HomeMy WebLinkAboutBLOWER DOOREnvelope Leakage Test Report (Blower Door Test)
Residential Prescriptive, Performance or ERI Method Compliance
2017 Florida Building Code, Energy Conservation, bth Edition
Builder:
Address:
Community: Virg �.,
Unit:
City: 0^ �-� i � �� State: (_ Zip: 3LIGl S7\
Air Leakage Test Results Passing results must meet either the Performance, Prescriptive, or ERI Method
�RESC(tt0'1IVE METH0Ljw The building or dwelling unit shall be tested and verified as having an air leakage rate of not exceeding 7 air
changes per hour at a pressure of 0,2 inch w.g. (SO pascals) in Climate Zones 1 and 2.
PR�ORCNAIVIv or ERI M�7H�JU-The buildin6 or dwelling unit shall be tested and verified as having an air leakage rate of not exceeding
the selected ACH(50) value, as shown on FORM R405-2017 (Performance) or R405-2017 (ERI), section labeled as Infiltration, sub -section ACM.
ACH(50) specified on Form R405�2017"Fnergy Calc (Performance) or R406"2017 (ERI):
x 60
CFM(50)
ZOOPASS
Building Volume
ACH(50)
When ACH(50) is less than 3, Mechanical Ventilation
installation MUSL be verified by building department.
.Method far calculating building volume:
DRetrieved from architectural plans
Code software calculated
_O Field measured and calculated
Tes#Nng. Testirtg shall be conducfied in accordance with ANSI/RESNET'/ICC 380 and reported at a pressure or 0,� inche w.g. (50 Pascals). Testing
shall be conducted by either individuals as defined in Section 553.993(5) or (7), Florida Statues, or individuals licensed as set forth in Section
4894105(3)(f), (g), or (i) or an approved third party. A written report of the results of the test shall be signed by the party conducting the test and
provided to the code official, Testing shall be performed at any time after creation of all penetrations of the building thermal envelope,
During testing.
1.Exterior windows and doors, fireplace' and stove doors shall be closed, but not sealed, beyond the intended weatherstripping or other infiltration
control' measures.
2.Dampers including exhaust, intake, makeup air, back draft and flue dampers shall be closed, but not sealed beyond intended infiltration control
measures.
3.Interior doors, if installed at the time of the test, shall be open,
4,Ext&rior doors for continuous ventilation systems and heat recovery ventilators' shall be closed and sealed.
5.Heating and cooling systems, if installed at the time of the test, shall be turned off.
6.Supply and return registers, if installed at the time of the test, shall be fully open.
I hereby verify that the above Air Leakage results are in accordance with the 2017 6th Edition Florida Building Code Energy
Conservation requirements according tohe compliance method selected above.
Signature of Tester:
Printed Name of Tester:
License/Certification #: Y'"G%af i"t Issuing Authority: �fi-��'(�� 1