Loading...
HomeMy WebLinkAboutBlower Door Test Plannin &Development Services -- g P 3.1` Buiilding.&Code.Regulation Division RECEIVED 2300 Virginia Ave,Rm 201 • - I Fort Pierce,FL 34982 SEP 2 3 2020 111111111111117 Phone:.772-46V2165 Fa*772-462-6443 permitting Department St. Lucie County BLOWER DOOR TEST FORM House Infiltration Test Certification Prescriptivq a,nd;Performance Method Date: C! ! t`1 � 7-o 2,o Permit#: S-Lc, [ CL 10 � T .Q is Contractor: C a Job Address: 2y(0°1 J o�� In, �_o IR C9 �i4-A 7k erg e__ 13 q aj1°t Construction; Vhgl New-Construction-Complete ( Existing-After Addition. House.Infiltration Test Results S.LC Climate Zone 2 CFM(50) Test_Date: Volume= �"� 2�?to ACH(50) CFM(50)x 60 Volume= .�,+�3_I Mechanical Ventilation required less than 3 ACH Passing results must be&ACH(50)or less Pass ( )Fail FBC,Energy The-building or dwelling unit shall be tested and verified as having an air leakage rate of not exceeding 3 airchanges.per hour in Climate Zone 1,7 and 3-air changes per hour in Climate Zones 3 through 8. Testing shall be conducted with a blower door at a pressure of 0.2 inches W.g-(50 Pascals). Testing shall be cgnducted by ether individuals as defined in Section 553.993(5.)or(7),Florida Statutes or individuals licensed asset forth-in.Section 489.105(3)(f),(g)or(i)or an approved third party. A written report of the results of the test shall be signed by the party conducting the test and provided to the code official. Testing shall be performed at anytime after creation of all penetrations of the building thermal envelope. FB.C,Residential Where the air infiltration rate of a dwelling'unit is less than 3 air changes per hour when tested with a blower door at a pressure of0.2 inch w.c.(50 Pa)in accordance with Section R402.4.1.2 of the Florida Building Code,Energy Conservation the dwelling unit shall be provided with whole-house mechanical venti4atigtl in accordance with Section.M1507.3, Testing Company , Company Name: Ce-f �� �� 1J� ►ey" �f- Address: «Q t�(e Q r� - 1 hereby,certify that the above House Infiltration.results demonstrate.compliance with BC.Energy Conservation requirements in accordance with Section i3402A.1,2 ClirnateZone 2. Signatures Printed Name.: TSf License/Certification#: EEC—