SPAN V-1" O.C. - MAX CANTILEVER 0'-4" 2925 W.STATE ROAD 434, DESCRIPTION (ROOF #1) WIND ZONE 3: MAX SPAN 0'-8" O.C. - MAX CANTILEVER 0'-3"(DO SUITE 111 NOT INSTALL ENTIRE MODULE IN ZONE 3 DUE TO ALLOWABLE LONGWOOD,FL 32779 ROOF TYPE- METAL ROOF TEL(407)289-2575 ROOF TILT-26.6° MODULE PRESSURE BEING LOWER THAN THE ZONE PRESSURE) ERMOCRATESE.CASTILLO-FL RE5259° ROOF AZIMUTH - 180° SEE SHEET S-02 FOR SUPPORTING CALCULATIONS. COPYRIGHTED BY SEAM SPACING- 16"O.C. CASTILLO ENGINEERING 2) EXISTING RESIDENTIAL BUILDING IS A METAL ROOF WITH MEAN SERVICES,LLC ROOF HEIGHT 15 FT AND SEAM SPACED 16" O.C. EXISTING ROOF REVISIONS SLOPE FOR SOLAR SYSTEM RETROFIT IS 26.6 DEGREES. CONTRACTOR TO FIELD VERIFY AND SHALL REPORT TO THE DESCRIPTION DATE REV ENGINEER IF ANY DISCREPANCIES EXIST BETWEEN PLANS AND IN FIELD CONDITIONS. I CERTIFY THAT THE INSTALLATION OF THE MODULES IS IN COMPLIANCE WITH FBC: RESIDENTIAL CHAPTER 3. BUILDING STRUCTURE WILL SAFELY ACCOMMODATE LATERAL AND UPLIFT WIND LOADS AND EQUIPMENT DEAD LOADS. PROJECT INSTALLER (E) UTILITY METER 1" IMC, RMC, FMC, LFMC, PVC, S U N P R HDPE, NUCC, RTRC, LFNC, FMT, N ENT OR EMT CONDUIT RUN Iv W E Signs ure with Seal < (N)SOLADECK Q Digitally sign (Z by Ermocrat s z Q s ,;p Castillo oao Date: � � U 2020.10.05 W o Q 16:56:09-04' o W PROJECT NAME I(E) MAIN DISTRIBUTION PANEL a 40.0" (N)AC DISCONNECT N v Q00 00 Im (N) PV METER(IF REQUIRED) _ z W 0 co ZONE 1 (TYP.) Q U W J TJ J Z cry � WIND ZONE 2 (TYP.) � 0� Lu Z W w U WIND ZONE 3 (TYP.) 0 Lu 4'-0"TYP. tt LG NEON2: z Lu 0� a 130'-5" LG355N1C-N5 ROOF#1 U (N) ENPHASE IQ COMBINER BOX TILT-26.6° (355W) MODULES CD O AZIM.-180° 't LL 1W LEGEND � (N)(31) ENPHASE: IQ7PLUS-72-2-US UM - UTILITY METER MICROINVERTERS (N) UNIRAC LIGHT RAIL (TYP.) SD C A DISCON- SHEET NAME ACD -AC DISCONNECT (119) PV ROOF ATTACHMENT PM - PRODUCTION METER ROOF PLAN & @ 22" O.C. MAX MODULES ROOF#1 MDP - MAIN DISTRIBUTION PANEL (31)LG NEON2: LG355N1C-N5 SHEET SIZE (355W) MODULES O ❑ -VENT, ATTIC FAN (ROOF OBSTRUCTION) ANSI B O - PV ROOF ATTACHMENT 11" X 17" ROOF PLAN & MODULES --- -CONDUIT SHEET NUMBER S-01 SCALE: 1/16"= V-0" CB -COMBINER BOX S-01 130 120115 Castillo ( _ Solaffoot 115 139 Engineering Top (4x)01.26 156 120 ! DESIGNED TO PERMITV a a.l<. _ �`•^ „ar CASTILLO ENGINEERING pa.. LM "� .+ SERVICES, LLC w COA#28345 O4 150 140 IN = 140 2925 W.STATE ROAD 434, aea� SUITE 111 r have LONGWOOD,FL 32779 jj.32 TEL:(407)289-2575 lee 150 ERMOCRATES E.CASTILLO-FL PE 52590 anal Patented 140 COPYRIGHTED BY O -O " �++ CASTILLO ENGINEERING SERVICES,LLC 5� 160 14.67 ® Not... 150 as REVISIONS 0 1 1. Values er uM.I. drsi6n 3-secod gust wid speeds innailes per In... 170o"r (aye) at 33 d - DESCRIPTION DATE REV it (16�) above Round for E.posure c cat- Cory 7.34 ` . Iw 2. Linear interpolation between contours 160 is pe roitted. WI 12.67 3. 1:lands.nd °oast,l ar -id,the °m last Cant cor shall use the last wind speed 170 contour Of thr coastal Arta. 14.67 4. erl.- terrain, R«rR•. . promontories, and special wind reCioes shall br ..aatnrd for....on] wind.odi- aVv Back tiUn, 5. s"d speeds Correspond to appro.iaately 180 PROJECT INSTALLER Left Front Right a 7%pr°babiIity of.accedence in 50 years M8-1.25 Threaded Stud (annual Prb.oility =0.00143, MRl = 700 years). 2.68 SUNPR ._ 5.3 FIGURE 1609.30) 2.62 ULTIMATE DESIGN WIND SPEEDS, VULf.FOR RISK CATEGORY II BUILDINGS AND OTHER STRUCTURES nigitany 32 Signak e with al Wind Speed UIt(mph) 160 Roof Slope Calculator signed by Risk Category II Rise Run Slope(°) Ermocrate 5.55 2. Wind Speed ASD(mph) 130 6 12 1 26.6 '• _�� Castillo Factory Applied Exposure Category C $ ro ? Date: Butyl Seale Mean Roof Height(ft) 15 1' 2020.10.05 Roof Slope(degrees) 25 Maximum Uplift per*fastener A-- 4 3 164.7 Module Area(sg ft) 20 Wind Zone l _ ( 5h 1 KA 1 PROJECT General Notes: Height Adjustment Factor,X 1.21 Allowable Up Load of S-51 Solar 1. SolarFoot Foot when Attached into 170 Decking Only per S-51 Test 2. M8-1.25 Stainless Steel Hex Flange Nut (13mm Socket) s Reports 00 3. Metal to Metal:1/4-14 Self Drilling Screw 1-1/2"to 2-1/2" Roof Zone Pnet(30) *Roof attachementsw2 rails at: 22 in O/C Metal to Wood:1/4-14 Type 17 AB Milled Point 1-1/2" to 2-1/2" - = 1 16 27 z W 4. Example roof 2 16 44.6 Q ( ) W J 3 LL 16 67 Maximum Uplift per*fastener J z � Wind Zone 2 160.8 r✓ W Z w LL w U Allowable Up Load of S-5!Solar 0 M10-1.5x16 MM BOLT P_net=K K�_zt P_(net(30)) Foot when Attached into 170 z w w Decking Onlyper S-5.l Test(N)MID CLAMP (E)STANDING UNIRAC LIGHT RAIL Roof Zone Pnet Reports _ � SEAM ROOF (N)END CLAMP 1 19.36 -32.67 1 U) V 2 19.36 -53.966 *Roof attachements w 2 rails at: 13 in O/C Oq LL 3 19.36 -81.07 Cp Maximum Uplift per*fastener 148.6 Wind Zone 3 Allowable Up Load of S-5!Solar SHEET NAME S-5 SOLAR FOOT Foot when Attached into STRUCTURAL Decking Only per S-51 Test 170 ATTACHMENT 16"SEAM SPACE 2-1/4"X 2.5"LAG BOLTS Reports DETAILS 22"ZONE 1 (TYP.) *Roof attachements w 2 rails at: 8 in O/C SHEET SIZE 8"ZONE 3(TYP.) 13"ZONE 2(TYP.) ANSI B 11'E X 17" 1 ATTACHMENT DETAIL SHEET NUMBER S-02 SCALE: 1" = 1'-0" S-02 SOLAR ARRAY 11.005 kW-DC STC Castillo IIII (31)LG NEON2:LG355N1C-N5(355W)MODULES Engineering u7 (02)BRANCH OF 10 MODULES 'V ti ti ti ti ti ti ti ti ti DESIGNED TO PERMIT" CASTILLO ENGINEERING 1. SUBJECT PV SYSTEMS HAS BEEN DESIGNED TO MEET THE SERVICES,LLC COA#28345 Q CABLE REQUIREMENTS OF THE NEC 2014,AND THOSE SET FORTH BY 2925 W.STATE ROAD 434, THE FLORIDA SOLAR ENERGY CENTER CERTIFICATION, SUITE 111 INCLUDING MAXIMUM NUMBER OF MODULE STRINGS,MAXIMUM LONGWOOD,FL 32779 NUMBER OF MODULES PER STRING, MAXIMUM OUTPUT, ERMOCRATES E.CASTILLO?FL PE 52590 MODULE MANUFACTURER AND MODEL NUMBER,INVERTER COPYRIGHTED BY MANUFACTURER AND MODEL NUMBER, AS APPLICABLE. CASTILLO ENGINEERING 2. PROVIDE TAP BOX IN COMPLIANCE WITH 312.8 IF PANEL SERVICES,LLC GUTTER SPACE IS INADEQUATE. REVISIONS DESCRIPTION DATE REV ENPHASE:IQ7PLUS-72-2-US MICROINVERTERS PV MODULES I PROJECTINSTALLER I I TO UTILITY GRID S U N P R (N)SOLADECK G L2 -1 L2 Li L2 L1 600 V,NEMA 3R L1 L2 N UL LISTED BI-DIRECTIONAL G L2 Ll L2 Ll L2 -1 LINE TAP USING INSULATION UTILITY METER Signs urewlt ea PIERCING PER NEC 705.12(A) 0 1-PHASE,240V signed by Ermocrates Castillo (N)125A ENPHASE IQ COMBINER 3 (E)MAIN DISTRIBUTION PANEL, L1 L2 N Date: (3)12/2 ROMEX RUN IN ATTIC (X-IQ-AM1- 3)-3)[WITH UPTO(4)2-POLE (N)AC DISCONNECT:240V,60AMP, 200A RATED,240V 2020.1 0.05 (3)#1 AWG THWN-2-RED BREAKERS AND ENVOY (N)PV METER FUSED NEMA 3R,UL LISTED L1 L2 N _ 16:56:18 COMMUNICATION GATEWAY] (IF REQUIRED) WITH 60A FUSES PROJEC�jrd]tl (3)#12 AWG THWN-2-BLACK I ECG#6 AWG THWN-2 GND IN 1"IMC,RMC,FMC,LFMC, L1 L1 L1 L1 L1 PVC,HDPE,NUCC,RTRC, G LFNC,FMT,ENT OR EMT L2 L2 G G L2 L2 L2 0 0 CONDUIT RUN N N o N Na N Q oo 10A G - - — G G G G — (E)MAIN BREAKER z w z co _ 20OA/2P,240V Q (� w J �/i Z 0 LL 3)#12 AWG THWN-2-RED (3)#6 AWG THWN-2 L.1_ w Lz U ( I ( #1 AWG THWN-2-BLACK (3)#6 AWG LFMCTHWN-2 IN 1"PVC,IMC,RMC,FMC, ECG#6 AWG THWN-2 GND (1)#6 AWG THWN-2 GND ,HDPE,NUCC,RTRC, L1 L1 w 0 IN 1"IMC,RMC,FMC,LFMC, IN 1"PVC,IMC,RMC,FMC, LFNC,EMT,FMT RUN ENT L2 L2 z (n _LO W_ PVC,HDPE,NUCC,RTRC, LFMC,HDPE,NUCC,RTRC, W LFNC,FMT,ENT OR EMT LFNC,EMT,FMT,ENT V L1 _CONDUIT RUN CONDUIT RUN L2 U) C) (N)JUNCTION BOX p O 600 V,NEMA 3R L1 L1LL UL LISTED L2 L2 � 20A/2P L1 L1 L1 L2 L2 L2 N 20A'/2P G SHEET NAME L1 L1 L1 Lz L2 L2 ELECTRICAL 2ov2P LINE DIAGRAM L1 L1 jL2 L2 L2 EXISTING GROUNDING SHEET SIZE ELECTRODE SYSTEM L - - - - - G - - G - - - - - - G — ANSI B N G 11" X17" 1 ELECTRICAL LINE DIAGRAM SHEET NUMBER E-01 SCALE: NTS E-01 AC CONDUCTOR AMPACITY CALCULATIONS: AC CONDUCTOR AMPACITY CALCULATIONS: Castillo FROM ROOF TOP SOLADECKTO LOAD CENTER FROM AC COMBINER BOX TO MSP ELECTRICAL NOTES Engineering DESIGNED TO PERMIT" 1. ALL EQUIPMENT TO BE LISTED BY UL OR OTHER NRTL, AND CASTILLO ENGINEERING MODULE MANUFACTURER LG MO�I.ILG PROPERTIES LABELED FOR ITS APPLICATION. SERVICES,LLC MODULE MODEL L15355N1 C-VS VDC 41.5 1150 10.9 2. ALL CONDUCTORS SHALL BE COPPER, RATED FOR 600 V AND 90 2925 W.STATE ROAD 434, INVERTER MANUFACTURER ENPHASE VMPP 24.7 IMP 10.25 DEGREE C WET ENVIRONMENT. THE TERMINALS ARE RATED FOR SUITE 111 INVERTER MODEL ENPHASE 11j 7 PLUS TO VOC -0.26%/'0 TO VMP -0.34%/'0 LONGWOOD,FL 32779 MODULES/BRANCH CIRCUIT 1 1❑ PMP 255.0 NOCT 45 oC, 75 DEGREE C. TEL:(407)289-2575 MODULES/91RANCH CIRCUIT 2 10 3. THE WIRES ARE SIZED ACCORDING TO NEC 110.14. ERMOCRATES E.CASTILLO-FL PE 52590 MODULES/BRANCH CIRCUIT 9 11 4. WIRING, CONDUIT, AND RACEWAYS MOUNTED ON ROOFTOPS COPYRIGHTED BY CASTILLO ENGINEERING TOTAL ARRAY POWER (KW) 1 1.01 SHALL BE ROUTED DIRECTLY TO, AND LOCATED AS CLOSE AS SERVICES,LLC SYSTEM AC VOLTAGE 240V 1-PHASE POSSIBLE TO THE NEAREST RIDGE, HIP, OR VALLEY. INVERTER PROPERTIES 5. WORKING CLEARANCES AROUND ALL NEW AND EXISTING REVISIONS DESIGN TEMPERATURE OUTPUT VOLTAGE 240 L-L 1-PH ELECTRICAL EQUIPMENT SHALL COMPLY WITH NEC 110.26. DESCRIPTION DATE REV MIN. AMBIENT TEMP. 'F 32 MAX INPUT DC VOLTAGE 60 VDC MAX. AMBIENT TEMP. 'F 117 OPERATING RANGE 1 6 - 60 VDC 6. DRAWINGS INDICATE THE GENERAL ARRANGEMENT OF SYSTEMS. CALCULATED MAX. VDC 4� MPPT VOLTAGE RANGE 27 - 45 VDC CONTRACTOR SHALL FURNISH ALL NECESSARY OUTLETS, CALCULATED MIN VMP 27 START VOLTAGE 22 VDC SUPPORTS, FITTINGS AND ACCESSORIES TO FULFILL APPLICABLE CONDUIT FILL MAX aa0 woc CODES AND STANDARDS. INPUT POWER NUMBER OF CONDUITS 1 CONTINUOUS AC POWER 290 VA 7. WHERE SIZES OF JUNCTION BOXES, RACEWAYS, AND CONDUITS ARE NOT SPECIFIED, THE CONTRACTOR SHALL SIZE THEM AMPACITY CALCULTIONS ACCORDINGLY. PROJECT INSTALLER CIRCUIT MAX AMPS 1.25 X AWG 90 `C AMRIENTT TEMP CONDUIT FILL DERATED MAXIMUM CIRCUIT 8, ALL WIRE TERMINATIONS SHALL BE APPROPRIATELY LABELED MAX AMPS AMPACITY EMP 'F DERATE FILL DERATE AMPACITY BREAKER AND READILY VISIBLE. 23.04 9. MODULE GROUNDING CLIPS TO BE INSTALLED BETWEEN MODULE Ea CIRCUIT 1 1 2.1 1 5.1 #1 2 30 95 0.96 6 0.2 20 A U N P R��-w FRAME AND MODULE SUPPORT RAIL, PER THE GROUNDING CLIP CIRCUIT 2 12.1 1 5.1 #1 2 30 95 0.96 6 0.2 23.04 20 A MANUFACTURER'S INSTRUCTION. _ 23.04 10. MODULE SUPPORT RAIL TO BE BONDED TO CONTINUOUS COPPER Signa ire D"tally CIRCUIT 3 13.2 1 6.6 #1 2 30 95 0.96 6 0.2 20 A G.E.C. VIA WEEB LUG OR ILSCO GBL-4DBT LAY-IN LUG. signed by AC COMBINER 37.5 46.2 #6 75 95 3 1 72 A 11. THE POLARITY OF THE GROUNDED CONDUCTORS IS NEGATIVE . Ermocrates E PANEL OUTPUT 0.96 60 � e�� .v'm.m.:°' 12. UTILITY HAS 24-HR UNRESTRICTED ACCESS TO ALL "° �' =`� Castillo PHOTOVOLTAIC SYSTEM COMPONENTS LOCATED AT THE SERVICE «°p °`` Date: MAXIMUM CIRCUIT VOLTAGE DROP 2% ENTRANCE. 2020.10.05 13. MODULES CONFORM TO AND ARE LISTED UNDER UL 1703. 16:56:24-04' VOLTAGE DROP CALCULATIONS 14. RACKING CONFORMS TO AND IS LISTED UNDER UL 2703. _ PROJECT NAME CIRCUIT AWG 1 V CIRCULAR MAX 15. CONDUCTORS EXPOSED TO SUNLIGHT SHALL BE LISTED AS MILLS LENGTH SUNLIGHT RESISTANT PER NEC ARTICLE 300.6 (C) (1)AND ARTICLE CIRCUIT 1 #1 2 6530 12.1 240 1❑1 FEET 310.10 (D). CIRCUIT 2 #1 2 6530 12.1 240 1❑1 FEET 16. CONDUCTORS EXPOSED TO WET LOCATIONS SHALL BE SUITABLE CIRCUIT 3 #1 2 6530 12.2 240 91 FEET Q COMBINER PANEL OUTPUT #6 26240 37.5 240 130 FEET FOR USE IN WET LOCATIONS PER NEC ARTICLE 310.10 (C). 0 00 z W [If It M NOTES < Uj J U TEMP DERATE BASED ON NEC TABLE 310.1 5(B)(2)(A) J Z 0 � CONDUIT FILL DERATE BASED ON NEC TABLE 310.1 5(B)(3)(A) 1(Ilf W w ILL! MAXIMUM VOC CALCULATED USING MODULE MANUFACTURE TEMPERATURE COEFFICIENTS PER NEC 690.7(A) W 0 � ��•/ UNLESS OTHERWISE SPECIFIED, ALL WIRING MUST BE THHN OR THWN-2 COPPER ENPHASE IQ7PLUS-72-2-US MICROINVERTER 0 v5 w ALL WIRE SIZES LISTED ARE THE MINIMUM ALLOWABLE Input Data(DC) Z W IN ANY CELL INDICATES THAT THE SYSTEM IS SAFE AND COMPLIES WITH NEC REQUIREMENTS D ( T IN ANV CELL INDICATES A POTENTIALLY UNSAFE CONDITION Recommended Input Power(STC) 235-44OW+ 'A 1'` INFORMATION INPUT BY SYSTEM DESIGNER Maximum Input DC Voltage 60V v, C) O INFORMATION OBTAINED FROM MANUFACTURER DATASHEETS "4- LL. Peak Power Tracking Voltage 27V-45V Operating Range 16V-60V Min./Max. Start Voltage 22V/60V Max DC Short Circuit Current 15A SHEET NAME Output Data(AC) WIRING I ERMOCRATES CASTILLO PE# 52590 AN ENGINEER Maximum Output Power 290W CALCULATIONS LICENSED PURSUANT TO CHAPTER 471, CERTIFY THAT THE PV ELECTRICAL SYSTEM AND ELECTRICAL Nominal Output Current 1.21A SHEET SIZE COMPONENTS ARE DESIGNED AND APPROVED USING Nominal Voltage/Range 240V/211-264V ANSI B THE STANDARDS CONTAINED IN THE MOST RECENT VERSION OF THE FLORIDA BUILDING CODE. FBC 107. Nominal Frequency/Range 60 Hz 1 111 X 17" Extended Frequency/Range 47-68 Hz Power Factor at rated power 1.0 SHEET NUMBER Maximum unit per 20A Branch Circuit 13(240 VAC) E-02 Castillo A WARNINGA PHOTOVOLTAIC SYSTEM AC DISCONNECT _ Engineering ELECTRIC SHOCK HAZARD RATED OPERATING' ' ' SOLAR PV SYSTEM EQUIPPED PPED Q DESIGNED TO PERMITa DO NOT TOUCH TERMINALS AC NOMINALOPERATING VOLTAGE • CASTILLO ENGINEERING TERMINALS ON BOTH LINE AND WITH RAPID SHUTDOWN SERVICES, LLC COA#28345 LOAD SIDES MAY BE ENERGIZED LABEL LOCATION: 2925 W.STATE ROAD 434, IN THE OPEN POSITION AC DISCONNECT,POINT OF INTERCONNECTION SUITE 111 LABEL LOCATION: (PER CODE:NEC690.54) LONEWOO)289235779 AC DISCONNECT,POINT OF INTERCONNECTION ERMOCRATES E.CASTILLO'FL PE 52590 PER CODE:NEC 690.17(E),CB WARNING COPYRIGHTED BY INVERTER OUTPUT CONNECTION • NOT TURN RAPID SHUTDOWN CASTILLO ENGINEERING PHOTOVOLTAIC SWITCH TO THE "OFF" SOLAR ELECTRIC SERVICES,LLC - • • - • RELOCATE THIS OVERCURRENT DEVICEPV PANELS POSITION TO SHUTDOWN REVISIONS LABEL LOCATION: LABEL LOCATION: PV SYSTEM AND REDUCE DESCRIPTION DATE REV CONDUIT,COMBINER BOX POINT OF INTERCONNECTION ( (PER CODE:NEC 705.12(D)(7)) SHOCK HAZARD IN THE PER CODE:NEC690.31(G)(3)(4)&NEC 690.13(G)(4) [Not required if panelboard is rated not less than sum of ampere ratings ARRAY ,&WARNING DUAL POWER SOURCE of all overcurrent devices supplying it] SECOND SOURCE IS PHOTOVOLTAIC SYSTEM DATA PER PANEL LABEL LOCATION: NOMINAL OPERATING AC VOLTAGE240 POINT OF INTERCONNECTION LABEL LOCATION: PROJECT INSTALLER (PER CODE:NEC 705.12(D)(4)) NOMINALOPERATING AC FREQUENCY- 60 AC DISCONNECT, POINT OF INTERCONNECTION (PER CODE: NEC 690.56(C)(1)(a), IFC 605.11.3.1(1) ADHESIVE FASTENED SIGNS: MAXIMUM AC •WER- 290 S U N P R• . •THE LABEL SHALL BE SUITABLE FOR THE ENVIRONMENT WHERE IT IS INSTALLED. 1.21 •WHERE REQUIRED ELSEWHERE IN THIS CODE,ALL FIELD APPLIED LABELS,WARNINGS,AND MARKINGS SHOULD COMPLY WITH ANSI Z535.4[NEC 110.21(B)FIELD MARKING]. MAXIMUM OVERCURRENT DEVICE PLATING20 Sign*.:ureb"Ily Sig •ADHESIVE FASTENED SIGNS MAY BE ACCEPTABLE IF • • PROTECTIONby ErmOCrdte PROPERLY ADHERED.VINYL SIGNS SHALL BE WEATHER RESISTANT[IFC 605.11.1.31 ............. E Castillo LABEL LOCATION: m- Date: ®• COMBINER BOX o 2020.10.05 (PER CODE:NEC690.52) _ 16:56:28-041 LABEL LOCATION: PROJECT NAME POINT OF INTERCONNECTION (PER CODE:NEC 705.12(D)(4)) AC , • NNECT LABEL LOCATION: AC DISCONNECT,POINT OF INTERCONNECTION Q OD SOLAR • • (PER CODE:NEC 690.54) O� LINE SIDE T` - (ifz W M z LABEL LOCATION: J z W LL POINT OF INTERCONNECTION PHOTOVOLTAIC (PER CODE:NEC 705.12(D)(4)) (If w Z W SYSTEM LLI MICI— . • 0 U) L w EQUIPPEDPHOTOVOLTAIC SYSTEM LOCATED UNDER EACH z w 131� F, - PV MODULED jj� _ (n U � SHUTDOWN ROOF TOP ARMY op LABEL LOCATION: LABEL LOCATION: LL AC DISCONNECT,DC DISCONNECT,POINT OF INVERTER INTERCONNECTION (PER CODE:NEC 690.53) (PER CODE:NEC 690.56(C)) 11.005 KW SOLAR SHEET NAME DISCONNECT • ` AC COMBINER BOX LABEL LOCATION: SYSTEM AC DISCONNECT,POINT OF INTERCONNECTION LABELING LABEL LOCATION: (PER CODE:NEC 690.54) COMBINER BOX (PER CODE:NEC 690.52) SHEET SIZE ANSI B 11" X 17" SHEET NUMBER E-03 Castillo Engineering DESIGNED TO PERMIT" CASTILLO ENGINEERING LG N ONO2 SERVICES,LLC LG NeONO2 SUITE 11 2925 W.STATE ROAD 434, SUITE 111 LONGWOOD,FL 32779 TEL:(407)289-2575 •� LG360N1C-NS LG:355N1C-NS LG350N1C-N5 ERMOCRATESE.CASTILLO-FL PE52590 COPYRIGHTED BY CASTILLO ENGINEERING General Data Electrical Properties STC* SERVICES,LLC Cell Properties(Material/Type) Monocrystalline/N-type Model I LG36ONX-N5 LG355N1C-NS LG350NiC-N5 Cell Maker LG Maximum Power(Pmax) [W] 360 355 3.90 REVISIONS 3 6 0 W C. 5 5 W 3 5 0 W Nu ber Configuration 60 Cells(6 x 10) MPP Voltage(Impp) [A] 0.2 0.2 0.2 Number of Busbars 12EA MPP Current(Impp) [A] 10.28 10.25 10.22 4.3 DESCRIPTION DATE REV Module Dimensions(L x W x H) 1,700mm x 1,015mm x 40 mm Open Circuit Voltage(Voc,t 5%) [V] 41.6 41.5 41.4 Weight 18.0 kg Short Circuit Current(Isy 15%) [A] 10.84 10.80 10.76 Glass(Material) Tempered Glass with AR Coating Module Efficiency [%] 20.8 20.6 20.3 Backsheet(Color) White Power7blerance [%] 0- 3 *STC(Standard Test Condition):Irradiance 1000 W/W,Cell temperature 25°C,AM 1.5, The LG NeONO 2 is one of the most powerful and versatile modules on the mar- Frame(Material) Anodized Aluminium Measurement Tolerance of Pmax:t 3% ket today.Featuring LG's Cello Technology in monocrystalline n-type solar cells, Junction Box(ProtectionDegree) IP68 with 3 Bypass Diodes the LG NeONO 2 increases power output.Now includes a 25 years product and Cables(Length) 1,000 mm x 2EA Operating Conditions 90.1%performance warrant for higher performance and reliability. Connettcr(rype/Maker) MC4/MC Operating Temperature rc] -40-+90 PROJECT INSTALLER P Y 9 P Y Maximum System Voltage N] 1000(IEC) The new LG NeONO 2 has been designed with aesthetics in mind using new cell Maximum Series Fuse Rating [A] 20 Certifications and Warranty Mechanical Test [Pa 5,400/113 design. (Front) [ P fl IEC 61215-1/-1-1/2:2016,IEC 61730-1/2:2016 Mechanical Test Load'(Rear) [Pa/ sf] 4,000/84 � Certifications ISO 9001,ISO 14001,ISO 50001 'Based on IEC 61215-2:2016(Test Load-Design Load x Safety Factor(1.5)) ::i ' OHSA518001 m Mechanical Ten Loads 5,000Pa/SADOPa based on IEC 61215:2005 U N P R .- ON Salt Mist Corrosion Test IEC 61701:2012 Severity 6 O osa�o Packaging Configuration (/� ® Ammonia Corrosion Test IEC 62716:2013 (i' D E L US Hail Test 25mm 1" Class er at 23 ) 52 mph) Number of Modules per Pallet [EA] 5 --'•- ( ) ( P) Signature with Seal Fire Rating Class C(UL 790) Number of Modules per 40k HQ Container [EA] 650 -♦,• Packaging Box Dimensions(L x W x H) [mm] 1.750 x 1.120 x 1,221 Solar Module Product Warranty 25 Years Packaging Box Gross Weight [kg] 464 Solar Module Output Warranty Linear Warranty* -1)Firstyear:98%2)After1Styear:0.33%annualdegradation,3)90.1%for25years Dimensions(mm/inch) ♦♦ '. Temperature Characteristics NMGP.- ['c] 4233 i 76.0/s.4 Pmax [°' 1 -0.26 SeTe.oiae.+ ,.,.., ♦ . ' ISE [%/+C] 0.03 o,aF-0 He oa B8 �ns,oie.e +o.o ns' PROJECT NAME Iin [%/°Q 0.03 uo„no,",ei,re xo ' 'NMOT(Nominal Module Operating Temperature)Irradiance 800 W/m',Ambient temperature 20°C, cioa Hoias ^ Wind speed 1 m/s,Spectrum AM 1.5 ' Electrical Properties(NMOT) cola L a Model LG360NiC-NS LG355NiC-NS LG350N1C-NS < r Maximum Power(Pmax) [W] 270 266 1 263 0oo f MPP Voltage(Vmpp) [V] 33.0 32.6 32.2 r r Q N MPP Current(Impp) [A] 8.20 8.17 8.15 mt mtY q LL ^7 os Open Circuit Voltage Noc) [V] 39.2 39.1 39.0 Z z' ` �a short circuit Current(Isc) [A] 8.71 8.68 8.64 8 s 8 q < v W J LL I-V Curves w W U 12,0 _ l000w 10.0 = � (n L W_ w m e a Z w 8.0 a 600w v) C)d 6.0 C) Feature iJ 40Dw O 4,0 � Enhanced Performance Warranty Enhanced Product warranty 2 zoow.0 - 25y LG Wi NeON° 2 has an enhanced performance LG has extended the warranty of the NeONO 2 0.0 - �- warranty. After 25 years,LG NeONO 2 is guar- to 25 years,which is among the top of industry 00 100 20.0 300 40.0 anteed to perform at minimum 90.1%of initial standards. Voltage(VI SHEET NAME performance. LG Electronics Inc. Product specifications are subject to change without notice. 2!TA 2 DATA SHEET Energy Business Division DS-NS-60-C-G-F-EN-200507(OLIG LG Twin Towers,128 Yeoui-daem,Yeongdeungpo-gu,Seoul About LG Electronics 07336,Korea C 2020 LG Electronics.All rights reserved. Lifes Good ❑M LG Electronics is a global big player,committed to expanding its operations with the solar market.The company first embarked on a solar energy source research program �� www.lg-solarcom SHEET SIZE in 1985,supported by LG Group's vast experience in the semi-conductor,LCD,chemistry and materials industries.In 201 Q LG Solar successfully released its first MonoX® series to the market,which is now available in 32 countries.The NeONe(previous.MDnoX*NeON),NeONO2,NeON®2 BiFacial won the 9ntersolar AWARD"in 2013,2015 (9ANSI B and 2016,which demonstrates LG Solar's lead,innovation and commitment to the industry 11" X 17" SHEET NUMBER DS-01 Castillo Engineering DESIGNED TO PERMIT" LGElectronicslnc. CASTILLO ENGINEERING LG SERVICES,LLC 128, Yeoui-daero, Yeongdeungpo gu COA#28345 Seoul,Republic of Korea 2925 W SUITE STATE,11 ROAD 434, Life's Good LONGWOOD,FL 32779 TEL:(407)289-2575 ERMOCRATES E.CASTILLO-FL PE 52590 Ju108,2020 COPYRIGHTED BY CASTILLO ENGINEERING SERVICES,LLC To whom it may concern, REVISIONS DESCRIPTION DATE REV RE: Confirmation letter for Mechanical Load This letter hereby states that LG Electronics Inc. ("LGE")confirms the following 2 cases. 1.2 Rail Mounting system LG supports and provides warranty for the referenced LG modules which have been mounted by the 2 PROJECT INSTALLER Rail Mounting system refer to the installation scene (Fig.1) for the test load of 6,000 Pa downforce and 5,400 Pa uplift under the test conditions based on IEC 61215:2005. I'al S U N P R System Installation Scene(Picture) Down force Uplift 200-400mm Signature with Seal 2 Rail 6,000 Pa 5,400 Pa Mounting • Under the test conditions based on 1EC 61215-2:2016, the test load may be different. The following LG Solar modules are approved for warranty: PROJECT NAME LG Model Number LG Model Number LGxxxN1C-V5 LGxxxN1K-V5 200-400mr„ LGxxxQ1C-V5 LGxxxQ1K-V5 i ¢O rn LGxxxN1C-N5 LGxxxN1K-LS <Fig.l> z W JU z � Z u LL LU Our warranty provides all the terms and conditions underlying our obligations and the warranty. Although this W 0 W 0 Letter serves as an authorization to employ the 2 Rail Mounting System, the original warranty terms for the 0 Fn L W modules would be rescinded in the event of: Z W (]� - -Misuse,abuse,neglect,or accident such as micro crack to the cells or glass damages; _ -Alteration, improper installation or application; U U O� -Non-observation of LG Electronics' installation and maintenance instructions; U_ -Repair or modifications by someone other than an approved an approved technician of LG; -Power failure surges,lightening,fire or other event outside LG Electronics' control; -Defect or Power drop due to the incline load; SHEET NAME DATA SHEET SHEET SIZE ANSI B 1111 X 17" SHEET NUMBER DS-02 Castillo Engineering DESIGNED TO PERMIT" CASTILLO ENGINEERING SERVICES,LLC COA#28345 Data sheet Enphase IQ 7 and IQ 7+ Microinverters 2925W SUTEE1ROAD434, 11 Enphase Microinverters LONGWOOD,FL32779 Region:US INPUT DATA(DC) IQ7-60-2-US IQ7PLUS-72-2-US TEL:.CASTILLO ) ERMOCRATES 75 1 (07)289-2-FL PE 52590 Commonly used module pairings' 235 W-350 W+ 235 W-440 W+ COPYRIGHTED BY Module compatibility 60-cell PV modules only 60-cell and 72-cell PV modules CASTILLO ENGINEERING Maximum input DC voltage 48 V 60 V SERVICES,LLC Peak power tracking voltage 27 V-37 V 27 V-45 V Operating range 16 V-48 V 16 V-60 V REVISIONS The high-powered smart grid-ready Min/Max start voltage 22 V/48 V 22 V/60 V DESCRIPTION DATE REV Enphase Enphase IQ 7 MicroT"and Enphase IQ 7+Micro' Max DC short circuit current(module Isc) 15 A 15 A Overvoltage class DC port II II Q7 and IQ 7+ dramatically simplify the installation process while DC port backfeed current 0 A 0 A achieving the highest system efficiency. PV array configuration 1 x 1 ungrounded array;No additional DC side protection required; M i e ro i nve irte rs AC side protection requires max 20A per branch circuit Part of the Enphase IQ System,the IQ 7 and OUTPUT DATA(AC) IQ 7 Microinverter IQ 7+Microinverter IQ 7+Microinverters integrate seamlessly with Peak output power 250 VA 295 VA PROJECT INSTALLER the Enphase IQ EnVOyT",Enphase Q Aggregator'" Maximum continuous output power 240 VA 290 VA Nominal ll voltage/range2 240 V/ 208 V/ 240 V/ 208 V/ Enphase IQ Battery'",and the Enphase Enlighten'" 211-264V 183-229V 211-264V 183-229V monitoring and analysis software. Maximum continuous output current 1.0 A 1.15 A 1.21 A 1.39 A Nominal frequency 60 Hz 60 Hz IQ Series Microinverters extend the reliability Extended frequency range 47-68Hz 47-68Hz standards set forth by previous generations and AC short circuit fault current over 3 cycles 5.8 Arms 5.8 Arms Signature with Seal undergo over a million hours of power-on testing, Maximum units per 20 A(L-L)branch circuit' 16(240 VAC) 13(240 VAC) g p g, 13(208 VAC) 11(208 VAC) enabling Enphase to provide an industry-leading Overvoltage class AC port III III warranty of up to 25 years. AC port backfeed current 0 A 0 A Power factor setting 1.0 1.0 Power factor(adjustable) 0.7 leading...0.7 lagging 0.7 leading...0.7 lagging EFFICIENCY @240 V @208 V @240 V @208 V Peak CEC efficiency 97.6% 97.6% 97.5% 97.3 PROJECT NAME Easy to Install CEC weighted efficiency 97.0% 97.0% 97.0% 97.0% MECHANICAL DATA IQ 7 Microinverter Lightweight and simple Ambient temperature range -400C to+650C • Faster installation with improved,lighter two-wire cabling Relative humidity range 4%to 100%(condensing) 0 Built-in rapid shutdown compliant(NEC 2014&2017) Connectortype MC4(or Amphenol H4 UTX with additional Q-DCC-5 adapter) O oo Dimensions(WxHxD) 212 mm x 175 mm x 30.2 mm(without bracket) Weight 1.08 kg(2.38 Ibs) W Z M Productive and Reliable Z Cooling Natural convection-No fans Q l; ) W J Optimized for high powered 60-cell and 72-cell*modules Approved for wet locations Yes J z U) LL More than a million hours of testing Pollution degree PD3 (31f W Z LU d Class II double-insulated enclosure Enclosure Class II double-insulated,corrosion resistant polymeric enclosure w 0 L UL listed Environmental category/UV exposure rating NEMA Type 6/outdoor F (_n W FEATURES z w m Communication Power Line Communication(PLC) _ ' Smart Grid Ready Monitoring Enlighten Manager and MyEnlighten monitoring options. U U Complies with advanced grid support,voltage and Both options require installation of an Enphase IQ Envoy. O O frequency ride through requirements Disconnecting means The AC and DC connectors have been evaluated and approved by UL for use as the load-break LL o disconnect required by NEC 690. Remotely updates to respond to changing grid requirements Compliance CA Rule 21(UL 1741-SA) UL 62109-1,UL1741/IEEE1547,FCC Part 15 Class B, ICES-0003 Class B, Configurable for varying grid profiles CAN/CSA-C22.2 NO.107.1-01 Meets CA Rule 21 (UL 1741-SA) This product is UL Listed as PV Rapid Shut Down Equipment and conforms with NEC-2014 and NEC-2017 section 690.12 and C22.1-2015 Rule 64-218 Rapid Shutdown of PV Systems,for AC SHEET NAME and DC conductors,when installed according manufacturer's instructions. U *The IQ 7+Micro is required to support 72-cell modules. DATA SHEET 1.No enforced DC/AC ratio.See the compatibility calculator at bttps://enphase.com/en-us/su000rt/module-comoatibility. 2.Nominal voltage range can be extended beyond nominal if required by the utility. 3.Limits may vary.Refer to local requirements to define the number of microinverters per branch in your area. ® O'�' E N P H AS E To learn more about Enphase offerings,visit enphase.com E N P H AS E SHEET SIZE To learn more about Enphase offerings,visit enphase.com `/ V @ 2018 Enphase Energy.All rights reserved.All trademarks or brands used are the property of Enphase Energy,Inc. ANSI I C+I B 2018-02-08 A V J 1111 X 17" SHEET NUMBER DS-03 Castillo Engineering DESIGNED TO PERMIT" CASTILLO ENGINEERING SERVICES,LLC COA#28345 2925 W.STATE ROAD 434, SUITE 111 LONGWOOD,FL 32779 07) Data Sheet Enphase IQ Combiner 3 TEL89-2575 Enphase Networking ERMOCRATES E..C CASASTILLO-FL PE 52590 MODEL NUMBER COPYRIGHTED BY IQ Combiner 3 X-IQ-AM7-240-3 IQ Combiner 3 with Enphase IQ Envoy-printed circuit board for integrated revenue grade PV CASTILLO ENGINEERING production metering(ANSI C12.20+/-0.5%)and optional*consumption monitoring(+/-2.5%). SERVICES,LLC ACCESSORIES and REPLACEMENT PARTS(not included,order separately) REVISIONS Enphase Mobile Connect' CELLMODEM-03(413/12-year data plan) Plug and play industrial grade cellular modem with data plan for systems up to 60 DESCRIPTION DATE REV CELLMODEM-01(3G/5-year data plan) microinverters.(Available in the US,Canada,Mexico,Puerto Rico,and the US Virgin Islands, CELLMODEM-M1(413 based LTE-M/5-year data plan) where there is adequate cellular service in the installation area.) Enphase The Enphase IQ Combiner 3T"with Enphase Consumption Monitoring*CT CT-200-SPLIT Split core current transformers enable whole home consumption metering(+/-2.5%). IQ Envoy'"consolidates interconnection Circuit Breakers Supports Eaton BR210,BR215,BR220,BR230,BR240,BR250,and BR260 circuit breakers. IQ (Combiner 3 into a single enclosure and BRK-10A-2-240 Circuit breaker,2 pole,10A,Eaton BR210 equipment g BRK-15A-2-240 Circuit breaker,2 pole,15A,Eaton BR215 (X-IQ-AM1-240-3) streamlines PV and storage installations by BRK-20A-2P-240 Circuit breaker,2 pole,20A,Eaton BR220 EPLC-01 Power line carrier(communication bridge pair),quantity 2 PROJECT INSTALLER providing a consistent,pre-wired solution for XA-PLUG-120-3 Accessory receptacle for Power Line Carrier in IQ Combiner 3(required for EPLC-01) residential applications. It offers up to four XA-ENV-PCBA-3 Replacement IQ Envoy printed circuit board(PCB)for Combiner 3 - 2-pole input circuits and Eaton BR series ELECTRICAL SPECIFICATIONS 1''''' Rating Continuous duty U N P R��-w busbar assembly. System voltage 120/240 VAC,60 Hz Eaton BR series busbar rating 125 A Signature with Seal Max.continuous current rating(output to grid) 65 A Max.fuse/circuit rating(output) 90 A Branch circuits(solar and/or storage) Up to four 2-pole Eaton BR series Distributed Generation(DG)breakers only(not included) Max.continuous current rating(input from PV) 64 A Smart Max.total branch circuit breaker rating(input) 80A of distributed generation/90A with IQ Envoy breaker included Production Metering CT 200 A solid core pre-installed and wired to IQ Envoy Includes IQ Envoy for communication MECHANICAL DATA PROJECT NAME and control Dimensions(WxHxD) 49.5 x 37.5 x 16.8 cm(19.5"x 14.75"x 6.63").Height is 21.06"(53.5 cm with mounting brackets). - t Flexible networking supports.Wi-Fi, © ( 1 Ethernet,or cellular Weight 7.5 kg(16.5 lbs) _ Optional AC receptacle available for PLC Ambient temperature range -400 C to+461 C(-400 to 1150 F) I bridge Cooling Natural convection,plus heat shield Q DD • Provides production metering and optional Enclosure environmental rating Outdoor NRTL-certified NEMA type 3R of carbonate construction P 3 P 9 YP .P Y O rn consumption monitoring Wire sizes 20 A to 50 A breaker inputs: 14 to 4 AWG copper conductors [If It 60 A breaker branch input: 4 to 1/0 AWG copper conductors z W �`1 Main lug combined output: 10 to 2/0 AWG copper conductors Q U W J p Simple Neutral and ground: 14to 1/0 copper conductors J 7 LU LL W / Always follow local code requirements for conductor sizing. n�// L tF" >. I\ Reduced size from previous combiner Altitude To 2000 meters(6,560 feet) L 1— W Z W " • 1 Centered mounting brackets support single INTERNET CONNECTION OPTIONS w 0 LU _ L vstud mounting Integrated Wi-Fi 802.11b/g/n v! _L LLI _ +•ram 1 Supports back and side conduit entry 7 Ethernet Optional,802.3,Cat5E(or Cat 6)UTP Ethernet cable (not included) 7 W T Up to four 2 pole branch circuits for 240 VAC Cellular Optional,CELLMODEM-01(3G)or CELLMODEM-03(4G) or CELLMODEM-M1(4G based LTE-M) _ plug-in breakers(not included) (not included) U) U 80 A total PV or storage branch circuits COMPLIANCE p LL Compliance,Combiner UL 1741 QO CAN/CSA C22.2 No.107.1 IZI- Reliable 47 CFR,Part 15,Class B,ICES 003 Production metering:ANSI C12.20 accuracy class 0.5(PV production) Durable NRTL-certified NEMA type Compliance,IQ Envoy UL 60601-1/CANCSA 22.2 No.61010-1 3R enclosure — CU Consumption monitoring is required for Enphase Storage Systems. SHEET NAME J\ Five-year warranty UL listed DATA SHEET To learn more about Enphase offerings,visit enphase.com LISTED O:N E N P H A S E 02018 Enphase Energy.All rights reserved.All trademarks or brands in this document are registered by their respective owner. E N P H A S E To learn more about Enphase offerings,visit enphase.com `/ 2018-09-13 SHEET SIZE ANSI B 1111 X 17" SHEET NUMBER DS-04 Castillo Engineering DESIGNED TO PERMIT" CASTILLO ENGINEERING SERVICES, LLC COA#28345 2925 W.STATE ROAD 434, SUITE 111 LONGWOOD,FL 32779 TEL(407)289-2575 ERMOCRATES E.CASTILLO-FL PE 52590 COPYRIGHTED BY 14" BOLT LOCATION CASTILLO ENGINEERING SERVICES,LLC REVISIONS /'P�f DESCRIPTION DATE REV W/ PROJECTINSTALLER 1 11/C11 VV SUNPR�.��� 3/8" BOLT LOCATION Signature with Seal PROJECT NAME Q oo Z W c''' JU z —j Z u LL LU PART # TABLE W 0 L P/N DESCRIPTION LENGTH Z W U) a- 315168M SM LIGHT RAIL 168" MILL 168" D (]f U F 315168D SM LIGHT RAIL 168" DRK 168" 0 op -4- LL 315240M SM LIGHT RAIL 240" MILL 240" (.° IZI- 315240D SM LIGHT RAIL 240" DRK 240" SHEET NAME ■■�� U N I ��� PRODUCT LINE: SOLARMOUNT DRAWING NOT TO SCALE CD DIMENSIONS ARE N DATA SHEET ■■ DRAWING TYPE: PART DETAIL NOMINAL a 1411 BROADWAY BLVD. NE ' SHEET SIZE 01 ALBUQUERQUE, NM 87102 USA DESCRIPTION: LIGHT RAIL PRODUCT PROTECTED BY c ANSI B PHONE; 505.242.6411 ONE OR MORE US PATENTS WWW.UNIRAC.COM REVISION DATE: 9/11/2017 LEGAL NOTICE SHEET 11" X 17" SHEET NUMBER DS-05 Castillo III Engineering DESIGNED TO PERMITV CASTILLO ENGINEERING SolarFoot SERVICES, LLC COA#28345 Top [8m m] 2925 W.STATE ROAD 434, SUITE 111 LONGWOOD,FL 32779 (4x)0.315 i n TEL:(407)289-2575 ERMOCRATES E.CASTILLO-FL PE 52590 COPYRIGHTED BY CASTILLO ENGINEERING I I SERVICES,LLC -+- - + - REVISIONS 2.00in I Ong DESCRIPTION DATE REV 1.50in (D I Patmkd 1.00in -O- -O_ 1.39in .SOin I I 3.67in PROJECT INSTALLER .50in Scale 2:3 1.83in S U N P R 3.17in Signature with Seal 3.67in Back Left Front Right M8-1.25 Threaded Stud PROJECT NAME [17mm] .67in 1.32in a0 rn bbin alf .32in z W-11 r------I co Z J J z cw fl� W z Lu 1.39in 2, WLQ Q Factory Applied FOR STANDING SEAM SPECIFIC MECHANICAL LOAD TEST z � L w Butyl Sealant 1 INFORMATION AND CLAMP INSTALLATION INFORMATION � � V � PLEASE VISIT: WWW.S-5.COM 0 3, � o 4. MATERIAL: LL 6005A T61 Al ' METAL ROOF INNOVATIONS,LTD. � General Notes: 8655TABLE BUTTERD EST ASSEMBLY WEIGHT: S .. COLORADO SPRINGS,CO 80908 1 . SolarFoot 0.2481bs The Right Way! 719-495-0518 719-495-0045(FAX) SHEET NAME S SUPPLIED HARDWARE: 2. M8-1 .25 Stainless Steel Hex Flange Nut (13mm Socket) s s M8-1.25 Hex Flange Nut TITLE SolarFoot [CCD] DATA SHEET 3. Metal to Metal:l /4-14 Self Drilling Screw 1 -1 /2" to 2-1 /2" SCALE: DRAWING NO. DRAWN BY DATE Metal to Wood:] /4-14 Type 17 AB Milled Point 1 -1 /2" to 2-1 /2 23 LP66A-0A Paul Leitch 09�20�20,7 17\I � EST.WEIGHT: SHEET SIZE 4. Example roof VVY Bracket:0.129 Ibs S-5!9 PRODUCTS ARE PROTECTED BY MULTIPLE U.S.AND FOREIGN PATENTS. ANSI B Fastener: 0.026 Ibs VISIT OUR WEBSITE AT W W W.S-S.COM FOR COMPLETE INFORMATION ON PATENTS AND TRADEMARKS. NDt:0.015lbs 11" X 1 7" SHEET NUMBER DS-06