Loading...
HomeMy WebLinkAboutBlower door testEnvelope Leakage Test Report (Blower Door Test) Residential Prescriptive, Performance or ERI Method Compliance 2017 Florida Building Code, Energy Conservation, 6th Edition jurisdiction: Permit #: quo Address: ��� �e4N f \ Unit: City: roF 6 1' �Qw� State: Zip: 5 1 Ail" Leakage Test Results passing results must meet either the Performance, Prescriptive, or ERI Method PRSCRIPTIV M�TH(JD»The building or dwelling unit shall betested and verified as having an air leakage rate of not exceeding 7 air changes per, hour at a pressure of 0.2 inch w.g. (50 pascals) in Climate Zones 1 and 2. 1.P1Hf1O» The bu1ldin6 or dwelling unit shall be tested and verified as having an air leakage rate of not exceeding the selected ACH(50) value, as shown on FORM R40S-2017 (Performance) or R40&2017 (ERI), section labeled as Infiltration, sub -section ACH. ACH(50) specified on Form R405-2017-Energy Calc (Performance) or R406-2017 (ERI); X 60 _ Method for calculating building volume: CFM(50) Building Volume ACH(50) 0 Retrieved from architectural plans ZPASS El FAi L 0Cod 'e software calculated Q When ACH(50) is less than 3, Mechanical Ventilation installation must be verified by building department. O Field measured and calculated T�stin�.-Testing shall be conducted in accordance with AN51/RESNET/ICC 380 and reported at a pressure ar 0.2 inche w.g. (50 Pascals}, Testing shall be Conducted by either individuals as defined in Section 553,993(5) or (7), Florida Statues, or individuals licensed as set forth in Section 489.105(3)(f), (g), or (i) or an approved third party. A written report of the results of the test shall be signed bythe 'party conducting the test and provided to the code official, Testing shall be performed at any time after creation of all penetrations of the building thermal envelope. During testing: 1.Exterior windows and doors, fireplace and stove doors shall be closed, but not sealed, beyond the intended weatherstripping or other infiltration control' measures. 2,Dampers including exhaust, intake, makeup air, back draft and flue dampers shall be closed, but not sealed beyond intended infiltration control measures. 3.lnterior doors, if installed at the time of the test, shall be open, 4.Exterior doors for continuous ventilation systems and heat recovery ventilators shall be closed and sealed. 5.Heating'and Cooling systems, if installed at the time of the test, shall be turned off. 6.Supplyand return registers, if installed at the time of the test, shall be fully open, Company Name: I hereby verify that the above Air Leakage Conservation requirements according to t Signature of Tester: Printed Name of Tester: cults are in accordance with the 2017 6th Edition Florida Building Code Energy compliance method selected above. Date of Test: / \' a� License/Certification #: t�3bu Issuing Authority: